ML17158C291
| ML17158C291 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/03/1997 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Pennsylvania Power & Light Co, Allegheny Electric Cooperative |
| Shared Package | |
| ML17158C292 | List: |
| References | |
| NPF-14-A-168, NPF-22-A-142 NUDOCS 9709170325 | |
| Download: ML17158C291 (10) | |
Text
1'E0y "o
Cy 0O g
~o
~+*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PENNSYLVANIA POWER
& LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.
DOCKET NO. 50-387 SUS UEHANNA STEAM ELECTRIC STATION UNIT 1
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
168 License No.
NPF-14 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.. The application for the amendment filed by the Pennsylvania Power Light Company, dated September 25,
- 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9709i70325 970903 PDR ADOCK 05000387 P
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.
NPF-14 is hereby amended to read as follows:
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. '168 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and is to be implemented within 30 days after its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 3,
1997 Jo n
. Stolz, Director P
OJ ct Directorate I-D sion of Reactor Projects I/II Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AMENDMENT NO. >68 FACILITY OPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following page of the Appendix A Technical Specifications with enclosed page.
The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
REMOVE 3/4 4-6 INSERT 3/4 4-6
, 3/4.4.3 REACTOR COOLANTSYSTEM LEAKAGE LEAKAGEDETECTION SYSTEMS LIMITINGCONDITION FOR OPERATION 3.4.3.1 At least the following reactor coolant system leakage detection systems shall be OPERABLE:
a.
Two drywell floor drain sump level channels, and b.
One primary containment atmosphere gaseous radioactivity monitoring system channel or one containment atmosphere particulate radioactivity monitoring system channel aligned to the drywell.
APPLICABILITY: OPERATIONALCONDITIONS 1, 2 and 3.
ACTION:
a.
With one or both channels of the drywell floor drain sump level monitoring system inoperable, operation may continue for up to 30 days provided the drywell floor drain sump flow rate is monitored and determined by alternate means at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With both channels of the gaseous radioactivity monitoring system inoperable and with both channels of the particulate radioactivity monitoring system inoperable, operation may continue for up to 30 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If at least one channel of the affected monitoring system cannot be returned to OPERABLE status and aligned to the drywell within 30 days, or the grab samples are not obtained and analyzed as required, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- c.
With all channels (both channels of the drywell floor drain sump level monitoring
- system, both channels of the gaseous radioactivity monitoring system and both channels of the particulate radioactivity monitoring system) of the reactor coolant system leakage detection systems inoperable be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCEREQUIREMENTS 4.4.3.1 The reactor coolant system leakage detection systems shall be demonstrated OPERABLE by:
a.
Primary containment atmosphere particulate and gaseous monitoring systems-performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONALTEST at least once per 31 days and a CHANNEL CALIBRATIONat least once per 18 months.
b.
Drywell floor drain sump level monitoring system-performance of a CHANNEL FUNCTIONALTEST at least once per 31 days and a CHANNEL CALIBRATIONat least once per 18 months.
SUSQUEHANNA - UNIT 1 3/4 4-6 Amendment Np. 87 p ggg~ 168
pe REGS "o
Cy 0O Ie Q
~0
++*<<+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PENNSYLVANIA POWER
& LIGHT COMPANY LLEGHENY ELECTRIC COOPERATIVE INC.
DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.142 License No.
NPF-22 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for the amendment filed by the Pennsylvania Power 3
Light Company, dated September 25,
- 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.
NPF-22 is hereby
. amended to read as follows:
3.
.(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 142 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of its date of issuance and is to be implemented within 30 days after its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 3,
1997 Jo F. Stolz, Directo P
'ect Directorate I
D vision of Reactor Projects - I/II Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AMENDMENT NO.
42 FACILITY OPERATING LICENSE NO.
'OCKET NO. 50-388 Replace the following page of the Appendix A Technical Specifications with enclosed page.
The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
REMOVE 3/4 4-6 INSERT 3/4 4-6
REACTOR COOLANTSYSTEM
< 3/4.4.3 REACTOR COOLANTSYSTEM LEAKAGE LEAKAGEDETECTION SYSTEMS LIMITINGCONDITION FOR OPERATION 3.4.3.1 At least the following reactor coolant system leakage detection systems shall be OPERABLE:
a.
Two drywell floor drain sump level channels, and b.
One primary containment atmosphere gaseous radioactivity monitoring system channel or one containment atmosphere particulate radioactivity monitoring system channel aligned to the drywell.
APPLICABILITY: OPERATIONALCONDITIONS 1, 2 and 3.
ACTION:
a.
With one or both channels of the drywell floor drain sump level monitoring system inoperable, operation may continue for up to 30 days provided the drywell floor drain sump flow rate is monitored and determined by alternate means at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With both channels of the gaseous radioactivity monitoring system inoperable and with both channels of the particulate radioactivity monitoring system inoperable, operation may continue for up to 30 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If at least one channel of the affected monitoring system cannot be returned to OPERABLE status and aligned to the drywell within 30 days, or the grab samples are not obtained and analyzed as required, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c.
With all channels (both channels of the drywell floor drain sump level monitoring
- system, both channels of the gaseous radioactivity monitoring system and both channels of the particulate radioactivity monitoring system) of the reactor coolant system leakage detection systems inoperable be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCEREQUIREMENTS 4.4.3.1 The reactor coolant system leakage detection systems shall be demonstrated OPERABLE by:
a.
Primary containment atmosphere particulate and gaseous monitoring systems-performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONALTEST at least once per 31 days and a CHANNEL CALIBRATIONat least once per 18 months.
b.
Drywell floor drain sump level monitoring system-performance of a CHANNEL FUNCTIONALTEST at least once per 31 days and a CHANNEL CALIBRATIONat least once per 18 months.
SUSQUEHANNA - UNIT2 3/4 4-6 Amendment No."~~ "+~ ~42