Hr. Robert G,
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101 rgb December 18, 19~
SUBJECT:
RE(VEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 92-08 SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 (TAC NOS.
H85613 AND M85614)
Dear Hr. Byram:
The staff has reviewed Pennsylvania Power and Light Company's,(PP&L's) response dated August 2, 1995, to our request for additional information (RAI) of June 13,
- 1995, regarding Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers."
In accordance with that letter, PP&L was required, pursuant to Section 182A of the Atomic Energy Act of 1954,. as
- amended, and 10 CFR 50.54(f), to submit written reports, under oath of affirmation, that provided the information specified in the RAI.
On the basis of our review, we have determined that the PP&L's response to the RAI is incomplete.
The specific areas are discussed in the enclosure.
Please provide your response to this RAI within 45 days of receipt.
If you have any questions concerning the information being requested, please contact me -on (301) 415-1402.
Sincerely,
/s/
Chester
- Poslusny, Senior Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket Nos.
50-387/388
Enclosure:
RAI cc w/encl:
See next page DISTRIBUTION Docket File PUBLIC PDI-2 Reading SVarga/JZwol inski JStolz CPoslusny MO'Brien JCalvo LTran OGC ACRS
- WPasciak, RGN-I OFFICE RJenkins PDI-2 PH 1%g 85<S~+
PI2 NAME CPoslusny:rb J tolz DATE
/,96 l [0/96 i~ i<96 OFFICIAL RECORD COPY DOCUMENT NAME: 'U85613.RAI 9612240037 9hiai8 PDR 'DQCK 05000387 P
~
I II
/j I I'I 4
N
gP,S R500
~o Cy 0O IVi qO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 18, 1996 Hr. Robert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown PA 18101
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 92-08 SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 (TAC NOS.
M85613 AND M85614)
Dear Mr. Byram:
The staff has reviewed Pennsylvania Power and Light Company's (PP&L's) response dated August 2, 1995, to our request for additional information (RAI) of June 13,
- 1995, regarding Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers."
In accordance with that'letter, PP&L was required, pursuant to Section 182A of the Atomic Energy Act of 1954, as
- amended, and 10 CFR 50.54(f), to submit written reports, under oath of affirmation, that provided the information specified in the RAI.
On the basis of our review, we have determined that the PP&L's response to the RAI is incomplete.
The specific areas are discussed in the enclosure.
Please provide your response to this RAI within 45 days of receipt.
If you have any questions concerning the information being requested, please contact me on (301) 415-1402.
Sincerely, Docket Nos. 50-387/388
Enclosure:
RAI cc w/encl:
See next page PGO 8~~
Chester
- Poslusny, Senior Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Hr. George A. Hunger, &
PECO Energy Company t
Limerick Generating Station, Units 1
8 2
CC:
J.
W. Durham, Sr.,
Esquire Sr. V.P.
& General Counsel PECO Energy Company 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. David P. Helker, MC 62A-1 Manager-Limerick Licensing PECO Energy Company 965 Chesterbrook= Boulevard
- Wayne, Pennsylvania 19087-5691 Hr. Rich R. Janati, Chief Division of Nuclear Safety PA Dept. of Environmental Resources P. 0.
Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Michael P. Gallagher Director - Site Engineering Limerick Generating Station P. 0.
Box A
- Sanatoga, Pennsylvania 19464 Hr. Walter G. MacFarland, Vice Limerick Generating Station Post Office Box A
- Sanatoga, Pennsylvania 19464 President Hr. James L. Kantner Manager-Experience Assessment Limerick Generating Station P. 0.
Box A
- Sanatoga, Pennsylvania 19464 Hr. Robert Boyce Plant Manager Limerick Generating Station P.O.
Box A
- Sanatoga, Pennsylvania 19464 Library US Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Ludwig E. Thibault Senior Manager Operations Limerick Generating Station P. 0.
Box A
- Sanatoga, Pennsylvania 19464 Hr. Neil S. Perry Senior Resident Inspector US Nuclear Regulatory Commission P. 0.
Box 596 Pottstown, Pennsylvania 19464 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Hr. Darryl P.
Lequia Director - Site Support Services Limerick Generating Station P.O.
Box A
- Sanatoga, Pennsylvania 19464 Chairman Board of Supervis'ors of Limerick Township 646 West Ridge Pike Linfield, PA 19468 Regional Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406
FOLLOW-UP RE VEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 92-08 "THERMO-LAG 330-1 FIRE ARRIERS" SUS UEHANNA STEAM EL C
C S
A IO UNITS D 2 DOCKET NOS. 50-387 AND 50-388
1.0 BACKGROUND
By letter dated August 2,
- 1995, Pennsylvania Power and Light Company (the licensee) submitted a response to the staff's Request for Additional Information (RAI) dated June 13, 1995, related to Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers," for Susquehanna Steam Electric Station (SSES),
Units 1 and 2.
The licensee stated that a preliminary evaluation of ampacity derating for Thermo-Lag-enclosed raceways installed at SSES indicated that for all cases except 3-hour fi're rated conduits on Unit 2, the allowable derating is greater than the factors derated from the Texas Utilities Electric Company's (TUEC) tested configurations.
- Further, the licensee stated that destructive examinations and detailed field walkdowns would be utilized to confirm that the SSES installed Thermo-Lag configurations are representative of the TUEC-tested configurations.
The staff has completed the review of the licensee's submittal and requires that the following questions be addressed by the licensee.
2.0 QUESTIONS
- 2. 1 In your submittal dated August 2,
- 1995, you did not specify a derating value for the 3-hour fire rated conduit configurations since TUEC did not include any of the subject barriers in their test program.
Florida Power Corporation has recently completed ampacity derating tests of 3-hour Thermo-Lag-enclosed conduit configurations.
These tests were conducted in accordance with the Institute of Electrical and Electronic Engineers (IEEE) Standard P848, Draft 16, "IEEE Standard Procedure for the Determination of the Ampacity Derating of Fire-Protected Cables," at the Underwriters Laboratories Northbrook Testing Station in Northbrook, Illinois. -Given this new test data for 3-hour fire rated conduit configurations please describe how you have incorporated this information and what are the ampacity derating factors now being utilized for the 3-hour Thermo-Lag fire barriers in the SSES electrical design calculations.
2.2 Describe whether the results of your destructive examinations and detailed field walkdowns to date demonstrate that all of the installed configurations are representative with the TUEC-tested configurations.
In the event of any deviations with the TUEC-tested configurations, the licensee is requested to ascertai'n their impact on previous ampacity derating determinations.
ENCLOSURE