I g-yq 58K September 3~1996 NOTE TO:
Docket File FROM:
Joseph W. Shea, Project Manager
/S/
Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
SUBJECT:
BACKGROUND DOCUMENTS REGARDING POSTULATED LOSS OF SPENT FUEL POOL COOLING EVENTS, SUS(UEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 The attached documents were provided by PECO Energy Company to the NRC staff on September 3,
1996 and September 25, 1996.
The documents were provided to support PECO's verbal notification of planned inspections and as-found flaws in the Peach Bottom Unit 2 core spray system during the ongoing Unit 2 refueling outage.
The documents include system drawings that show the location of the system welds and as-found flaws as well as documents that describe PECO's proposed disposition of the flaws.
PECO stated in a teleconference on September 25, 1996, that similar information as well as more detailed information would be formally submitted for staff consideration on or about September 26, 1996.
Please place the attached documents in the Peach Bottom Atomic Power Station Docket File.
Attachments:
As stated DISTRIBUTION: w/attachments PUBLIC
- PDI-2 Reading
- JShea
- MO'Brien JStolz OFFICE NAME DATE 96 P I- /PM hea
/ t/96 P
-2/PD JS
/96 OFFICIAL RECORD COP FILENA E:
- iSHEAiCSDOCKET.NOT HIIIlHLF. ggIIIgg gIPV g<<l A ~,~ )"ig,g 9hi0030i i9 960930 j
PDR ADOCK 05000387 P
0' i
t '
~R R500 (4
~o Cy ClO IV)
R 0
~O
+w*w+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 30, 1996 NOTE TO:
Docket File FROH:
Joseph W. Shea, Project Hanager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
SUBJECT:
BACKGROUND DOCUHENTS REGARDING CORE SPRAY SYSTEH FLAW INDICATIONS, PEACH BOTTOH ATONIC POWER STATION, UNIT 2 The attached documents were provided by PECO Energy Company to the NRC staff on September 3,
1996 and September 25, 1996.
The documents were provided to support PECO's verbal notification of planned inspections and as-found flaws in the Peach Bottom Unit 2 core spray system during the ongoing Unit 2 refueling outage.
The documents include system drawings that show the location of the system welds and as-found flaws as well as documents that describe PECO's proposed disposition of the flaws.
PECO stated in a
teleconference on September 25, 1996, that similar information as well as more detailed information would be formally submitted for staff consideration on or about September 26, 1996.
Please place the attached documents in the Peach Bottom Atomic Power Station Docket File.
Attachments:
As stated
0
'I J1 f
t C
Posit Fax Note 7371 Tc C.
Date Fax I PECO EÃERGF PEACH BOTTOMATOMICPOP'ER STATION UMT2 REFUELING OUTAGEI1 (2Rl1)
RPV AVTERVALXWSPECTIOWS CORE SERIF HE.IDEE 7-BOX COVEEPLATE IPSPECTEOX
Peach Bottom Atomic Power Station 2R1i Core Spray Header T-Box Coverplate Inspection In cin CEV lOll
+ AllCore Spray Piping Welds In Annulus Region Exainined Using Enhanced VT-1 Visual Technique (I/2 MilResolution)
Per BWR VIP-18 Guidance
+ Crack-Like Indications Identified On "8"Loop Header T-8ox Cover Plate (%'eld P28 - Azimuth 120 Degrees)
+ Indications Grouped AtTwo Locations On Pace Of Cover Plate 3 O'lock 9 O'lock
+ No Other Indications Identified
Peach Bottom Atomic Power Station 2R11 Core Spray Header T-Box Coverplate Inspection n 'ip D
'l
+ Indications Are Symmetric About the 3 Ec 9 O'lock Locations
+ Indications Are Located Approximately 1/32" to 1/8" From Toe OfWeld ddi onal er ~tions e
Cover Plate Weld Adjoins The Welds Connecting The Header Pipes To T-Box Increasing Stiffness At Indication Locations
+ Clearance Between T-Box Junction Header Piping And Shell is < 0.1"
+ Evidence OfCold Work {Grinding, Tool Marks) Observed In Area Of9 O'lock Indication
+ No Indications Identified In "A"Core Spray Loop Cover Plate (Azimuth 240 Deg.)
M m
0 Peach Bottom Atomic Power Station 2R11 Core Spray Header T-Box Coverplate Inspection i
e for
¹
+ Residual Welding Stresses Are Expected To Be Higher At The 3 &, 9 O'lock Locations OfCover Plate Weld Due To Extremely Close Proximity OfPipe To T-Box Welds
+ Cover Plate Joint Configuration, Fabrication And Welding
'equences Indicate Small Crevice Geometry
+ Installation And Operational Stresses Are Expected To Be Higher At The 3 &, 9 O'lock Locations Due To Overall T-Box Configuration
+ The Coverplate Is Not A Structural Load Bearing Component And Has High Design Margins Based On Fracture Mechanics
Peach Bottom Atomic Power Station 2R11 Core Spray Header T-Box Coverplate Inspectioa onluio s
+ T-Box Configuration Indicates That AnyResidual Welding Stresses, Fabrication Stresses, And Operational Stresses Are Expected To Be Higher At The 3 8~. 9 O'lock Locations Of The Cover Plate Weld
+ Due To Coverplate Fit-up And Weld Process, It Is Expected That The Crevice Geometry Would Be SmaH And Vary Around The Circumference. Itls LikelyThat The Final Joint Would Contain Regions WithNo Crevice
+ Industry Cracking History OfModerately Creviced Locations Exhibit Good Correspondence OfInside Diameter And Outside Diameter Crack Length
1 Peach Bottom Atomic Power Station 2R11 Core Spray Healer I-Box Coverplate Inspection f4 Ul 63 0)
Gl Q
(0 n
Oz
+ Based On Fracture Mechanics And Using The Factor of Safety Of2.77, Two Opposite Azimuth Locations Of61 Degrees Will Ensure Joint Integrity Through One Cycle
+ Evaluation OfThe Integrity OfThis Joint Is Based On VIP-18 Guidance
+ Based On Above Considerations, Operating For One Cycle Is Acceptable M~
P1>>
-0':
Ill:
(A.
Q>>
6)>>
Ol*.
'i fO <
De A:
~ '>>
Gl >>
Q 1 0);.
>>>>9-l 1
Peach Bottom Atomic Power Station 2R11 Core Spray Healer T-Box Coverplate Inspection C
1 ncl io s
+ No Generic Implications Visually Examined "A"Loop I-Box Coverplate Using EVT-I WithNo Indications IdentiTied "A"Loop Has More Cicarance Between Header Pipe And ShleH No Industry History OfT-Box Junction Coverplate Cracking
TO 91381nls2192 PAGE.999~911 240 AC.
"A" LOOP SUPPORT BRACKET 7-BOX JUHCTION
~ SLEEVE COHNECTION 120'Z.
"S" LOOP SiiROUQ iiTTACHiCNT 8-1 8 (HIOOEH)
~ 8" HEAOER PEPEHC 4b SHHUUU 4c Figure 3-Zi Typical BtllH 3-S Core Spray Piping Configvration
If'S SZ
.1 23 AZ mO 0:
Dn 120 AZ NOZZLE NBA FROID COPE SPRAY PUMPS 880
{ LOOBY B)
120 AZ NOZZLE NBA "B"
LOOP VI 0z¹ XI Dn
4 I
~
~
~ I
~
~
~
~
~
III
/f IQ 7(PPb
.J.
J I
~ ~
~
~
J
~A
~
/
~
I r
/ r I
/ I l
II I i I
~ I I
'I I
1 I
I
~
~
I 'L I
~
l I 1
~ I
~
I 1
f I I ----~-3 1L I C'/
I J /
f I
t /
1,,
J'/
I
. r
~
r'
~
r r
I I
~
J 27 O
DA MIll 37 n
PlMI 0
(0
~
~
PS%PS Unit 2 Core Spray Tee-Box AxDO Qeg LeftSide Angle Approx. 48 Beg.
Right Side Angle Approx. 38 Beg.
DDA Pl Gl C9 f
1 I
\\
QO-Ae-CO2-151 CORE SPRAY SCARCER )RIEIITATIOII O(.
Oi DAACZEIt PPROT.
276 319 l
I Ii i ti Ti Si Ill ISA Sl ITA 362.%
I>
P4 SIO I
I I
ldl t'll Zbi 1$i 27i Zbi Zli 33i 35A 3)i 371 414 Iti 45A Irl 4tl Sll Stl SSA STA Csl Cll Ctl 66l 3
11 4A Cl di ldl Ill I ~ 7 lsl ldi Tdl 2TA 24i 2sl 24l 304 374 547 36 tdi 404 ltl Ill 167 49i 60i rti $4i 60 Sdl SOA Sti SIA 0trf0 5lit LOPf0
$48'2 L
LLLLLLLLLLLL L rrrrrrrrrrrr LLLLLLLLLLLLLJJJ JJJJJJJJJJJJJJ.
I rrrrrrrrrrrrrrrr-1111111-l11111
$ 441 JJJJJJJJ JJJ IJ 111111111111
$ 481 I
I ldd 700 228 24 ZP Zdt 370 Ztl 349 361 348 IOS 429 449 Itl 4N SN SZS 501 SS Cbd 108 dtd CII
~Le 5 51 ~
lilt OF 6'fLD 558 Ite ZID tss 258 278 Zse 31S sts 3 0 57 ~ 510 <<I 458 468 470 488 Sla
$30 sss sle Ssl die dts 4 8 48 98 de 109 170 741 190 Za sd Tl Ss Ile I 0 I e Ire Dt 5 53C P5 5
ZC SC
~ Trt IP4SI 50c Sft 54t 58 5et 60t Clt $4 44CI Ottfd SICZ t
LLLLLLLLLLLLLILLLL JJJJJJJJJ.IJJJ JJJJJJJJJJJJ I I I I I I I.I I, rl I 1111 l11111111111 1
I 11111 l11 "l111 1
5481 180 2%I Zrl TID 2$0 1st 31D 3rd 3
36 300 IN 470 447 460 48D IN STD 54 SCD $80 C00 CZO C4 5'ID I'lit % 667 0 750 ZIO 770 ZID 271'90 310 330 540 370 5% 410 470 1$0 <<D 459 SID SSD I 0 570 5 0 CIO C3D 650 L LLLLLLLLLLLLL r rrrrrrrrrrrrr Ldhfh 5472 19 40 60 80 100 IZD 140 160 I
30 ID 7
~
50 ID IZR 710 I 0
Its I fthm Itrs ZZI tC4 I
I I
I I
I IC 3C iC TC SC lit 13c 15C l)t Isc 2IC 23t Zic 21C 25c Slt 1')t 31C l)t 3)c 41C 43t 45t IIC I lt c 57C 51 Clc C I
5 IC Zc Ic Cc Sc loc Itc 74 Idc Idc Zbc 22) ZIC Zdc rdc )lt 37 34c 36 Zdc Iac Itc 44t 46 Ist I
aI 8
ml
~
~
~
~
"0 Stillfe RftiIR PPPIPKT 7.5 ir Ite 02 DPLTI Atle 5$ 011017 72 tll ~metr 007etw AtlCIOA tetttORS 755$ 5L 05ML5 Ihr5 DAAWIPC SLPERLEOIS ILO RTLAP Aft 0, AO)fd RILD 747.'5 FOll 151 PIOOAAIL KAQI RIIHNteric DO'ER 5TAIxw 0%15 2 D 3 PEI EPKFGY CN4PA74Y CP 3
t 6280 C
0 ) CIPPL~
t I OP Clhil 1SI-203~~
2 1
c
~
LS-AB-GR-1Sl ZCO l) WZ)LE IHH FAM CORE ttHl) PU)H<<t l)C
)LOOF l) t)l I HIOOEH)
OE)iIL 0$~
,/
tA'C OORTCOHEO 1$7$ RZ 1$ 6 Il 0 ~IWCCHH$
PS)1 I)ZS AZ I<<0
<<l)C
)97 l)
)66 AZ~P)H)
Zlt 1I 0
PSC I)9 AZ 0
'<<C
)0 ~
t)$<<
)0'cb tbC S)E OEIl)L ll PO<<C PTC
~ET))L CC
)l)L ll
~
~
ZO
~
~
9 IOHHCRHEO P)b)
SEE OE)l)L CO II) RZ~
96)$ l)
~S)6))
~- P)0 SEE OE P<<<<R)
SEE OETI)L OI E OOH)COHEA P)0)
SEE IL)l)L CC I'6$
PSH t)$
t<cb tt)
PC) t)l t)cl I'IO <<H)0$)H)
PR)l)
IZO l) AOZ'LE WR FA04 COAE StHll PIHHS $)H
)LOOP 0)
OEIAIL "CG" 0)HHCOHEH A)tll~ CLR)H LH)T 9 ~l
<<0<< 9 <<0 OanrCaakt
$)a.T B
C7 00 Oo I
C0 C0 QETAIL "Ba"
$0aelHEO )Etl)) a)RP UAIT 0.0 OOOXCINEA aH.)
~CLOS I1)t) tb0 CILLll tbc )TP Pll 1)P SEE EEI)IL ll tH<<)
~Idl fb<<O SEE OE)l)L ll fb)$
I "P
OElAIL "DO" IEROEA R)tl)H HRIC)ET 170 ) SC ~ )Z Ctl HN)I 9 04.))
/
<<<<<<II~
OR)URO SHRCOO t)tE FLFSH llL)TAIL "AA" fHI) HH)R)HC )WEA)EOES
)9)-9$9-)74)<<HEF I ~
H F
C lKKHlmmN AZNN:RlHR STAIIOT Mll<<f 0 3 f))ILINKLPNAELECTRIC ~)IT<<
lSl-283-RV-87 1
2 L'D
<<)0
October 30, 1996 DISTRIBUTION Docket Pile PDI-2 Reading MEMORANDUMTO:
Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration FROM:
SUBJECT:
Office of Nuclear Reactor Regulation SUSqUEIQÃNA STEhtf ELG:TRIC STATION, UNITS 1 and 2 One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication.
Additional conformed copies
(
5
) of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit(s) and Operating License(s).
Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):
Time for submission of Views on Antitrust matters.
Notice of Consideration of Issuance of Amendment to Facility Operating License.
(Call with 30-day insert date).
Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.
Notice of Availabilityof NRC Draft/Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Availabilityof Safety Evaluation Report.
Notice of Issuance of Construction Permit(s).
Notice of Issuance of Facility Operating License(s) or Amendment(s).
Order.
Exemption.
Notice of Granting Exemption.
Environmental Assessment.
C Notice of Preparation of Environmental Assessment.
Receipt of Petition for Director's Decision Under 10 CFR 2.206.
Issuance of Final Director's Decision Under 10 CFR 2.206.
Other:
'0-387/388 Attachment(s):
As stated
Contact:
Telephone: H. O'Brx~
415-1414 DOCUMENT NAME:
To receive a copy of this d u
OFFICE NAME DATE indicate In the boxopy without attachment/enclosure E
~ Copy with attachment/encloauro N
~ No copy OFFICIALRECORD COPY
d'
\\
'eptember 3, 1996 DISTRIBUTION PDI-2 Reading MEMORANDUMTO:
Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration FROM:
SUBJECT:
Office of Nuclear Reactor Regulation SUSQUEIGQKA. STEAN E( EC1RXC STATION, UNIT.'rlX One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies
(
5
) of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit(s) and Operating License(s).
Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):
Time for submission of Views on Antitrust matters.
Q Notice of Consideration of Issuance of Amendment to Facility Operating License.
(Cail with 30-day insert date).
Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.
Notice of Availabilityof NRC Draft/Final Environmental Statement.
4 Notice of Limited Work, Authorization.
Notice of Availabilityof Safety Evaluation Report.
Notice of Issuance of Construction Permit(s).
Notice of Issuance of Facility Operating License(s) or Amendment(s).
Order.
Exemption.
Notice of Granting Exemption.
Environmental Assessment.
Notice of Preparation of Environmental Assessment.
Receipt of Petition for Director's Decision Under 10 CFR 2.206.
Issuance of Final Director's Decision Under 10 CFR 2.206.
Other:
DOCKET N0e 5Q 387 Attachment(s):
As stated
Contact:
lf pt g Telephone:
DOCUMENT NAME:
To receive a copy of t i ocuma
. indicate In the box: 'C
~ Copy without attachmantlanclosure E
~ Copy with attachmant/enclosure N
No copy OFFICE NAME DATE OFFICIALRECORD COPY
0 m
f
July 24, ~1996 DOCKET FILE PDI 2 Reading MEMORANDUMTO:
FROM:
SUBJECT:
Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration Office of Nuclear Reactor Regulation SUB@BQQKA,-STEAN ELECTRIC STATION".'NITS 1 AND 2 One signed original of the Federal Register Notice identified below is attached for your transmittal to the Office of the Federal Register for publication. Additional conformed copies
(
5
) of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit(s) and Operating License(s).
Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):
Time for submission of Views on Antitrust matters.
Notice of Consideration of Issuance of Amendment to Facility Operating License.
(Call with 30-day insert date).
Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.
~,Notice of Availabilityof NRC Draft/Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Availabilityof Safety Evaluation Report.
Notice of Issuance of Construction Permit(s).
Notice of Issuance of Facility Operating License(s) or Amendment(s).
Order.
Exemption.
Notice of Granting Exemption.
Environmental Assessment.
Notice of Preparation of Environmental Assessment, Receipt of Petition for Director's Decision Under 10 CFR 2.206.
Issuance of Final Director's Decision Under 10 CFR 2.206.
Other:
Ta
'J
%LENT DOCKS NO.
5p 387/388 Attachment(s):
As stated
Contact:
TelephoneP. O'rien 415-1414 DOCUMENT NAME:
To receive a copy ot this u
nt, i to In the box: "C ~ Copy without attachmentlenclosure OFFICE NAME
'E' Copy with attachment/enclosure N
No copy DATE 96 OFFICIALRECORD COPY
l H