Amend 153 to License NPF-14,extending one-time Basis Allowed AOT from 3 to 7 Days for One Offsite Circuit Being Out of Svc
ML17158A864
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 08/31/1995
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Allegheny Electric Cooperative, Pennsylvania Power & Light Co
Shared Package
ML17158A865 List:
References
NPF-14-A-153 NUDOCS 9509060123
Download: ML17158A864 (4)


Text

(4gy,A RE'00

~o Cy I

(l0 I

Cy 4~

gO

~+*<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-M01 NS LVANIA POW R

IG T COMPANY LEGH NY ELECT IC COO ERATIVE INC.

DOCKET NO. 50-387 SUS UEHANNA STEAM ELECTRIC STATION UNIT 1 ME DMENT TO FACILITY OPERATING LICENSE Amendment No. 153 License No.

NPF-14 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A. The application for the amendment filed by the Pennsylvania Power 8I Light Company, dated April ll, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9509060i23 95083i ~

PDR ADOCK 05000387 P

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:

(2) Technical S ecifications and Environmental Protectio Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 153 and the Environmental Protection Plan con-tained in Appendix 8, are hereby incorporated in the license.

PP8L shall operate the facility in accordance with the Technical Specifica-tions and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and is to be implemented within 30 days after its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 31, 1995

ATTAC MENT TO LICENSE AM D

NO.

153 F CILITY OPERATING LICENSE 0.

NPF-4 OOCK T NO. 50-38 Replace the following page of the Appendix A Technical Specifications with enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

REMOVE 3/4 8-la INSER 3/4 8-la

LIMITINGCONDITION FOR OPERATION (Continued)

MXg}5: (Continued) 3.

Restore both offsite circuits to OPERABLE status within 73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With one diesel generator of 3.8.1

~ 1.b inoperable, 1.

Perform Surveillance Requirement 4.8,1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and 2.

For each of the remaining three

OPERABLE, aligned diesel generators:

a.

Verify Surveillance Requirement 4.8.1.1.2.a.4 has been successfully performed within the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or b.

Perform Surveillance Requirement 4.8.1.1.2.a.4 sequentially on each diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and 3.

Restore'the diesel generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, This time is extended to 7 days during the installation of the T-10 230kV switchyard that is scheduled for the Fall of 1995.

This ACTION is not required to be performed if the absence of common cause for diesel generator in'operability can be established for the diesel generators (i.e. cause can be established and does not represent a common mode/generic failure mechanism for the remaining OPERABLE diesel generators).

SUSQUEHANNA - UNIT 1 r

r r ~

3/4 8-1 a Amendment No. fg7,153