Download: ML17158A827 (4)


Text

, Hr. Robert G.

Byram Senior Vice President~ckear Pennsylvania Power'nd Light Company 2 North Ninth Street Allentown, PA 18101 August 15

'5

SUBJECT:

EXEMPTION FROM CERTAIN RE(UIREHENTS OF 10 CFR PART 50, APPENDIX J, "PRIMARY REACTOR CONTAINMENT LEAKAGE TESTING FOR WATER-COOLED POWER REACTORS,"

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1

AND 2 (TAC NOS.

H91013 AND H91014)

Dear Hr. Byram:

The Commission has issued the enclosed exemption from certain requirements of 10 CFR Part 50, Appendix J, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors."

This exemption is related to your application dated November 21,

1994, as supplemented by letters dated February 21,
1995, March 28, 1995, April 10,
1995, May 24,
1995, and June 23, 1995, to modify an existing exemption which allows the leak rate testing of the HSIV at a reduced pressure and excludes the measured leakage from the combined local leak rate test results.

The original exemption is contained in the Susquehanna Steam Electric Station (SSES),

Units 1 and 2, Safety Evaluation Report (NUREG-0776).

The exemption relates to the requirements of 10 CFR Part 50, Appendix J, Sections II.H.4, III.C.2, and III.C.3.

The exemption is necessary to allow the proposed deletion of the Main Steam Isolation Valves (HSIV) Leakage Control System (LCS) and proposed use of an alternate leakage pathway.

This modification is scheduled to be implemented for SSES, Unit 2 during the upcoming 7th refueling outage scheduled to begin on September 9,

1995, and for SSES, Unit 1, during the ninth refueling outage scheduled to begin on September 7,

1996.

A copy of the exemption'is being forwarded to the Office of the Federal Register for publication.

JStolz CPoslusny HO'Brien OGC EJordan GHill(4)

ACRS(4)

CBerlin er, Docket Nos.,50-387/388

, /I

Enclosure:

As stated cc w/encl Se'e next page DISTRIBUTION Docket Fil e

'UBLIC PDI-2 Reading WRussell/FHiraglia RZimmerman RSpessard JLieberman SVar a JZwolinski Sincerely,

/S/

Chester

Poslusny, Sr, Project Manager Project Directorate I-2 Division of, Reactor Projects - I/II Office of Nuclear Reactor Regulation WDean CAnderson, RGN-I D( ~ (9-0Q&7 OFFICE NAME PDI 2,M S

B CPos usny CBer e

0 C

P 2

D Jst DR DATE

/

95

/ I/95

/

/95

/

/95

/95 9508i80089 9508i5

'DR ADOCK 05000387 P

PDR, 5j7<QI FI'lK Gl'EkiIEE CDlR"

1 r

l l

1' J

H

'r e

'bl C,

1 I

I hl k'

l.

h

'I J

ll lf Il

'V

'D Vf'F I

~

r,

<P,R RE00

~

1 y

~

"o 0

C O

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20M&4001 August 15, 1995 Hr. Robert G.

Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101

SUBJECT:

EXEMPTION FROM CERTAIN REQUIREMENTS OF 10 CFR PART 50, APPENDIX J, "PRIMARY REACTOR CONTAINMENT LEAKAGE TESTING FOR WATER-COOLED POWER REACTORS,"

SUS(UEHANNA STEAN ELECTRIC STATION, UNITS 1

AND 2 (TAC NOS.

H91013 AND H91014)

Dear Hr. Byram:

The Commission has issued the enclosed exemption from certain requirements of 10 CFR Part 50, Appendix J, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors."

This exemption is related to your application dated November 21,

1994, as supplemented by letters dated February 21,
1995, March 28, 1995, April 10,
1995, May 24,
1995, and June 23, 1995, to modify an existing exemption which allows the leak rate testing of the HSIV at a reduced pressure and excludes the measured leakage from the combined local leak rate test results.

The original exemption is contained in the Susquehanna Steam Electric Station (SSES),

Units 1

and 2, Safety Evaluation Report (NUREG-0776).

The e'xemption relates to the requirements of 10 CFR Part 50, Appendix J, Sections II.H.4, III.C.2, and III.C.3.

The exemption is necessary to allow the proposed deletion of the Hain Steam Isolation Valves (HSIV) Leakage Control System (LCS) and proposed use of an alternate leakage pathway.

This modification is scheduled to be implemented for SSES, Unit 2 during the upcoming 7th refueling outage scheduled to begin on September 9,

1995, and for SSES, Unit 1, during the ninth refueling outage scheduled to begin on September 7,

1996.

A copy of the exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely, Docket Nos.

50-387/388

Enclosure:

As stated cc w/encl:

See next page Chester

Poslusny, Sr, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Mr. Robert G.

Byram Pennsylvania Power 5, Light Company Susquehanna Steam Electric Station, Units 1

8 2

cc Jay Silberg, Esq.

Shaw, Pittman, Potts
5. Trowbridge 2300 N Street N.W.

Washington, D.C.

20037 Bryan A. Snapp, Esq.

Assistant Corporate Counsel Pennsylvania Power E Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.

M. Kenny Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street

.Allentown, Pennsylvania 18101 Mrs. Maitri Banerjee Senior Resident Inspector U.

S. Nuclear Regulatory Commission P.O.

Box 35 Berwick, Pennsylvania 18603-0035 Mr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. 0.

Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.

212 Locust Street P.O.

Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Vice President-Nuclear Operations Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box-467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1,

Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Engineering Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Chairman Board of Supervisors 738 East Third Street

Berwick, PA 18603