ML17158A757

From kanterella
Jump to navigation Jump to search
Forwards LER 95-008 Shift Average Thermal Power Level for Unit 2 Was Exceeded by Up to 4 Mwt During Unit 2 Cycle 7 Operation as Result of Instrumentation Problems
Date released: 09/18/2017 Download: ML17158A757


LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation
ML18017A046
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 07/07/1995
From: Wehry R
PENNSYLVANIA POWER & LIGHT CO.
To:
References
Download: ML18017A046 (5)
Forwards LER 95-008 Shift Average Thermal Power Level for Unit 2 Was Exceeded by Up to 4 Mwt During Unit 2 Cycle 7 Operation as Result of Instrumentation Problems
ML17158A756
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 07/07/1995
From: Stanley H
PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17158A756 (2)