Forwards LER 95-008 Shift Average Thermal Power Level for Unit 2 Was Exceeded by Up to 4 Mwt During Unit 2 Cycle 7 Operation as Result of Instrumentation Problems
ML17158A756
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 07/07/1995
From: Stanley H
PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17158A757 List:
References
PLAS-640, NUDOCS 9507110198
Download: ML17158A756 (2)


LER-1995-008, Forwards LER 95-008 Shift Average Thermal Power Level for Unit 2 Was Exceeded by Up to 4 Mwt During Unit 2 Cycle 7 Operation as Result of Instrumentation Problems
Event date:
Report date:
3881995008R00 - NRC Website

text

PRIORITY (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

C ACCESSION NBR: 9507110198 DOC. DATE: 95/07/07 NOTARIZED: NO FACZL:50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva AUTH.NAME AUTHOR AFFILIATION STANLEY,H.G.

Pennsylvania Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards LER 95-008 shift average thermal power level for Unit 2 was exceeded by up to 4 MWt during Unit 2 Cycle 7

operatioin as result of instrumentation problems.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES'OCKET 05000388 P

0 RECIPIENT ZD CODE/NAME PD1-2 PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DOPS/OECB NRR/DRCH/HICB NRR/DSSA/SPLB NRR/DSSA/SRXB RGN1 FILE 01 EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME POSLUSNY,C OD/~D/

B FILE CENTER NRR/DE/EELB NRR/DISP/PIPB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/S PS B/B RES/DSIR/EIB LITCO BRYCE,J H

NOAC POORE,W.

NUDOCS FULL TXT COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 1

1 1

1 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL 27

Pennsylvania Power & Light Company Two North Ninth Street~Allentown, PA 18101-1179 ~ 215/774-5151 July 7, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION LICENSEE EVENT REPORT 95-008-00 PLAS -

6<0 FILE R41-2 Docket No. 50-388 License No. NPF-22 Attached is Licensee Event Report 95-008-00.

This report is being made pursuant to NRC Document SSINS ¹0200, "Discussion of Licensed Power Level", in that the shift average thermal power level for Unit 2 was exceeded by up to 4 MWt (0.0116% of rated core thermal power) during Unit 2 Cycle 7 operation as a result of instrumentation problems.

~

~

H.G. Stanley VP - Nuclear Operations RRW/toc cc:

Mr. T.T. Martin Regional Administrator, Region I

U.S. Nuclear Regulatory Commission

475 Allendale Road King of Prussia, PA 19406 Ms. Maitri Banerjee Sr. Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35 Berwick, PA 18603-0035 95071 10198 950707 PDR ADOCK 05000388 8

PDR