ML17158A721

From kanterella
Jump to navigation Jump to search
Amends 146 & 116 to Licenses NPF-14 & NPF-22,respectively, Deleting TS 3/4.3.8,turbine Overspeed Protection Sys
ML17158A721
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/01/1995
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Pennsylvania Power & Light Co, Allegheny Electric Cooperative
Shared Package
ML17158A722 List:
References
NPF-14-A-146, NPF-22-A-116 NUDOCS 9506220123
Download: ML17158A721 (13)


Text

pe AE'gy P

Cy O

rg O~

+~

~o

++**4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PENNSYLVANIA POWER 8E LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-387 SUS UEHANNA STEAM ELECTRIC STATION UNIT 1

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. > I6 License No. NPF-14 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power 5 Light Company, dated April 30,

1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), ".

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the'health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimi'cal to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9506220f2'3 95pgpg PDR ADQCK 05000287 P

PDR

~~

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.

NPF-14 is hereby amended to read as follows:

(2)

Te h ic 1

S ecifications and Envi pnme tal Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 146 and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the license.

PPKL shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and is to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 1, 1995 J

F. Stolz, Direc or P oject Directorat

-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

ATTACHMENT TO LICENSE AMENDMENT NO.

146 FACILITY OPERATING LICENSE NO.

NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

INSERT 3/4 3-94 B 3/4 3-7 3/4 3-94 B 3/4 3-7

INSTRUMENTATION 3 4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM LIMITINGCONDITION FOR OPERATION 3.3.8 DELETED SUSQUEHANNA - UNIT 1 3/4 3-94 Amendment No.

gg, 146

INSTRUMENTATION BASES 3/4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM DELETED 3 4.3.9 FEEDWATER/MAINTURBINE TRIP SYSTEM ACTUATIONINSTRUMENTATION The feedwater/main. turbine trip system actuation instrumentation is provided to initiate action of the feedwater system/main turbine trip system in the event of failure of feedwater controller under maximum demand.

SUSQUEHANNA - UNIT 1 B 3/4 3-7 Amendment No. i46

pe RK0y "o

Op 0O IIA Q

~O

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 2055&0001 PENNSYLVANIA POWER 5 LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION UNIT 2 1I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 116 License No. NPF-22 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power 8

Light Company, dated April 30,

1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),.

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the -common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

V II

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2) Techn ca S ecifications nd Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 116 and the 'Environmental'rotection Plan contained in Appendix B, are hereby incorporated in the license.

PP8L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This 'iicense amendment is effective as of its date of issuance and is to be implemented within 30 days.

FOR THE NUCLEAR R GULATORY COMMISSION

~

~

F. Stolz, Dire tor ject Director at I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 1, 1995

ATTACHMENT TO LICENSE AMENDMENT NO. 116 FACILITY OPERATING LICENSE NO.

NPF-22 DOCKET NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

INSERT 3/4 3-94 B 3/4 3-7 3/4 3-94 B 3/4 3-7

INSTRUMENTATION 3/4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM LIMITINGCONDITION FOR OPERATION 3.3.8 DELETED

'USQUEHANNA

- UNIT 2 3/4 3-95 Amendment No. 116

INSTRUMENTATION BASES 3/4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM DELETED 3 4.3.9 FEEDWATER/MAINTURBINE TRIP SYSTEM ACTUATIONINSTRUMENTATION The feedwater/main. turbine trip system actuation instrumentation is provided to initiate action

~ of the feedwater system/main turbine trip system in the event of failure of feedwater controller under maximum demand.

SUSQUEHANNA - UNIT 2 B 3/4 3-7 Amendment No. 116