ML17158A522
| ML17158A522 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 10/20/1994 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Pennsylvania Power & Light Co, Allegheny Electric Cooperative |
| Shared Package | |
| ML17158A523 | List: |
| References | |
| NPF-14-A-135, NPF-22-A-105 NUDOCS 9411020068 | |
| Download: ML17158A522 (10) | |
Text
~
gp8 REgy
~o
~c YQ
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-OM1 PENNSYLVANIA POWER at LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.
DOCKET NO. 50-387 SUS UEHANNA STEAM ELECTRIC STATION UNIT 1
AM NDMENT TO FACILITY OPERATING LICENS Amendment No.
135 License No. NPF-14 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for the amendment filed by the Pennsylvania Power Light Company, dated May 31,
- 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
94ii020068 94i020 PDR ADOCK 05000387 P
..PDR
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:
(2)
Technical S ecifications and nvironmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 135 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PP8,L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and is to be implemented within 30 days after its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 20, 1994 rf F. Stolz, Direc or 4 oject Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AMENDMENT NO. >3>
FACILITY OPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following page of the Appendix A Technical Specifications with enclosed page.
The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
~REHOV 3/4 7-4 INSERT 3/4 7-4
PLANT SYSTEMS ULTIMATEHEAT SINK LIMITINGCONDITION FOR OPERATION 3.7.1.3 The spray pond shall be OPERABLE.
APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2, 3, 4, 5, and ACTION:
a.
With the groundwater level at any spray pond area observation well greater than or equal to 663'ean Sea Level (MSL), prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 withinthe next 10 days outlining the cause of the high groundwater level and the plans for restoring the level to within the limit.
b.
With the spray pond otherwise inoperable:
1.
In OPERATIONAL CONDITION 1, 2 or 3, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
In OPERATIONAL CONDITION 4 or 5, declare the RHRSW system and the emergency service water system inoperable and take the ACTION required by Specifications 3.7.1.1 and 3.7.1.2.
3.
In Operational Condition, declare the emergency service water system inoperable and take the ACTION required by Specification 3.7.1.2.
The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCEREQUIREMENTS 4.7.1.3 The spray pond shall be determined OPERABLE by verifying:
a.
The average water temperature, which shall be the arithmetical average of the spray pond water temperature at the surface, mid and bottom levels, to be less than or equal to 884F at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
The water level at the overflow weir is greater than or equal to 678'1" MSL USGS, at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c.
The groundwater level at observation wells 1, 3, 4, 5, 6, and 1113 to be less than 663'SL at least once per 6 months.
I When handling irradiated fuel in the secondary containment.
SUSQUEHANNA - UNIT 1 3/4 7%
Amendment No. 02~ ~
gp,R AEQUI (4
~o
~O
+w*w+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PENNSYLVANIA POWER
& LIGHT COMPANY LLEGH NY EL CTRIC COOPERATIVE INC.
DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. >O~
License No.
NPF-22 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for the'amendment filed by the Pennsylvania Power h
Light Company, dated May 31,
- 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of4the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissi'on's regulations set forth-in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.
NPF-22 is hereby amended to read as follows:
(2) Technical S ecifications and nvironmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
>O>
and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and is to be implemented within 30 days after its date of issuance.
FOR THE NUCLEAR REG LATORY COMMISSION J
. Stolz, Directo Pr ject Directorate
-2 ivision of Reactor Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
ATTACHMENT TO LICENSE AMENDMENT NQ. 105 FACILITY OPERATING LICENSE NO.
NPF-22 DOCKET NO. 50-388 Replace the following page of the Appendix A Technical Specifications with enclosed page.
The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
REMOVE 3/4 7-4 INSERT 3/4 7-4
PLANT SYSTEMS ULTIMATEHEAT SINK LIIVIITINGCONDITION FOR OPERATION 3.7.1.3 The spray pond shall be OPERABLE.
APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2, 3, 4, 5, and ACTION:
a.
With the groundwater level at any spray pond area observation well greater than or equal to 663'ean Sea Level (MSL), prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 withinthe next 10 days outlining the cause of the high groundwater level and the plans for restoring the level to within the limit.
b.
With the spray pond otherwise inoperable:
1.
In OPERATIONAL CONDITION 1, 2, or 3, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, 2.
In OPERATIONAL CONDITION 4 or 5, declare the RHRSW system and the emergency service water system inoperable and take the ACTION required by Specifications 3.7.1.1 and 3.7.1.2.
+
3.
In Operational Condition, declare the emergency service water system inoperable and take the ACTION required by Specification 3.7.1.2.
The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCEREQUIREMENTS 4.7.1.3 The spray pond shall be determined OPERABLE by verifying:
a.
The average water temperature, which shall be the arithmetical average of the spray pond water temperature at the surface, mid and bottom levels, to be less than or equal to 88'F at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; b.
The water level is greater than or equal to 678'1" MSL USGS, at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c.
The groundwater level at observation wells 1, 3, 4, 5, 6, and 1113 to be less than 663'SL at least once per 6 months.
I When handling irradiated fuel in the secondary containment.
SUSQUEHANNA - UNIT 2 3/4 7%
Amendment No. 9.r