Forwards Requalification Exam Repts 50-387/94-01OL & 50-388/94-01OL on 940131-0204
ML17158A210
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/01/1994
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A211 List:
References
RTR-NUREG-1021 NUDOCS 9404130013
Download: ML17158A210 (3)


See also: IR 05000387/1994001

Text

APR

I

!998

Docket Nos. 50-387

50-388

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power Ec Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Byram:

SUBJECT:

REQUALIFICATIONEXAMINATIONSAND REQUALIFICATION

PROGRAM EVALUATIONREPORT NOS. 50-387/94-01 AND

50-388/94-01 (OL)

During the week of January

31 to February 4, 1994, the NRC staff conducted licensed

operator requalification examinations and completed a program evaluation at the Susquehanna

Steam Electric Station.

The requalification examinations and program evaluation were

conducted using Revision 7 of NUREG-1021, "Operator Licensing Examiner Standards

[ES]." The licensed operator requalification training (LORT) program is important to

nuclear safety because it helps to assure a high level of operator proficiency in dealing with

normal and emergency

events.

On February 4, 1994, the preliminary findings related to the preparation and administration

of the examinations were discussed with those members of your staff identified in the

enclosed report.

Overall, operator performance on all portions of the examination was strong.

Eleven of the

twelve licensed operators passed all portions of the requalification examination and all three

crews passed

the simulator portion.

One licensed operator failed the simulator portion of the

examination.

The results of the program evaluation were satisfactory in accordance with ES-

601 criteria.

The written examination, dynamic simulator scenarios,

and job performance

measures

that were proposed for the examination required only minor revisions.

94041 3001 3. 940401

PDR

ADOCK 05000387

V

PDR

OFFICIALRECORD COPY

G:SS940101.RER

Mr. Robert G. Byram

Section 4 of the enclosed report addressed

a potential problem in the proper implementation

of the secondary containment control emergency operating procedures

(SC-EOP) dealing with

actions associated

with exceeding "maximum normal radiation levels" (MNRLs). With the

use of a single high value of 500 mR/hr of MNRL for all areas of secondary containment,

we are concerned that there may be an excessive delay in implementing EOP strategies or

implementing EOP strategies with procedures

that may not be under the same level of control

as the EOPs.

We request that you respond within 30 days of receipt of this letter to this concern and

provide your basis for the MNRL value used and for use of this one value throughout

secondary containment.

Also, as a result of these concerns, Mr. M. Peale of your staff

verbally committed that PP&L willnot implement the change in the EOPs MNRL to a higher

value until additional information on your evaluation was received and reviewed by NRC

staff. Ifour understanding

is incorrect, please inform us in writing.

The response

requested

by this letter is not subject to the clearance procedures of the Office

of Management and Budget, as required by the Paperwork Reduction Act of 1980, Pub. L.

No. 96.511.

In accordance with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter and

the enclosures willbe placed in the NRC Public Document Room.

Should you have any

questions,

please contact Mr. Richard J. Conte at (610) 337-5210.

Sincerely,

gj )g~

., '+g'agcy/Q.

James T. Wiggins, Deputy Director

Division of Reactor Safety

Enclosure:

Examination Report Nos. 50-387/388-94-01

OFFICIALRECORD COPY

G:SS940101.RER

Mr. Robert G. Byram

cc w/encl:

H. G. Stanley, Vice President - Nuclear Operations

J. M. Kenny, Nuclear Licensing

G. T. Jones, Vice President - Nuclear Engineering

M. M. Urioste, Nuclear Services Manager

D. F. McGann, Supervisor, Nuclear Compliance

H. D. Woodeshick, Special Office of the President

A. Fitch, Operations Training Supervisor

W. Lowthert, Manager of Nuclear Training

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket Room (with concurrences)

K. Gallagher, DRP

OL Facility File

bcc w/encl: (Via E-Mail)

V. McCree, OEDO

R. Clark, Project Manager, NRR

C. Miller, PDI-2, NRR

M. Shannon, ILPB

R. Conte, DRS

H. Williams, DRS

C. Sisco, DRS

RI:DRS

RI:DRS

RI:DRS

RI:DRS

Sisco/dmg

OP/X/94

z WP<y

Will'

0394/94

~

Co

e

Wiggins

03iPg94

/ /94

OFFICIALRECORD COPY

G:SS940101.RER