Forwards Insp Rept 50-387/93-21 & 50-388/93-21 on 931108-12 & Notice of Violation
ML17158A076
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/29/1993
From: Joyner J
Office of Nuclear Reactor Regulation
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A077 List:
References
NUDOCS 9401110110
Download: ML17158A076 (7)


See also: IR 05000387/1993021

Text

FORD 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET ¹

05000387

05000388

CESSION

NBR

C IL: 50-387

50-388

AUTH. NAME

JQYNERi J. H.

REC IP. NAME

9'401 1 101 10

DOC. DATE'P3/12/29

NOTARIZED:

NO

Susquehanna

Steam Electric 'Station

~ Unit iI Pennsglva

Susquehanna

Steam Electric Stationi

Unit 2I Pennsglva

AUTHOR AFFILIATION

Safeguards

Branch

RECIPIENT AFFILIATIQN

Pennsylvania

Porrrer

S. Light Co.

BYRAMe R. G.

R

SUBJECT:

Foreards

insp rep t 50-387/93-21

5. 50-388/93-21

on 931108-12

5, notice" of violation.

I

DISTRIBUTION CODE:

IE06D

COPIES

RECEIVED: LTRi ENCL

I

SIZE:

TITLE: Environ 4 Radiological

(50 DKT)-Insp Rept/Notice of Violation Respons

NOTES:

RECIPIENT

ID CODE/NAME

PD1-2 LA

CLARKE R

COPIES

LTTR ENCL

1

0

1

REC IP IENT

ID CODE/NAME

PD1-2

PD

COPIES

LTTR ENCL

1

1

SI

F

0

INTERNAL:

ACRS

AEOD/TTC

NRR/DREP/PRPB10

NRR/PMAS/ILRB12

OE DIR

02

RGN1

DRSS/RPB

RGN4/FIPS

EXTERNAL:

EGkG SIMPSONI F

NSIC

1

2

1

1

1

1

1

2

1

2

1

1

1

1

1

AEOD/DSP

NMSS/SGTB

4E4

NRR/DR IL/RPEB10

NUDOCS-ABSTRACT

OGC/HDS2

RES

RGN1

FILE

01

NRC

PDR

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D'

NOTE TO AL'IDS RECIPIEN"'S:

PLEASE HE'

US

0 REDUCE V'AS E! COYTACT

HE DOCUMENT CO? TROL DESY.

OOh! P

5/ (E>;T. 594. iQ(T5) TO ELIhI!NIA'

YOUR 'BLAME FROhk DISTRIEIJTI(

LlSTS FOR DOCUhIEqTS YOU DON T qEED!

TOTAL NUMBER OF

COP IES REQUIRED:

LTTR

24

ENCL

23

Docket Nos.

50-387

50-388

License Nos. NPF-14

NPF-22

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power &Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Byram:

SUEECT:

Combined Inspection Nos. 50-387/93-21 and 50-388/93-21

An announced safety inspection of the radiological controls program at your facilityduring

outage conditions was conducted by Messrs. J. Noggle and R. Ragland on November 8-12,

1993 of activities authorized by NRC License Nos. NPF-14 and NPF-22. At the conclusion

of the inspection on November 12, 1993, our findings were discussed by Messrs. Noggle and

Ragland with Mr. Stanley and other members of your staff.

Areas reviewed during the inspection are important to health and safety and are discussed in

the enclosed inspection report.

These areas included review of: audits and assessments,

outage organization and contractor training, and review of outage maintenance work HP

coverage and associated

satellite health physics (HP) control point activities.

Your radiological controls program has shown programmatic improvement in the HP

operations area.

In particular, the new radiation work permit format, adopted in September

1993, was greatly improved and in its implementation contained a good level of radiological

controls.

Also, your HP operations staff has conducted a benchmarking effort at several

other nuclear power plants and anticipates mahng further program changes in a

commendable effort to further upgrade the HP operations program.

Personnel exposures

and

other radiological hazard indicators were low. Some potential program enhancements

are

described in the enclosed report for your consideration.

One violation of Technical Specification (TS) requirements pertaining to the barricading and

posting of a high radiation area was identified.

You.are required to respond to the enclosed

Notice of Violation in accordance with the instructions contained therein.

In addition, one

noncited vilation of TS requirements also was identified. The latter violation pertained to

barricading of a high radiation area.

Your staff is commended for its actions in identifying

and correcting that violation.

940iiiOiiO 93i229

PDR

ADOCK 05000387

6

PDR

Qf FiClALRECoR~ CF'~

~op

4

Pennsylvania Power & Light Company

, 2

Your cooperation with us is appreciated.

Sincerely,

Origirel SignoYBjff

Jam~" 'vneX

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosures:

1.

NRC Combined Inspection Report Nos. 50-387/93-21 and 50-388/93-21

2.

Appendix A, Notice of Violation

cc w/encl:

H. G. Stanley, Vice President - Nuclear Operations

J. M. Kenny, Nuclear Licensing

G. T. Jones, Vice President - Nuclear Engineering

M. M. Urioste, Nuclear Services Manager

D. F. McGann, Supervisor, Nuclear Compliance

H. D. Woodeshick, Special Office of the President

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

OFFlGNL RECORD COPY

Pennsylvania Power &Light Company

98,'PQ

1ÃA

bcc w/encl:

Region I Docket Room (with concurrences)

bcc w/encl: (Via E-Mail)

W. Dean, OEDO

R. Clark, Project Manager, NRR

L. Nicholson, Acting PDI-2, NRR

RI:DRSS

oggle

12/8/93

RI:DRSS

g,C.

Ragland

12/l)/93

RI:DRSS

Bores

12/zi/93

DRSS

Joyner

12&/93

OFFICIALRECORD COPY