| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/29/1993 |
| From: | Joyner J Office of Nuclear Reactor Regulation |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17158A077 | List: |
| References | |
| NUDOCS 9401110110 | |
| Download: ML17158A076 (7) | |
See also: IR 05000387/1993021
Text
FORD 1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET ¹
05000387
05000388
CESSION
NBR
C IL: 50-387
50-388
AUTH. NAME
JQYNERi J. H.
REC IP. NAME
9'401 1 101 10
DOC. DATE'P3/12/29
NOTARIZED:
NO
Susquehanna
Steam Electric 'Station
~ Unit iI Pennsglva
Susquehanna
Steam Electric Stationi
Unit 2I Pennsglva
AUTHOR AFFILIATION
Safeguards
Branch
RECIPIENT AFFILIATIQN
Porrrer
S. Light Co.
BYRAMe R. G.
R
SUBJECT:
Foreards
insp rep t 50-387/93-21
5. 50-388/93-21
on 931108-12
5, notice" of violation.
I
DISTRIBUTION CODE:
IE06D
COPIES
RECEIVED: LTRi ENCL
I
SIZE:
TITLE: Environ 4 Radiological
(50 DKT)-Insp Rept/Notice of Violation Respons
NOTES:
RECIPIENT
ID CODE/NAME
PD1-2 LA
CLARKE R
COPIES
LTTR ENCL
1
0
1
REC IP IENT
ID CODE/NAME
PD1-2
COPIES
LTTR ENCL
1
1
F
0
INTERNAL:
AEOD/TTC
NRR/DREP/PRPB10
NRR/PMAS/ILRB12
OE DIR
02
RGN1
DRSS/RPB
RGN4/FIPS
EXTERNAL:
EGkG SIMPSONI F
1
2
1
1
1
1
1
2
1
2
1
1
1
1
1
AEOD/DSP
NMSS/SGTB
4E4
NRR/DR IL/RPEB10
NUDOCS-ABSTRACT
OGC/HDS2
RGN1
FILE
01
NRC
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D'
PLEASE HE'
US
0 REDUCE V'AS E! COYTACT
HE DOCUMENT CO? TROL DESY.
OOh! P
5/ (E>;T. 594. iQ(T5) TO ELIhI!NIA'
YOUR 'BLAME FROhk DISTRIEIJTI(
LlSTS FOR DOCUhIEqTS YOU DON T qEED!
TOTAL NUMBER OF
COP IES REQUIRED:
LTTR
24
ENCL
23
Docket Nos.
50-387
50-388
License Nos. NPF-14
NPF-22
Mr. Robert G. Byram
Senior Vice President - Nuclear
Pennsylvania Power &Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Byram:
SUEECT:
Combined Inspection Nos. 50-387/93-21 and 50-388/93-21
An announced safety inspection of the radiological controls program at your facilityduring
outage conditions was conducted by Messrs. J. Noggle and R. Ragland on November 8-12,
1993 of activities authorized by NRC License Nos. NPF-14 and NPF-22. At the conclusion
of the inspection on November 12, 1993, our findings were discussed by Messrs. Noggle and
Ragland with Mr. Stanley and other members of your staff.
Areas reviewed during the inspection are important to health and safety and are discussed in
the enclosed inspection report.
These areas included review of: audits and assessments,
outage organization and contractor training, and review of outage maintenance work HP
coverage and associated
satellite health physics (HP) control point activities.
Your radiological controls program has shown programmatic improvement in the HP
operations area.
In particular, the new radiation work permit format, adopted in September
1993, was greatly improved and in its implementation contained a good level of radiological
controls.
Also, your HP operations staff has conducted a benchmarking effort at several
other nuclear power plants and anticipates mahng further program changes in a
commendable effort to further upgrade the HP operations program.
Personnel exposures
and
other radiological hazard indicators were low. Some potential program enhancements
are
described in the enclosed report for your consideration.
One violation of Technical Specification (TS) requirements pertaining to the barricading and
posting of a high radiation area was identified.
You.are required to respond to the enclosed
Notice of Violation in accordance with the instructions contained therein.
In addition, one
noncited vilation of TS requirements also was identified. The latter violation pertained to
barricading of a high radiation area.
Your staff is commended for its actions in identifying
and correcting that violation.
940iiiOiiO 93i229
ADOCK 05000387
6
Qf FiClALRECoR~ CF'~
~op
4
Pennsylvania Power & Light Company
, 2
Your cooperation with us is appreciated.
Sincerely,
Origirel SignoYBjff
Jam~" 'vneX
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosures:
1.
NRC Combined Inspection Report Nos. 50-387/93-21 and 50-388/93-21
2.
Appendix A, Notice of Violation
cc w/encl:
H. G. Stanley, Vice President - Nuclear Operations
J. M. Kenny, Nuclear Licensing
G. T. Jones, Vice President - Nuclear Engineering
M. M. Urioste, Nuclear Services Manager
D. F. McGann, Supervisor, Nuclear Compliance
H. D. Woodeshick, Special Office of the President
J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
OFFlGNL RECORD COPY
Pennsylvania Power &Light Company
98,'PQ
1ÃA
bcc w/encl:
Region I Docket Room (with concurrences)
bcc w/encl: (Via E-Mail)
W. Dean, OEDO
R. Clark, Project Manager, NRR
L. Nicholson, Acting PDI-2, NRR
RI:DRSS
oggle
12/8/93
RI:DRSS
g,C.
Ragland
12/l)/93
RI:DRSS
12/zi/93
- DRSS
Joyner
12&/93