Forwards Insp Repts 50-387/93-18 & 50-388/93-18 on 930927- 1001.NRC Has Continuing Concern That Corrective Actions Have Not Been Fully Effective to Maintain Control of Valve Positions
ML17157C534
Person / Time
Site: Susquehanna  
Issue date: 10/22/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157C535 List:
References
NUDOCS 9311010087
Download: ML17157C534 (4)


See also: IR 05000387/1993018

Text

OCT Z >-1993

Docket Nos.

50-387

50-388

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power & Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Bryam:

SUBJECT:

INSPECTION REPORT NOS. 50-387/93-18; 50-388/93-18

This letter refers to the safety inspection led by Mr. C. Sisco of this office and

Mr. D. Mannai of the Resident Inspector's office, from September 27-October

1, 1993, at

the Susquehanna

Steam Electric Station, of activities authorized by NRC Licenses Nos. NPF-

14 & 22 and to the discussions of our findings with members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report, which is enclosed with this letter.

Within these areas,

the inspection

consisted of selective review of representative

records, interviews with personnel,

and

observations by the inspectors.

We have a continuing concern that your corrective actions have not been fully effective to

maintain control of valve positions.

In addition, your root cause analysis of mispositioned

valves may not have fully addressed

human performance during your analyses of the events.

The enclosed report contains the details of our continuing concern.

We request that you respond, in writing, within 60 days of your plans to effect corrective

actions to assure correct valve positions based on sound root cause analysis and conclusions.

93iiOi0087 93i022

PDR

ADOCK 05000387

G

PDR

OFFICIALRECORD COPY

G:SU931818.INS

OCT 8g

1993

J

Mr. Robert G. 'Byram

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,'l a copy of this letter and

its enclosure will be placed in the NRC Public Document Room.

Sincerely,

Lee H. Bettenhausen,

Chief

Operations Branch

Division of Reactor Safety

Enclosure:

NRC Region I Inspection Report Nos.

50-387/93-18; 50-388/93-18

I

cc w/encl:

H. G. Stanley, Vice President - Nuclear Operations

J. M. Kenny, Nuclear Licensing

G. T. Jones, Vice President - Nuclear Engineering

'.

M. Urioste, Nuclear Services Manager

D. F. McGann, Supervisor, Nuclear Compliance

H. D. Woodeshick, Special Office of the President

J. C. Tilton, Ill, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket Room (with concurrences)

bcc w/encl: (Via E-Mail)

V. McCree, OEDO

R. Clark, Project Manager, NRR

M. Boyle, Acting PDI-2, NRR

OFFICIALRECORD COPY

G:SU931818.INS

OCT 22 i993

Mr. Robert G. Byram

{VIAE-MAILAND NO ATTACHMENTS):

L. Bettenhausen,

DRS

R. Conte, DRS

C. Sisco, DRS

RI:DRS

Sisco/dmg

0/1 /93

RI:DRS

Bettenhausen

10/93

':SU931818.INS

RI'DRS

Conte

10j/

93

OFFICIALRECORD COPY