OCT Z >-1993
Docket Nos.
50-387
50-388
Mr. Robert G. Byram
Senior Vice President - Nuclear
Pennsylvania Power & Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Bryam:
SUBJECT:
INSPECTION REPORT NOS. 50-387/93-18; 50-388/93-18
This letter refers to the safety inspection led by Mr. C. Sisco of this office and
Mr. D. Mannai of the Resident Inspector's office, from September 27-October
1, 1993, at
the Susquehanna
Steam Electric Station, of activities authorized by NRC Licenses Nos. NPF-
14 & 22 and to the discussions of our findings with members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report, which is enclosed with this letter.
Within these areas,
the inspection
consisted of selective review of representative
records, interviews with personnel,
and
observations by the inspectors.
We have a continuing concern that your corrective actions have not been fully effective to
maintain control of valve positions.
In addition, your root cause analysis of mispositioned
valves may not have fully addressed
human performance during your analyses of the events.
The enclosed report contains the details of our continuing concern.
We request that you respond, in writing, within 60 days of your plans to effect corrective
actions to assure correct valve positions based on sound root cause analysis and conclusions.
93iiOi0087 93i022
ADOCK 05000387
G
OFFICIALRECORD COPY
G:SU931818.INS
OCT 8g
1993
J
Mr. Robert G. 'Byram
2
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,'l a copy of this letter and
its enclosure will be placed in the NRC Public Document Room.
Sincerely,
Lee H. Bettenhausen,
Chief
Operations Branch
Division of Reactor Safety
Enclosure:
NRC Region I Inspection Report Nos.
50-387/93-18; 50-388/93-18
I
cc w/encl:
H. G. Stanley, Vice President - Nuclear Operations
J. M. Kenny, Nuclear Licensing
G. T. Jones, Vice President - Nuclear Engineering
'.
M. Urioste, Nuclear Services Manager
D. F. McGann, Supervisor, Nuclear Compliance
H. D. Woodeshick, Special Office of the President
J. C. Tilton, Ill, Allegheny Electric Cooperative, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/encl:
Region I Docket Room (with concurrences)
bcc w/encl: (Via E-Mail)
V. McCree, OEDO
R. Clark, Project Manager, NRR
M. Boyle, Acting PDI-2, NRR
OFFICIALRECORD COPY
G:SU931818.INS
OCT 22 i993
Mr. Robert G. Byram
{VIAE-MAILAND NO ATTACHMENTS):
L. Bettenhausen,
R. Conte, DRS
C. Sisco, DRS
RI:DRS
Sisco/dmg
0/1 /93
RI:DRS
Bettenhausen
10/93
':SU931818.INS
RI'DRS
Conte
10j/
93
OFFICIALRECORD COPY