Forwards Insp Repts 50-387/93-07 & 50-388/93-07 on 930330-0510 & Notice of Violations
ML17157C352
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/27/1993
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157C353 List:
References
NUDOCS 9306080049
Download: ML17157C352 (5)


See also: IR 05000387/1993007

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

w1

j

~ACCESSION NBR:9306080049

DOC.DATE: 93/05/27

NOTARIZED: NO

DOCKET ¹

SCIL:50-387

Susquehanna

Steam Electric Station, Unit 1, Pennsylva

05000387

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

AUTH.NAME

AUTHOR AFFILIATION

WENZINGER,E.C.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power

& Light Co.

SUBJECT:

Forwards

insp repts

50-387/93-07

& 50-388/93-07

on

930330-0510

& notice of violations.

DISTRIBUTION CODE:

IEOlD

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

EG FILE

02

RG

ILE

Ol

EXTERNAL'G&G/BRYCEgJ

~ H ~

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLARK,R

AEOD/DEIB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS2

RES MORISSEAU,D

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

YOTE TO ALL "RIDS RECIPIEYTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMEYT COYTROL DESK.

ROOM Pl 37 (EXT. 504 2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL

23

Docket Nos.

50-387

50-388

Mr. R. G. Byram

Senior Vice President - Nuclear

Pennsylvania Power k, Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Dear Mr. Byram:

Subject:

NOTICE OF VIOLATIONAND NRC REGION I COMBINED

INSPECTION 50-387/93-07; 50-388/93-07

The enclosed report documents a resident safety inspection conducted by Messrs.

G. S.

Barber and D. J. Mannai, and others from March 30, 1993 through May 10, 1993, at the

Susquehanna

Steam Electric Station (SSES), Salem Township, Pennsylvania.

The inspection

covered plant operations,

surveillance,

and maintenance for both units.

At the conclusion of

the inspection, Mr. G. S. Barber, Senior Resident Inspector, summarized

the inspection

findings with Mr. H. G. Stanley and other members of your staff.

Areas examined during the inspection are important to public health and safety and are

identified in the report.

Within these areas,

the inspection consisted of selective

examinations of procedures

and representative

records, interviews with personnel,

and

observation of activities in progress.

The purpose of the inspection was to determine

whether NRC licensed activities were being conducted safely and in accordance with

regulatory requirements.

P

Based on the results of this inspection, certain activities appeared

to be in violation of NRC

requirements,

as specified in the enclosed Notice of Violation (Notice).

The inspector

discovered that a high pressure coolant injection system containment boundary valve was

closed, but not locked, as required by the system checklist.

This valve could allow

communication of primary and secondary containments.

Strict administrative controls

governing valve positioning were not adhered to in this case.

We also noted potential

violations relative to (1) the previous selection of overvoltage setpoint established for the

reactor protection system in the 1982-1988 period, and (2) a matter involving missed rounds

by assigned firewatch personnel in 1990.

However, we intend to execise enforcement

discretion in these matters, and not cite these instances

since you met the criteria specified in

Section VII.Bof our enforcement policy.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response.

In your response,

you should document the

specific actions taken and any additional actions you plan to prevent recurrence.

After

9306080049

930527

PDR

ADOCK 05000387

6

PDR

i/iN 2 r 693

2

reviewing your response

to this Notice, including your proposed corrective actions and the

results of future inspections,

the NRC will determine whether further NRC enforcement

action is necessary

to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

The responses

directed by

this letter and the enclosed Notice are not subject to the clearance procedures of the Office of

Man'agement and Budget as required by the Paperwork Reduction Act of 1980, Public Law

No. 96.511.

Your cooperation with us in this matter is appreciated.

Sincerely,

C.".l".IK~'~L SlC)l":0 Bi'.

EP,VA"'0 G. V/Ei'~it!Gt.R

Edward C. Wenzinger, Chief,

Reactor Projects Branch 2

Enclosure:

~

1.

Notice of Violation

2.

Combined NRC Inspection Report 50-387/93-07; 50-388/93-07

cc w/encl:

H. G. Stanley, Superintendent of Plant - SSES

J. M. Kenny, Supervisor, Nuclear Licensing

D. F. McGann, Supervisor, Nuclear Compliance

H. D. Woodeshick, Special Office of the President

J. C. Tilton III, Allegheny Electric Cooperative, Inc.

M. M. Urioste, Nuclear Services Manager, General Electric Company

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2) Inspection Reports

NRC Resident Inspector

Commonwealth of Pennsylvania

y,py 27 f993.

0>>

bcc w/encl:

Region I Docket Room (with concurrences)

bcc w/encl via E-Mail:

V. M'Cree, OEDO

R. Clark, NRR Project Manager

M. Boyle, Acting PDI-2, NRR (Section 4.4.1)

R. Fuhrmeister, ORA, Section 4.4.1 (RI-89-A-0119)

D. Haverkamp, Section 8.2.1

F. Akstulewicz, NRR/PDLR, Section 8.2.1

G.

B

ber

hite

)~

enzinger

5/1 /93

05

/93

05I>'f83

OFFICIALRECORD COPY