Docket Nos.
50-387; 50-388
Mr. Harold W. Keiser
Senior Vice President - Nuclear
Pennsylvania Power &Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
SUBJECT:
EMERGENCY PREPAMZ)NESS INSPECTION 50-387/93-03; 50-388/93-03
Enclosed
is the report of the February 23-25,
1993 inspection,
led by Mr. C. Gordon, of
Susquehanna
Steam Electric Station Emergency Preparedness
(EP) and of the full-participation,
annual EP exercise.
Our inspection findings were based on inspector observations,
discussions
with your staff, and document review.
At the end of the inspection, the preliminary NRC
findings were discussed with members of your staff.
Overall, implementation of the Emergency
Plan during the exercise
showed
that adequate
protective measures
can be taken on-site in an emergency.
Except for the exercise play and
termination considerations identified by the Commonwealth of Pennsylvania after the exercise,
the development and content ofthe exercise scenario was an exercise strength.
Lack ofthorough
implementation of the Technical Support Center radiological assessment
function relative to an
unmonitored release pathway was an exercise weakness.
Areas for improvement were identified
as described in the enclosed inspection report.
'o reply to this letter is required.
Thank you for your cooperation.-
Sincerely,
Original Sgned By:
James H, Joyner
22OOG>
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards
Branch
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Region I Report 50-387/93-03; 50-388/93-03
9304220205
9304i5
ADOCK 05000387
Q
- OFF1CNL RECORD COPY
Pennsylvania Power and Light Company
cc w/encl:
J. M. Kenny, Nuclear Licensing
H. G. Stanley, Superintendent of Plant-SSES
Vice President,
Nuclear Operations
M. M. Urioste, Nuclear Services Manager
R, M. Peal, Supervisor, Nuclear Compliance
H. D. Woodeshick, Special Office of the President
J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
COPY
OFFiCiAl RECORD CO
Power and Light Company
bcc w/encl;
Region I Docket Room (with concurrences)
E. Wenzinger, DRP
J. White, DRP
DRS/EB SALP Coordinator
J. Noggle, DRSS.
J. Trapp, DRS
R. Bores, DRSS
M. Sjoberg, SKI
V. McCree, OEDO
R. Clark, NRR, Project Manager
CONCURRENCES:
(~
Gordon
4/g/93
McCabe
4/r3/93
4/p/93
OFFICIALRECORD COPY