Docket Nos.
50-387
.and 50-388 October 27, 2
LICENSEE:
Pennsylvania Power and Light Company FACILITY:
Susquehanna Steam Electric Station, Units 1 and 2
SUBJECT:
SUMMARY
OF QUARTERLY MEETING WITH PENNSYLVANIA POWER AND LIGHT COMPANY (PP&L)
A meeting was held on October 7, 1992, at the PP&L corporate office in Allentown, Pennsylvania, between members of the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the licensee.
The purpose of this meeting was to discuss the status of current licensing issues and to give the licensee an opportunity to present issues that will potentially be submitted in the future.
A list of attendees is enclosed.
Discussions were made on all open licensing actions for Susquehanna Steam Electric Station (SSES) with emphasis on what actions are necessary, on the part of the licensee and/or the NRC staff, to bring the various licensing issues to closure.
The more significant items discussed include the pending resolutions to Erosion/Corrosion investigations being performed during the current Unit 2 refueling outage, Water Level Instrumentation, Thermo-Lag and Kaowool, proposed differences to the Boiling Water Reactor Owner's Group Emergency Procedure Guidelines, two potential Part 2ls, GL 88-01 Intergranular Stress Corrosion Cracking issues, and PP&L's Individual Plant Examination (IPE) submittal.
Significant discussion surrounded the topic of the IPE.
The staff discussed apparent problems that were encountered during the review of the licensee's IPE submittal.
A meeting was proposed between the appropriate management level of the NRC and PP&L to discuss potential resolutions to the staff's concerns.
Enclosure:
Meeting Attendees The licensee's involvement in the Power Uprate program, efforts in progress for Design Basis Documentation reconstitution, a proposed White Paper pertaining to Appendix R of Part 50, and the licensee's plans to hold a Senior Management Meeting in the December-January time-frame were also discussed.
Richard J. Clark, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I-II Office of Nuclear Reactor Regulation original signed by'ichard J. Clark cc w/enclosure:
See next page'ISTRIBUTION
'yDocket File I
NRC
& Loca'1 PDRs PDI-2 Reading THurley/FMiragl i a JPartlow 9211030113 9210Z7 PDR ADDCK 05000387 PDR SVarga OGC JCalvo EJordan CHiller
- SBarber, RGN-I RClark DMannai HO'Brien ACRS 10
[j'I':j~ ~l,, ij~g
'g ';g QQII g
- VHcCree, EDO EWenzinger, RGN-I
- JWhite, RGN-I OFFICE PDI-2 PDI-2 D
CHil14
/OP f/92 RCl P5 NAME O'B en DATE
/
92
/0 /Q7/92 OFFICIAL RECORD COPY DOCUMENT NAME:
SU10-7MT.SUH
C o ~
I ft
'h
~,
- i. i ":l:)fjj' k
l k
~8 RECy (4
P0 O
Ich Cy
+~
~0
+***+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 27, 1992 Docket Nos.
50-387 and 50-388 LICENSEE:
Pennsylvania Power and Light Company FACILITY:
Susquehanna Steam Electric Station, Units 1 and 2
SUBJECT:
SUMMARY
OF QUARTERLY MEETING WITH PENNSYLVANIA POWER AND LIGHT COMPANY (PP&L)
A meeting was held on October 7, 1992, at the PP&L corporate office in Allentown, Pennsylvania, between members of the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the licensee.
The purpose of this meeting was to discuss the status of current licensing issues and to give the licensee an opportunity to present issues that will potentially be submitted in the future.
A list of attendees is enclosed.
Discussions were made on all open licensing actions for Susquehanna Steam Electric Station (SSES) with emphasis on what actions are necessary, on the part of the licensee and/or the NRC staff, to bring the various licensing issues to closure.
The more significant items discussed include the pending resolutions to Erosion/Corrosion investigations being performed during the current Unit 2 refueling outage, Water Level Instrumentation, Thermo-Lag and Kaowool, proposed differences to the Boiling Water Reactor Owner's Group Emergency Procedure Guidelines, two potential Part 21s, GL 88-01 Intergranular Stress Corrosion Cracking issues, and PP&L's Individual Plant Examination (IPE) submittal.
Significant discussion surrounded the topic of the IPE.
The staff discussed apparent problems that were encountered during the review of the licensee's IPE submittal.
A meeting was proposed between the appropriate management level of the NRC and PP8L to discuss potential resolutions to the staff's concerns.
The licensee's involvement in the Power Uprate program, efforts in progress for Design Basis Documentation reconstitution, a proposed White Paper pertaining to Appendix R of Part 50, and the licensee's plans to hold a Senior Management Meeting in the December-January time-frame were also discussed.
Enclosure:
Meeting Attendees cc w/enclosure:
See next page Ri rd rk, Senior Project Manager Propre Dire torate I-2 Division of Reactor Projects - I-II Office of Nuclear Reactor Regulation
Mr. Harold W.
Keiser Pennsylvania Power
& Light Company Susquehanna Steam Electric Station, Units 1
& 2 CC:
Jay Silberg, Esq.
- Shaw, Pittman, Potts
& Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.
M. Kenny Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Scott Barber Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P.
O.
Box 2063 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III
'llegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Superintendent of Plant Susquehanna Steam Electric Station Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1,
Box 1797 Berwick, Pennsylvania 18603 Mr. Robert G.
Byram Vice President-Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
ENCLOSURE
SUMMARY
OF UART R
M E
ING W T PPR OCTOB 99 MEETING ATTENDEES NAME Charles L. Hiller James J.
Raleigh G. Scott Barber David J.
Hannai George Jones James Kenny Rocky Sgarro Neil Coddington Rick Wehry Glenn Hiller ORGANIZATION NRC NRC NRC NRC PPKL PPKL PPKL PPRL PPLL PPKL