Requests Addl Info on Proposed Power Uprate to Provide Clarification of Some Apparent Contradictions & Differences Between Info in Submittal in Ref Matl
ML17157B961
Person / Time
Site: Susquehanna  
Issue date: 08/17/1992
From: Raleigh J
Office of Nuclear Reactor Regulation
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
References
TAC-M83426, TAC-M83427, NUDOCS 9208240352
Download: ML17157B961 (5)


Text

'%

August 17, 1992 Docket Nos.

50-387 and 50-388 Hr. Harold W. Keiser Senior Vice President Nuclear Philadelphia Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Nr. Keiser:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON PROPOSED POWER UPRATE, SUS(UEHANNA STEAN ELECTRIC STATION, UNITS 1

AND 2 (TAC NOS.

H83426 AND M83427)

The staff has reviewed the instrumentation and control (IKC) portion of the proposed power uprate submittal that was made by Pennsylvania Power and Light Company (PP8L or the licensee) in a letter, serial PLA-3816, dated July 24, 1992.

Based on this review, we have concluded that further information is required to provide clarification of some apparent contradictions and differences between information contained in the licensee's submittal and referenced material.

J As a result of this review, the staff has developed questions which form the basis of this request for additional information.

These questions are provided in the enclosure.

If you have any questions, please contact me on (301) 504-1447.

This requirement affects fewer than 10 respondents and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.

i Sincerely,

/s/

cyg08240352 920817I t

James J. Raleigh, Project Manager PDR ADOCK 05000387 Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Request for Additional Information cc w/enclosure:

See next page DISTRIBUTION i Docket File NRC 8 Local PDRs PDI-2 Reading SVar a

OFFICE P

190032 JCalvo CHiller JRaleigh MO'Brien 2 PDI-2/P PDI-2 lit4lu i ~%~K CFgfP( gN OGC

RScholl, 8E-2 ACRS(10)

EWenzinger, RGN-I

JWhite, RGN-I NAME

'ien JRalei b

CMiller DATE

/

92

>]

92 792 OFFICIAL RECO COPY DOCUMENT NAME:

SU83426.RAI

e 4

I 4

1

~Q RLGy

~ (I

'o Cy 0

C O

I C

Cy

'Cg+

gO

++*a+

Docket Nos.

50-387 and 50-388 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 17, 1992 Hr. Harold W. Keiser Senior Vice President Nuclear Philadelphia Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dear Hr. Keiser I

SUBJECT:

RE(VEST FOR ADDITIONAL INFORMATION ON PROPOSED POWER UPRATE, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1

AND 2 (TAC NOS.

H83426 AND M83427)

The staff has reviewed the instrumentation and control (IKC) portion of the proposed power uprate submittal that was made by Pennsylvania Power 'and Light.

Company (PPKL or the licensee) in a letter, serial PLA-3816, dated July-24, 1992.

Based on this review, we have concluded that further information is required to provide clarification of some apparent contradictions and differences between information contained in the licensee's submittal and referenced material.

As a result of this review, the staff has developed questions which form the basis of this request for additional information.

These questions are provided in the enclosure.

If you have any questions, please contact me on (301) 504-1447.

This requirement affects fewer than 10 respondents and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.

Sincerely,

Enclosure:

Request for Additional Information James J. Raleigh, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc w/enclosure:

See next page

~

Mr. Harold W. Keiser Pennsylvania Power

& Light Company Susquehanna Steam Electric Station, Units 1

& 2 CC:

Jay Silberg, Esq.

Shaw, Pittman, Potts

& Trowbridge 2300 N Street N.W.

Washington, D.C.

20037 Bryan A. Snapp, Esq.

Assistant Corporate Counsel Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.

M. Kenny Licensing Group Supervisor Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Scott Barber Senior Resident Inspector U.

S. Nuclear Regulatory Commission P.O.

Box 35 Berwick, Pennsylvania 18603-0035 Mr, Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.

212 Locust Street P,O, Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Superintendent of Plant Susquehanna Steam Electric Station Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1,

Box 1797 Berwick, Pennsylvania 18603 Mr. Robert G.

Byram Vice President-Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

RE(VEST FOR ADDITIONAL INFORMATION SUS(UEHANNA POWER UPRATE REVIEW 1.

The staff notes that different instrumentation is used for some functions than that discussed in NEDC-31336.

Therefore, please provide the following information:

a.

For the Barksdale BlT-M12SS-GE and B2T-M12SS-GE instruments; describe how instrument repeatability, static pressure, overpressure, and seismic effects are accounted for (and quantify if appropriate).

b.

For the Barton 228A instrument; describe how static pressure, overpressure, and seismic effects are accounted for (and quantify if appropriate).

2.

NEDC-31336, on page 4-40, states "Confirmation Ratios less than 1.0 indicate conformance."

However, page 1-7 of your setpoint submittal (PLA-3816) includes test interval data with confirmation ratios greater than 1.

Please explain:

a.

How outliers were treated in the determination of the drift rate for the Barton 228 switches.

b.

What is meant by the statement (page 1-5 of PLA-3816)

"D 8.74 psi; for conservatism and appropriate confirmation ratio, let Dl = 13.1 psi 3.

It is our position that Topical Reports that have not been reviewed and approved by the staff may be used as the basis for a licensing action.

GEITAS (cited on pages 1-2 and 2-2 of PLA-3816) is such a document.

Therefore,

please, provide a copy for our review.