Site: Susquehanna  Talen Energy icon.png
Issue date: 03/24/1992
From: Raleigh J
Office of Nuclear Reactor Regulation
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157B117 List:
References
TAC-M82371, TAC-M82372, NUDOCS 9203270242
Download: ML17157B116 (5)


Text

~

0 Do'cket Nos.

50-387 and 50-388 Mr. Harold W. Keiser Senior Vice President Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Keiser:

March 24, 1992

SUBJECT:

TOPICAL REPORT PL-NF-89-005, "QUALIFICATION OF TRANSIENT ANALYSIS METHODS FOR BWR DESIGN AND ANALYSIS," SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1

AND 2 (TAC NOS.

M82371 AND M82372)

By letter dated January 22,

1990, Pennsylvania Power and Light Company (the licensee) requested NRC review and approval of Topical Report PL-NF-89-005, "Qualification of Transient Analysis Methods for BWR Design and Analysis" for Susquehanna Steam Electric Station (SSES),

Units 1 and 2.

Based upon the staff's review, as given in the enclosed NRC Safety Evaluation, we find the application of PL-NF-89-005 acceptable for use in the

SSES, Unit 1 Cycle 7

reload analysis under the limitations delineated in the associated NRC technical evaluation.

A revised methodology which explicitly models a time-varying axial power distribution in the hot fuel bundle has also been reviewed and approved with the limitations delineated in the enclosed NRC Safety Evaluation.

This revised methodology will be used by the Pennsylvania Power and Light Company for future reload analyses beginning with SSES, Unit 2 Cycle 6.

Enclosure:

Safety Evaluation and Technical Evaluation Report cc w/enclosure:

See next page Sincerely,

/S/

James J. Raleigh, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation DISTRIBUTION Docket File NRC

& Local PDRs PDI-2 Reading SVarga JCalvo CMiller JRaleigh MO'Brien(2)

OGC ACRS(10)

LKopp RBlou h, RGN-I

JWhite, RGN-I OFFICE NAME DATE 92 PDI-2 P

JRalei h:rb 9

92 PDI-2 D

CMillef Af 3

L~ 92 PDR

+>

9203'oap P

ADgcg 0~0 4

PDR

~g Any 0

Cy OO C

Vl

+

~O

+w*w+

Docket Nos.

50-387 and 50-388 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 March 24, 1992 Mr. Harold W. Keiser Senior Vice President - Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Hr. Keiser:

SUBJECT:

TOPICAL REPORT PL-NF-89-005, "QUALIFICATION OF TRANSIENT ANALYSIS METHODS FOR BWR DESIGN AND ANALYSIS," SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1

AND 2 (TAC NOS.

H82371 AND M82372)

By letter dated January 22,

1990, Pennsylvania Power and Light Company (the licensee) requested NRC review and approval of Topical Report PL-NF-89-005, "Qualification of Transient Analysis Methods for BWR Design and Analysis" for Susquehanna Steam Electric Station (SSES),

Units 1 and 2.

Based upon the staff's review, as given in the enclosed NRC Safety Evaluation, we find the application of PL-NF-89-005 acceptable for use in the

SSES, Unit 1 Cycle 7

reload analysis under the limitations delineated in the associated NRC technical evaluation.

A revised methodology which explicitly models a time-varying axial power distribution in the hot fuel bundle has also been reviewed and approved with the limitations delineated in the enclosed NRC Safety Evaluation.

This revised methodology will be used by the Pennsylvania Power and Light Company for future reload analyses beginning with SSES, Unit 2 Cycle 6.

Sincerely,

Enclosure:

Safety Evaluation and Technical Evaluation Report cc w/enclosure:

See next page James J. Raleigh, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

I

Mr. Harold W. Keiser Pennsylvania Power

& Light Company Susquehanna Steam Electric Station, Units 1

& 2 CC:

Jay Silberg, Esq.

Shaw, Pittman, Potts

& Trowbridge 2300 N Street N.W.

Washington, D.C.

20037 Bryan A. Snapp, Esq.

Assistant Corporate Counsel Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.

M. Kenny Licensing Group Supervisor Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Scott Barber Senior Resident Inspector U.

S. Nuclear Regulatory Commission P.O.

Box 35 Berwick, Pennsylvania 18603-0035 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.

212 Locust Street P.O.

Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I

U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Superintendent of Plant Susquehanna Steam Electric Station Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company 1009 Fowles Avenue Berwick, Pennsylvania 18603 Mr. Robert G.