ML17157B093
| ML17157B093 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/11/1992 |
| From: | Hodges M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17157B094 | List: |
| References | |
| NUDOCS 9203190211 | |
| Download: ML17157B093 (5) | |
See also: IR 05000387/1990081
Text
~ ~
FORD
1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
'CCESSION NBR:9203190211
DOC.DATE:'92/03/11
NOTARIZED: NO
DOCKET ¹
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
~
~
~
UTH.NAME
AUTHOR AFFILIATION
DGES,M.W.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
KEISERiH.W.
Power
& Light Co.
SUBJECT:
Ack receipt of 911212 ltr informing NRC of steps
taken to
correct violations noted in insp repts
50-387/90-81
&
50-388/90-81.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: .General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:LPDR
1
cy Transcripts.
LPDR
1 cy
Transcripts.
ping'
05000387
05000388 Z)
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
AEOD/DEIIB
DEDRO
NRR MORISSEAU,D
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9H-
NRR/PMAS/ILRB12
~O'
LE
02
EXTERNAL: EG&G/BRYCEgJ.H.
NOTES:
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
RECIPIENT
ID CODE/NAME
RALEIGH,J.
AEOD/DSP/TPAB
NRR HARBUCKiC.
NRR/DLPQ/LHFBPT
NRR/DOEA/OEAB
NRR/DST/DIR 8E2
NUDOCS-ABSTRACT
OGC/HDS2
RGN1
FILE
Ol
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1,
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
Docket Nos.
50-387
50-388
hlAR X g 3992
License Nos. NPF-14
NPF-22
Mr. Harold W. Keiser
Senior Vice President - Nuclear
Pennsylvania Power &Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
Dear Mr. Keiser:
SUBJECT:
INSPECTION NOS. 50-387/90-81; 50-388/90-81
This refers to your response to our Notice of Violation (NOV) associated
with the subject
inspection report which was undated, but notarized on March 28, 1991
This letter also
acknowledges receipt of your letter dated December
12, 1991, which updates your letter of
April 29, 1991.
The latter letter was in response
to the weaknesses
identified by the subject
inspection,
In reference to your letter dated December
12, 1991, you advised us of your revision to the
estimated completion dates for the I&C Planning Guideline and the I&C Procedure Writer'
Guide.
We find this change in the schedule which was originally provided in your
April 29, 1991, response to be acceptable.
In your letter responding to our NOV, you agreed with Violation Numbers
1, 2, 3, and 5,
and example "a" of Violation Number 4. The corrective actions willbe examined during a
future inspection of your licensed program.
You did not agree with example "b" of Violation Number 4 because it was not an indication
of inadequate work planning.
You stated that there was recognition of the leakage potential
of the butterfly valve HV-11024B1, since the leakage would be into a nonsafety system..Our
inspector was observing the installation work on the valves 110060, 110061, and 110062
when the flooding occurred.
During this work, he observed the worker response
to quickly
complete the flange make-up for the 110060 valve in order to stop the flooding. This
reaction resulted in damage to the valve's flange gasket, which was subsequently
replaced.
Our inspector also noted that the workers were unaware of the potential for flooding when an
emergency service water pump was started to perform testing for another work activity.
OFFICIALRECORD COPY
A:SUS9081R
& K:SUS9081R
92031'702ii 'P203ii
ADOCK 05000387
8
)
~r 0
Mr. Harold W. Keiser
The planning process had provided no precautions on the work authorization or Equipment
Release Form (ERF).
The ERF merely stated, "Sign on System Permit 1-90-1033."
Based
upon the apparent lack of coordination between the two jobs, we concluded that'work
planning and instructions to the workers were inadequate,
and the intent of ANSI 18.7-
1972/ANS-3.2 was not met.
Thus, we conclude that Violation No. 4, example "b," should
stand.
Thank you for informing us of the corrective and preventive actions documented in your
letter.
Your cooperation with us is appreciated.
Sincerely,
Marvin.W. Hodges, Director
Division of Reactor Safety
CC:
A. R. Sabol, Manager, Nuclear Quality Assurance
J. M. Kenny, Licensing Group Supervisor
H. G. Stanley, Superintendent of Plant-SSES
R. G. Bryam, Superintendent of Plant-SSES
J. A. Isabella, Director, Generation Projects Department, Atlantic Electric
M..M. Urioste, Nuclear Services Manager, General Electric Co.
B. A. Snapp, Esquire, Assistant Corporate Counsel
H. D. Woodeshick, Special Assistant to, the President
J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
W. Lowthert, Manager of Nuclear Training
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) (w/copy of ltr notarized 3/28/91, & copy of ltr dtd 12/12/91)
NRC Resident Inspector (w/copy of ltr notarized 3/28/91, & copy of ltr dtd 12/12/91)
Commonwealth of Pennsylvania (w/copy of ltr notarized 3/28/91, & copy of ltr dated
12/12/91)
OFFICIALRECORD COPY
A'SUS9081R
& K:SUS9081R
Mr. Harold W. Keiser
bcc w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
M. Hodges, DRS
L. Bettenhausen,
J. Joyner, DRSS
N. Blumberg, DRS
J. White, DRP
R. Blough, DRP
D. Caphton, DRS
B. Norris, DRP
DRSS SAI.P Coordinator
C. Miller, PDI-2, NRR
R. Lobel, EDO
J. Raleigh, NRR
DRS Files (5)