Discusses Requalification Program Evaluation Scheduled for 920106-10.Ref Matl Requirements,Directions for Administering Requalification Exams & NRC Rules & Guidance for Examinees Encl
ML17157A901
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/16/1991
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 9110280056
Download: ML17157A901 (14)


Text

ocr 16 1991 Docket Nos.

50-387 50-388 Mr. Harold W. Keiser Senior Vice President,-

Nuclear Pennsylvania Power 8 Light Company 2 North Ninth Street Allentow'n, Pennsylvania 18101

Dear Mr. Kei ser:

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION Arrangements have been made between Mr. A. Fitch, Nuclear Operations Training Supervisor, and Ms. T. Walker, Chief Examiner, for an evaluation of the requalification program and licensed personnel at your Susquehanna facility.

The evaluation visit is scheduled. for the week of January 6,

1992 'he requalification examinations and the subsequent evaluation of the facility requalification program will'e performe'd in accordance -with sections 601.

through 604 of NUREG-102', Operator Licensing Examiner Standards, Revision 6.

'ou are encouraged to ensure that your training staff and proposed examinees are familiar"wi'th these standards.

For the examiners to adequately prepare for this visit, it will be necessary for the facility to furnish the approved items, listed in Enclosure 1,

"Reference Material Requirements" by November ll, 1991.

Failure.to.supply the reference material as required by Enclosure 1 may result in postponement of the

'examination.

The Chief Examiner may request that the facility submit a

proposed examination for use during the examination week in addition to the material requirements of Enclosure

1. 'ubmission of a proposed examination, even if requested, is optional.

However, if a proposed examination is submitted, those personnel participating in its development may become subject to'he security restrictions described below.

Mr. Fitch has been advised of our reference material requirements, whether a proposed examination is requested, and where these items are to be sent.

Please r'eview the guidance promulgated in Revision 6 to NUREG-1021 on the content and scope of simulator examination scenarios.

The scenario examination bank should cover the entire spectrum of Emergency Opera'ting Procedures (EOPs),

includin'g alternate decision paths within EOPs, and should incorporate a range of failures with varying degrees of severity for the same type of event.

Each

'scenario should contain simultaneous events that require that the crew prioritize action's and assign crew members to particular tasks.

Each scenario should also require that the crew determine when to transition between EOPs and determine which actions to take within the EOPs.

911028005b 91101b PDR ADOCK 05000387 V

PDR OFFICIAL RECORD COPY WALKER/SUSQ. I/6/92 0001.0.0 07/07/89

Mr. Harol d W. Kei ser J

You are requested to. designate at least one employee to be a member of a joint NRC/facility examination team.

The employee shall be an active SRO (per the requirements of 10 CFR 55.53(e) or (f)) from the Susquehanna Operations Department:

You 'are encoura'ged to designate a second employee from the training staff to be a member 'of the examination team.

This employee should be an active SRO (per the requirements of 10 CFR 55.53(e) or (f)), but may be a

facility or INPO certified instructor.

If desired and agreed to by the Chief

Examiner, you may designate one additional, employee from the training staff, with appropriat'e qualifications, to be a member of the examination team.,

In addition to these individuals, a simulator operator must-be made available for scenario preview and validation during the on-site examination preparation week.

In some cases, it may be necessary to designate a simulator operator during the test item review period.

This individual will also be subject to the examination security agreement.'ny facility representatives, under the security agreement, shall be restricted from knowingly communicating by any means the content or scope of the examination to unauthorized persons and from participating in any facility programs such as instruction, examination, or tutoring in which an identified requalification examinee(s) will be present.

These restrictions shall apply from the day that the facility representative signs the examination security agreement indicating that the representative understands that he or she has specialized knowledge'f the examination.

The Chief Examiner will determine when facility-representatives h'ave received specialized knowledge concerning the examination and require execution of an examination security agreement.

In most cases,

-the examination team members will not be required to enter into. an examination security agreement more than 60 days prio'r to the examination week.

The simulator operator will normally become subject to the requirements during the examination preparation and validation week; but, in some cases, this may occur as much as 30 days prior to the examination week to support operating test item review and revision.

The facility shall identify to the NRC 60 days prior to the examination administration date, the proposed operators, including crew composition, for the examination.

This information should be provided by the facility training staff,to the NRC's Chief Examiner.

The facility management is responsible for providing adequate space and accommodations to. properly develop and conduct the examinations.

Enclosure 2,

"Administration of Requalification Examinations," describes our requirements for developing and conducting the examinations.

Mr. Fitch has also been. informed of these requirements.

Also, a fa'cility operations management representative (as a minimum, first level above shift supervisor)'hould observe the simulation facility examination process at the site.

Enclosure 3 contains

the, "NRC Rules and Guidance for Examinees" that will be in effect during the administration of the written examination.

The facility management is responsible for ensuring that all operators are aware of these rules.

'I OFFICIAL RECORD COPY WALKER/SUSQ. 1/6/92 - 0001.0.

1 07/07/89

Mr. Harold W. Keiser This request is covered by Office of Management and Budget Clearance Number 3150-0101 which expires May 31, 1992.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />'er

response, including gathering, copying and mailing the required material.

Send comments regarding this burden estilate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support

Services, Office of Information Resources Management, U.

S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office'f Information and Regulatory Affairs, NEOB-3019, and Office of Management and Budget, Washington, D.C. 20503.

Thank you for your consideration in this matter.

If you have any questions on the evaluation process; please contact me a't (215) 337-5210.

Sincerely, Orh ~i..al gaea hpp Ri chard J.

Conte, Chi e f.

BWR Section Operations Branch Division of Reactor Safety

Enclosures:

1.

Reference Material Requirements 2.

Administration of Requalification Examinations 3.

NRC Rules and Guidance for Examinees cc w/encl:

A.

R. Sabol,

Manager, Nuclear (}uality Assurance J.

M. Kenny, Licensing Group Supervisor H.

C. Stanley, Superintendent of Plant-SSES R.

G.

Bryam, Superintendent of Plant-SSES S.

B. Ungerer, Manager, Joint Generation Projects Department A. Fitch, Nuclear Operations Training Supervisor W. Lowthert, Training Manager J.

D. Decker, Nuclear Services

Manager, General Electric Co.

B. A. Snapp, Esquire, Assistant Corporate Counsel H.

D. Woodeshick, Special Assistant to the President J.

C. Tilton, III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania OFFICIAL RECORD COPY WALKER/SUSg. 1/6/92 " 0002.0.0 07/07/89

Mr. Harold W.

Keiser'cc w/encl:

Region I Docket Room (with.concurrences)

Management Assistant, DRMA (w/o 'encl)

J. Joyner, DRSS J. White, DRP R. Blough, DRP'.

Kaufman, DRP R. Lobel, EDO P. Cortland; NRR R. Conte, DRS T. Walker, DRS DRS Files (5)

RI:DRS Walker/dmg 10/09/91 RI: DRS Conte

>0/<i/9I OFFICIAL RECORD COPY WALKER/SUSQ. I/6/92 - 0003.0.0,.

07/07/89

a

ENCLOSURE 1

REFERENCE MATERIAL REQUIREMENTS Test items to support all aspects of the requalification examination must be provided to the NRC 60 days prior to the examination date.

All test items should be developed in accordance with the guidelines provided in sections 602 through 604 of NUREG 1021, Operator Licensing Examiner Standards, and their respective attachments.

For the first requalification evaluation at the facility, the submittal must contain at least:

700 test items for use in the written examination.

They should be equally divided between the two sections of the examination, and there must be at least 350 test items for use in each section.

75 job performance measures (JPMs) for use on the walk-through portion of the operating examination.

To the extent possible, approximately 40% of the JPMs should evaluate "in plant" tasks (system/component operation outside the control room).

15 simulator scenarios of approximately 50 minutes each in length for use on the simulator portion of the operating examination for examinations

'dministered in one week.-

For subsequent requalification examination facilities are expected to make submittals reflecting progress toward the following targets over the next 5

years after the initial evaluation visit:

A minimum of 700 test items for use in the written examination equally divided between the two sections of the written examination and which cover all safety-related elements of the facility job task analysis (JTA).

The bank shall be dynamic in nature, in that at 1'east 150 questions a year shall be reviewed, revised or generated.

New questions that are developed should cover equipment and system modifications, recent industry and licensee events and procedural changes'PMs to evaluate each operator and senior operator safety-related task

, identified in the facility JTA, which meet the criteria in ES-603.

The JPM bank should expand at a rate of at least 10 JPMs per year until this goal is reached.

It is estimated that 125 150 JPMs will be the fi'nal result.

Development of the questions associated with the JPMs shall also

continue, such that there is a representative sample of questions given the knowledges associated with the task listed in the JTA.

Enclosure 1

A bank of at least 30 simulator scenarios which reflect all plausible or expected abnormal and emergency situations to which control room operators are expected to respond or control.

At least 5 scenarios per year should

'be generated until all aspects of the emergency operating procedures are covered with sufficient variation in the type and scope of initiating events and level of degradation".

For all requalification examination and evaluation visits, the facility shall:

submit an Examination Test Outline/Sample Plan which meets the requirements of ES-601, ;

provide the associated examination banks (written, simulator and JPM) and

.,associated reference material.

At a minimum, this shall include Technical Specifications, plant operating; surveillance; and administrative procedures that are applicable to the JPMs, abnormal and emergency operating procedures, emergency plan procedures, and the job task lists for all licensed positions.

Additional reference material may be requested by the Chief Examiner.

ENCLOSURE 2 ADMINISTRATION OF REQUAL IF I CATION'XAMINATIONS An evaluation of at least twelve facility licensed operators is required for a program evaluation.

Normally the crew scheduled for requalification training during the period selected for the program evaluation should be selected.

The sample will include other licensed operators who are not routinely performing shift duties or are not maintaining an active license per 10 CFR 55.53(e).

The restrictions on crew composi,tion in the simulator are describ'ed in ES-601(C. 1.b) and ES-604.

The simulator and a simulator operator( s) will be provided for examination development.

The date(s) and duration of time needed to develop the examinations will be agreed upon by the chief examiner and the facility.

The reference material used in the simulator will be reviewed by the chief

examiner, no material will be made available that is solely used for training.

A single room shall be provided for completing Section B of the written examination.

The location of this room and supporting rest room facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the examination.

Minimum spacing is required to ensure examination integrity as determined by the chief examiner.

Minimum spacing should be one candidate per table, with a three-foot space between tables.

No wall charts,

models, and/or other training materials shal1 be present in the examination room.

Copies of reference material for Section B of the written examination. will be provided for eachexaminee.

The reference material wi 11 be reviewed by the chief examiner and will consist of Technical Specifications, operating/abnormal procedures, administrative procedures, Emergency Plans as available to the plant operators.

Video taping capabilities can be utilized.

The facility should contact the chief examiner for restrictions related to its usage.

An attempt will be made to distinguish between RO and SRO knowledge and abilities to the extent that such a distinction is supported by the facility training materials.

Prudent, scheduling of exam week activities is important to help alleviate undue stress on the operators.

Your training staff and the Chief Examiner should work very closely in formulating a schedule which does not result in excessive delays in crews or individuals being administered their examination.

The following are some suggestions for structuring the exam activities to achieve this purpose:

Enclosure 2

2 Don',t bring in crews or. individuals well before their scheduled exam times.

When examining operators in groups, it is better to hold the group.

just completing their exam vice the groups that are taking their exam plater.

Following simulator scenarios, the facility evaluators and NRC examiners should quickly determine whether follow-up questioning is

required, so that the crew may be released to, talk among themselves about the scenario.

Ensure that time validation of JPMs, particularly those performed in the simulator, is conducted accurately.

A reasonable schedule should be established to prevent operators from waiting for simulator

'vailability to complete their JPMs.

e

ENCLOSURE 3

NRC RULES AND GUIDANCE FOR EXAMINEES Use black ink or dark pencil ONLY to facilitate legible reproductions.

Prin't your name in the blank provided on the cover sheet of the.

examination.

'I r

Fill in the date on'the cover sheet of, the examination, if necessary.

4.

An'swer each question on the examination.

If additional paper is required, use only the lined paper provided by the examiner.

5.

Use abbreviations only if they are commonly used in facility literature.

6.

The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.

Show all calculations, methods or assumptions used to obtain an answer to a mathematical pr'oblem, whether asked for in the question or not.

Unless solicited, the location of references need not be stated.

9.

Proportional grading will be applied.

Any additional wrong information that is provided may count against you.

For example, if a question is worth one point and asks for four responses, each'f.which is wor'th 0'5

points, and you give five responses, each response will be worth 0.20 points.

If-one of your five responses is incorrect, 0.20 will be deducted and your total credit for that-question will be 0.80, even th'ough you may have listed the four correct responses iw.the answer key.

l'0.

Partial credit may.be gi.ven, except on multiple choice questions.

Therefore, ANSWER ALL PARTS OF THE QUESTION AND DO NOT LEAVE ANY.ANSWERS

'BLANK.

11.

If parts of the examination are not clear with respect to their intent, ask questions of the examiner only.

12.

You must sign the statement on the cover sheet that indicates the work on the examination is your own and that you have not received or been given any assistance in.completing the examination.

This must be signed AFTER the examination has. been completed.

13.

Restroom trips are to be limited and only one examinee at a time may leave.

You must avoid all contact with anyone outside the examination room. to avoid even the appearance or possibility of examination compromise.

Enclosure 3

14.

Cheating on the examination.would result in a revocation of your license and could result in more severe.penalties.

15.

Each section of the examination is desi'gned to take approximately 90 minutes to complete.

You will be given two hours to complete each section to allow for thirty minutes of review.

16.

The examination has been time validated by knowledgeable persons.

You should be aware that not every answer needs to be verified by consulting a reference and excessive usage of reference material may cause you to not complete the exam in the allotted time.

.17.

Due to 'the. existence of questions that will require all examinees to'efer to the same indications or controls,,particular care must be taken to maintain individual examination security and avoid any possibility of compromise or appearance of cheating.

18.

When you are. finished.and have turned in your completed examination, leave the examination area.

(

Il l