Forwards Safety Insp Repts 50-387/90-26 & 50-388/90-26 on 901230-910211.Violation Noted
ML17157A625
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/20/1991
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157A626 List:
References
NUDOCS 9103290041
Download: ML17157A625 (6)


See also: IR 05000387/1990026

Text

MAf> 3 (l )Qgt

Docket Nos.

50-387

50-388

Pennsylvania Power A, Light Company

ATTN:

Mr. H. W. Keiser

Senior Vice President - Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

NOTICE OF VIOLATIONCombined Inspection 50-387/90-26; 50-388/90-26

The enclosed report documents a routine safety inspection conducted by inspectors of this

office from December 30, 1990 to February 11, 1991, at the Susquehanna

Steam Electric

Station (SSES), Salem Township, Pennsylvania.

The inspection covered plant operations,

surveillance, 'and maintenance activities for both units.

At the conclusion of the inspection,

Mr. G. S. Barber, NRC Senior Resident Inspector, summarized the inspection findings, as

detailed in the enclosed report, with Mr. H. G. Stanley and other members of your staff.

t

Based on the results of this inspection, it appears

that one of your activities was not in full

compliance with NRC regulations.

On January

15, 1991, the inboard Main Steam Isolation

Valves (MSIVs) for Susquehanna

Unit 1 were declared inoperable due to low, Containment

Instrument Gas (CIG) Pressure.

However, the plant operators failed to recognize that

Technical Specification 3.6.3 applied as a Limiting Condition of Operation in this instance;

and the Shift Surveillance Operating Log Procedure SO-100-006 failed to include any

reference to this Technical Specification.

Accordingly, this matter is identified as a violation

of Technical Specification 6.8.1, relative to failure maintain plant conditions within the

boundaries specified by the Technical Specification and License Conditions as required by

Procedure 80-QA-300, Conduct of Operations.

This issue is set forth in the Notice of

Violation enclosed

as Appendix A. You are required to respond to this letter and should

follow the instructions specified in the enclosed Notice when preparing your response.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

The responses

directed by

this letter and the Notice are not subject to the clearance procedures of the Office of

Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

910329004'f0320

PDR

ADOCK 05000387

9

PDR

$d

r

0

(

Pennsylvania Power Ec Light Company

2

Your cooperation with us in this matter is appreciated.

Sincerely,

r'

~ l

~ ~

~

L'.

Randolph Blough, Chief,

Reactor Projects Branch 2

Division of Reactor Projects

Enclosures:

l. "Appendix A, Notice of Violation

2.

Combined NRC Inspection Report 50-387/90-26; 50-388/90-26

cc w/encl:

R. G. Byram, Vice President, Nuclear Operations

H. G. Stanley, Superintendent of Plant - SSES

A. R. Sabol, Manager, Nuclear Quality Assurance

J. M. Kenny, Licensing Group Supervisor

S. B. Ungerer, Manager, Joint Generation Projects Department, Atlantic

Electric

J. S. Decker, Services Project Manager, General Electric Company

B. A. Snapp, Esquire, Assistant Corporate Counsel

H. D. Woodeshick, Special Office of the President

J. C. Tilton III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

t

Pennsylvania Power Ec Light Company

bcc w/encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. White, DRP

P. Kaufman, DRP

T. Johnson,

Senior Resident Inspector, Salem/Hope Creek

J. Joyner, DRSS

R. J. Kiessel, NRR

E. L. Conner, DRP

J. J. Raleigh, Acting NRR Project Manager

J. Noggle, DRSS

K. Brockman, EDO

J. Trapp, DRS

H. Kaplan, DRS

bcc w/letter and Executive Summary Only:

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

J. Durr, DRS

R. Gallo, DRS

M. Knapp, DRSS

W. Butler, NRR

P

B rber

~l

0

1

RI

J.

hite

RI:DRP

~

~

A.R. Blough

02/~~/91

OFFICIALRECORD COPY

0

t