October 30, 1990 Docket No. 50-388 Mr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Dear Mr. Keiser:
SUBJECT:
CONFIRMATION OF CHANGE TO TECHNICAL SPECIFICATIONS FOR SUS(UEHANNA STEAM ELECTRIC STATION, UNIT 2 (TAC NO. 77900)
This confirms our telephone authorization given on October 30, 1990, for a change to the Technical Specifications for Susquehanna Steam Electric Station, Unit 2, as requested in your letter, dated October 30, 1990.
Facility Operating License No. NPF-22 is amended as requested in your letter dated October 30, 1990.
The Technical Specification change permits relief from the provisions of action "a" of Technical Specification Section 3.6.3 related to the reactor water cleanup system isolation valve.
The relief will be effective from October 30, 1990 through the next refueling outage, scheduled for March 1991, or earlier if an outage of sufficient duration to revise the setting occurs.
The corrected Technical Specification page is enclosed.
The formal license amendment and our completed safety evaluation of this change to the Technical Specifications for Susquehanna Steam Electric Station, Unit 2 is being processed and copies of these documents will be sent to you in the near future.
Sincerely,
/S/
Enclosure:
Technical Specification Page cc w/enclosure:
See next page LEmerg.
TS Change SUj Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
. =>~U DISTRIBUTION w/encl osures t
oc e
~z e
or an RC PDR BGrimea PDI:2 Rdg SVarga JCal vo BBoger WButler ACRS(10)
MThadani JStone OC/LFMB OGC DHagan WBateman JPartlow C
en JKudrick Wanda Jones PDP ~
PD I-2/D A@a'ha ni:tlc WButler
/
90
/tg /)P/90 L</9o/90
(
90ii080164 90i030 PDR ADOCK 05000338 P
()/90 Local PDR GHill(4)
TMurley RGoel TMendiola GPA/PA MO'Brien(3)
WKane CHehl CSchulten, OTSB JLieberman RBlough PSwet
)
~
'f,lw w P
PM (t
4 'R I
Rt II I
11
~ (f4 ~
UI F
YR (f(F )l P
Ull >
I ti:;
~
I' 4
w I"
1 ftJ 4
4 Ur I
(
i W I M
F FR, C
(fly' I ~I'I'-
w w
P M
Fjl
" f't M
P
'I III
(
't 1(
4 MM
'tf I
If lt I f (I'
lf M
k'ff I
1 f
t
(
4 W
M I
F I
P Pi 4
Mw FI t
~ F It 4
,',t P
UF ~
M (RF I 4
I (
R fl F
4 I
I'41
- w t F
~ '\\ If F/4 It
CORRECT '
0
~
Cy A
O
/y (N
+a*++
Docket No. 50-388 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 30, 1990 Mr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Al1 entown, Pennsyl vania 18101
Dear Mr. Keiser:
SUBJECT:
CONFIRMATION OF CHANGE TO TECHNICAL SPECIFICATIONS FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 (TAC NO. 77900)
This confirms our telephone authorization given on October 30, 1990, for a change to the Technical Specifications for Susquehanna Steam Electric Station, Unit 2, as requested in your letter, dated October 30, 1990.
Facility Operating License No. NPF-22 is amended as requested in your letter dated October 30, 1990.
The Technical Specification change permits relief from the provisions of action "a" of Technical Specification Section 3.6.3 related to the reactor water cleanup system isolation valve.
The relief will be effective from October 30, 1990 through the next refueling outage, scheduled for March 1991, or earlier if an outage of sufficient duration to revise the setting occurs.
The corrected Technical Specification page is enclosed.
The formal license amendment and our completed safety evaluation of this change to the Technical Specifications for Susquehanna Steam Electric Station, Unit 2 is being processed and copies of these documents will be sent to you in the near future.
Sincerely,
Enclosure:
Technical Specification Page cc w/enclosure:
See next page Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Mr. Harold W. Keiser Pennsylvania Power
& Light Company Susquehanna Steam Electric Station Units 1 5 2
CC:
Jay Si lberg, Esq.
Shaw, Pittman, Potts 5 Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power 5 Light Company 2 North Ninth Street Al 1 entown, Pennsy 1vani a 18101 Mr. J.
M. Kenny Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Scott Barber Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. Thomas M. Geruslp, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.
Box 2063 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harr isburg, Pennsylvania 17108-1266 Mr. S.
B. Ungerer Joint Generation Projects Department Atlantic Electric P.O.
Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Superintendent of Plant Susquehanna Steam Electric Station Pennsylvania Power and Light Company 2 North Ninth Street Al 1 entown, Pennsy 1 vani a 18101 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company 1009 Fowles Avenue Berwick, Pennsylvania 18603 Mr. Robert G. Byram Vice President-Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Al 1 entown, Pennsy1 vani a 18101
TABLE 3.6.3-1 PRIMARY CONTAINMENT ISOLATION VALVES VALVE FUNCTION AND NUMBER MAXIMUM ISOLATION TIME Seconds)
ISOLATION( )
SIGNAL S
'a 0 Automatic Isolation Valves MSIV HV-241F022 A,B,C,D HV-241F028 A,B,C,D MSL Drain HV-241F016 HV-241F019 RCIC Steam Su 1
HV"249F007 HV-249F008 HV-249F088 HPCI Steam Su 1
HV-255F002 HV"255F003 HV"255F100 RHR - Shutdown Coolin Suction HV-251F008 HV"251F009 RMCU Suction( )
HV-244FOOl~
HV-244F004 RHR - Reactor Vessel Head S ra HV"251F022 HV"251F023 10 10 20 20 3
50 50 3
52 52 30 30 30 20 X,C,D,E,P,UA X,C,D,E,P,UA X,C,D,E,P,UA K,KB K,KB K,KB L,LB L,LB L,LB A,M,UB A,M,UB B,J,W I,B,J,M A,M,UB,Z A,M,UB,Z
~The RMCU HV-244 FOOl valve may be considered OPERABLE with its current minimum torque switch setting for the period beginning October 30, 1990 until an outage of sufficient duration to revise the setting occurs.
SUS(UEHANNA - UNIT 2 3/4 6-19 Effective Date:
October 30, 1990
~ l s~