ML17157A402

From kanterella
Jump to navigation Jump to search
Amend 101 to License NPF-14,revising Tech Specs to Add New Valves to Table 3.6.3-1 as Primary Containment Isolation Valves
ML17157A402
Person / Time
Site: Susquehanna 
Issue date: 10/31/1990
From: Butler W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17157A403 List:
References
NUDOCS 9011080058
Download: ML17157A402 (11)


Text

qP,g REMI

~C+

Wp0

> +i 0

9 0

IP 0***4 UNITED STATES NUCLEAR R EG ULATORY COMMISS ION WASHINGTON, D. C. 20555 PENNSYLVANIA POWER 8( LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-387 SUS UEHANNA STEAII ELECTRIC STATION UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 101 License No. NPF-14 1.

The'uclear Regulatory Commission (the Commission or the NRC) having found that:

A.

B.

The application for the amendment filed by the Pennsylvania Power 5 Light Company, dated April 17, 1990 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's regulations set forth in 10 CFR Chapter I; The facility will operate 'in conformity with the application, the provisions of the Act, and the regulations of the Commission; 2.

C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 101 and the Environmental Protection Plan con-tained in Appendix B, are hereby incorporated in the license.

PPKL shall operate the facility in accordance with the Technical Specifica-tions and the Environmental Protection Plan.

9011080058 5'01031 PDR ADOCK 05000387 P

PDC 3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications

/S/

Halter R. Butler, Director Project Directorate I-2 Division of Reactor Projects - I/II Date of Issuance:

October 31, 1990 4Pz j) Q'90 1-2/PN HThadani

/o //(/9O (S /i;/9O PDI-2/D MButler (g /g[/90

E t

~,

4' 3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Charges to the Technical Specifications Date of Issuance:

October 3]

].99O Walter R. Butler, Director Project Directorate I-2 Division of Reactor Projects - I/II

ATTACHMENT TO LICENSE AMENDMENT NO. 101 FACILITY OPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

The overleaf page are provided to maintain document completeness.*

REMOVE 3/4 6-21 3/4 6-22 3/4 6-27 3/4 6-28 INSERT 3/4 6-21" 3/4 6-22 3/4 6-27*

3/4 6-28

TABLE 3. 6. 3-1 (Continued)

PRIMARY CONTAINMENT ISOLATION VALVES VALVE FUNCTION ANO NUMBER MAXIMUM ISOLATION TIME Seconds)

ISOLATION( )

SIGNAL s Automatic Isolation Valves (Continued)

Containment Atmos here Sam le SV-15734 A,B SV-15736 A

SV-15736 8

SV"15?40 A,B SV-15742 A,B SV-15750 A,B SV-15752 A;8 SV-15774 A,B SV-15776 A

SV-15776 8

SV-15780 A, 8 SV-15782 A,B Nitro en Makeu SV-15737 SV-15738 SV-15767 SV-15789 Reactor Coolant Sam le HV"143F019 HV"143F020 Li uid Radwaste HV-16108 A1, A2 HV-16116 A1,A2 RHR - Su ression Pool

~C1i

/5 HV-151F028 A,8 CS Test HV-152F015 A,8 HPCI Suction ( )( )

HV-155F042 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2'

15 15 90 60 90 B,Y B,Y B,Y B,Y B,Y B,Y B,Y B,Y B,Y B,Y B,Y B,Y B,Y,R B,Y,R B,Y,R B,Y,R B,C B,C B,Z B,Z X,Z X,Z L,LB SUS(UEHANNA - UNIT 1 3/4 6-21 Amendment No. 91 MAY 22 1g8g

TABLE 3. 6. 3-1 (Continued)

PRIMARY CONTAINMENT ISOLATION VALVES VALVE FUNCTION AND NUMBER MAXIMUM ISOLATION TIME, ISOLATION)( )

Automatic Isolation Valves (Continued)

Su ression Pool Cleanu HV-15766 HV-15768 HPCI Vacuum Breaker HV-155F075 HV-155F079 RCIC Vacuum Breaker HV-149F062 HV-149F084 TIP Ball Valves (d)

C51-J004 A,B,C,D,E Containment Radiation Detection S stem SV-157100 A,B SV-157101 A,B SV"157102 A,B SV-157103 A,B SV-157104 SY"157105 SV"157106 SV-157107 b.

Manual Isolation Valves MSIV-LCS Bleed Valve HV-139F001 B, F, K, P Feedwater(-(e)

HV-141F032 A, B RMCU Return HV-14182 A,B R~!

HV"149F013 1"49-020 30 30 15 15 10 10 N/A N/A N/A N/A N/A'/A N/A N/A A,Z A,Z LB,Z LB,Z KB,Z KB,Z A,Z (f)

(~)

(i:)

(~)

(f)

(~)

(f)

(t)

SUS(UEHANNA - UNIT 1 3/4 6"22 Amendment No.

Ipy

I,

TABLE 3.6. 3-1 (Continued)

PRIMARY CONTAINMENT ISOLATION VALVES

'VALVE FUNCTION AND NUMBER Excess Flow Check Valves (Continued)

Reactor. Recirculation XV-143F003 A,.B XY-143F004 A,B XY-143F009 A,B,C,D XV"143F010 A,B,C,D XV-143F011 A,B,C,D XV-143F012 A,B,C,D XV-143F040 A,B,C,D XV-143F057 A,B Nuclear Boiler Vessel Instrument XY-142F041 XV-142F043 A,B XV-142F045 A,B XV-142F047 A,B XV-142F051 A,B,C,D XV-142F053 A,B,C,D XV-142F055 XV-142F057 XV-142F059 A,B,C,D,E,F,G,H,L,M,N,P,R,S,T,U XV-142F061 XV-14201 XV-14202 Nuclear Boiler XV-141F070 A,B,C,D XV-141F071 A,B,C,D XV-141F072 A,B,C,D XV-141F073 A,B,C,D XV-141F009 MSIVLCS XV-13910 B,F,K,P SUSQUEHANNA - UNIT 1 3/4 6-27 Amendment No.

40

+pew ~~ ~

>> ji i I'

~ ~ A C

.i'lQ

TABLE 3. 6. 3-1 (Continued)

PRIMARY CONTAINMENT ISOLATION VALVES NOTATION (a)

See Specification 3.3.2, Table 3.3.2-1, for isolation signal(s) that operates each automatic isolation valve.

All power operated isolation valves may be opened or closed remote-manually.

(b)

Isolation barrier remains water filled or a water seal remains in the line post-LOCA:

Isolation valve is tested with water.

Isolation valve leakage is not included in 0.60 La total Type B and C tests.

(c)

Redundant isolation boundary for this valve is provided by the closed system whose integrity is verified by Type A test.

(d)

Automatic isolation signal causes TIP to retract; ball valve closes when probe is fully retracted.

(e)

Power assisted check valve.

(f)

Solenoid valves not capable of being opened due to the absence of permanently installed electrical power.

SUS(UEHANNA - UNIT 1 3/4 6-28 Amendment No.

101 I