ML17157A340
| ML17157A340 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/04/1990 |
| From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| References | |
| NUDOCS 9010010267 | |
| Download: ML17157A340 (3) | |
Text
Docket Nos.
UNITED STATES N
LEAR REGULATORY COMMISSION REGION I 47S ALLENDALEROAD KING OF PRUSSIA, PENNSYLVANIA19405 50-387 gpp p g )I()
50-388 Pennsylvania Power
& Light Company ATTN:
Mr. Harold W. Keiser Senior Vice President
. Nuclear 2 North Ninth Street Allentown, Pennsylvania 18101 Gentlemen:
Subject:
Regional Waiver of Compliance Related to the Susquehanna Steam Electric Station Units 1
and
- 2. Technical Specifications Limiting Condition for Operation of Emergency Diesel Generator This responds to your September 1,
1990; letter requesting a
Regional Waiver of Compliance in order to allow you to prepare and submit an emergency Technical Specification Amendment request for an extension of the action statement time related to Emergency Diesel Generator availability, and subsequent review and action by the Office of Nuclear Reactor Regulation (NRR).
A copy of your request is enclosed for reference.
~
After careful consideration of your request, I have concluded that (1) the four day extension of the Action Statement for A.C. Power Source Operability (Technical Specification 3.8.1.1.b) is warranted to process an emergency Technical Specification Amendment request and (2) that the relief granted will not put the plant into an unsafe condition.
A Regional Waiver of Compliance is hereby granted for a four day extension of the Action Statement for A.C. Power Source Operability of Technical Specification 3.8.1.1.b.
The Regional Waiver of Compliance grants relief from the requirements of Susquehanna Units 1
and 2
Technical Specifications 3.8.1.1 with the following provisions.
1.
The emergency Technical Specification Amendment request will be submitted,
- reviewed, and acted upon by NRR within the four day extension.
2
~
The compensatory actions specified in your waiver request will be implemented throughout the duration of the waiver period.
3.
The above provisions are effective at 12:00 noon on September 2,
- 1990, and expire at 12:00 noon on September 6,
1990.
5
Pennsylvania Power and Light Company 2
This Waiver of Compliance and the provisions detailed above were discussed by Mr. P.
Swetland and Mr.
G. Stanley on September 1,
1990.
Sincerely, EACH-SO,)>,, Qa p Charles W. Hehl, Director Division of Reactor Projects
Enclosure:
As Stated cc w/encl:
A. R. Sabol,
- Manager, Nuclear Quality Assurance J.
M. Kenny, Licensing Group Supervisor R.
G. Bryam, Superintendent of Plant-SSES S.
B. Ungerer, Manager, Joint Generation Projects Department J.
D. Decker, Nuclear Services
- Manager, General Electric Co.'.
A. Snapp, Esquire, Assistant Corporate Counsel H.
D. Woodeshick, Special Office of the President J.
C. Tilton, III, Allegheny Electric Cooperative, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)7 Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania