ML17157A323

From kanterella
Jump to navigation Jump to search
Amends 99 & 67 to Licenses NPF-14 & NPF-22,respectively, Providing Relief from Provisions of Tech Spec 3.8.1.1, Action B,Permitting one-time Extension of Limiting Condition for Operations from 72 H to 15 Days
ML17157A323
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/13/1990
From: Wessman R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17157A324 List:
References
NUDOCS 9009270158
Download: ML17157A323 (12)


Text

(

~p,S RECT

~o V$

0

+>>*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PENNSYLVANIA POWER

& LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-387 SUS UEHANNA STEAM ELECTRIC STATION UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 99 License No. NPF-14 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found'hat:

A.

B.

The application for the amendment filed by the Pennsylvania Power Light Company, dated September 4, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

99 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

9009270158 900913 PDR ADOCK 05000387 PNU

f

3.

This license amendment became effective on September 6, 1990.

FOR THE NUCLEAR REGULATORY COMMISSION

/S/

Walter Butler for Richard H. Wessman, Acting Assistant Director for Region I Reactors Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 13, 1990 I-2/PM 0'

MThadani g)/90

'f/IP /90 OG.'DI-2/D WButler

/ ) b/90 d7 /

/90

( ]0 REGION I /

ADRI:ACTING RWessman 9/

/90 9/i+90

~

C A

k

ATTACHMENT TO LICENSE AMENDMENT NO.

99 FACILITY OPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

The overleaf page is provided to maintain document completeness.*

REMOVE 3/4 8-1 3/4 8-2 INSERT 3/4 8-1 3/4 8-2~

3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8. 1 A.C.

SOURCES A.C.

SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.8.1. 1 As a minimum, the followirig A.C. electrical power sources shall be OPERABLE:

a.

Two physically independent circuits between the offsite transmission network and the onsite Class lE distribution system, and b.

Four of the five separate and independent diesel generators*,

each with:

2.

3.

APPLICABILITY:

ACTION:

Separate engine mounted day'uel tanks containing a minimum of 325 gallons of fuel, A separate fuel storage system containing a minimum of 47,570 gallons of fuel for diesel generator A, B, C and D; and 60,480 gallons for diesel generator E, and A separate fuel transfer pump.

OPERATIONAL CONDITIONS 1, 2, and 3.

a 0 b.

With one offsite circuit of the above 3.8.1.1.a required A.C.

electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8. l.l.l. a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and Surveillance Requirement 4.8. 1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> sequentially on four diesel generators; restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOMN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With one diesel generator of 3.8. 1. 1:b inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

~ thereafter; and Surveillance Requirement 4.8. 1.1.2. a.4 within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s++++; restore the diesel generator to OPERABLE status within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s+++ or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> s.

" Shared with Unit 2.

An OPERABLE diesel generator may be removed from service for a period of eight hours when aligning diesel generator E to the Class lE distribution system.

If alignment of diesel generator E is not completed within eight hours, the appropriate ACTION will be followed.

The specified time limits in the ACTION will be measured from the time alignment of diesel generator E

began.

~ On a one-time basis, this time may be extended to 15 days.

This applies to the entry into this action which occurred on 8/30/90, and will expire when the LCO is restored, but no later than 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on 9/14/90.

++++ For the duration of the one-time extension specified in footnote +++,

this action shall read, "Perform Surveillance Requirement 4.8.1.1.2.a.4 sequentially on each diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereaf ter. "

SUSQUEHANNA - UNIT 1 3/4 8-1 Effective Date:

September 6,

1990 Amendment No.

99

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION Continued ACTION (Continued)

C.

d.

e.

Qith one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaning A.C. sources by performing Surveillance Requirement 4.8. 1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, restore one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at lease HOT SHUTDOWN within the next K hours and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore the other A.C. power source (offsite circuitor diesel generator) to OPERABLE status in accordance with the provisions of Section 3.8.1 Action Statement a or b,

as appropriate, with the time requirement of that Action Statement based on the time of initial loss of the remaining "inoperable'.C.

power source.

With one diesel generator of the above required A.C. electrical power sources inoperable, in addition to ACTION b or c, above, verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all required systems, subsystems,

trains, components and devices that depend on the remaining diesel generators as a source of emergency power are also OPERABLE; otherwise, be. in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With two of the above required offsite circuits inoperable, demonstrate

'the OPERABILITY of four diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4, for one diesel generator at a time, within eight hours unless the diesel generators are already operating; restore at least one of the inoperable offsite circuits to OPERABLE status

. within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

With only one offsite circuit restored to OPERABLE status, restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTDOWN within the next "12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With two or more of the above required diesel generators inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8. 1. l.l.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and 4.8.1.1.2.a.4, for one diesel generator at a time, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least three of the diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore four diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SUSQUEHANNA ->>UNIT 1 3/4 8-2 Amendment No.

60 ~ '

~

y

~gfl f.KQy O~

Cy

'+0 qO e

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PENNSYLVANIA POWER

& LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-388 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 67 License No.

NPF 22 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power Light Company, dated September 4,

1990 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I',

B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

67 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment became effective on September 6, 1990.

FOR THE NUCLEAR REGULATORY COMMISSION

/S/

Walter Butler for Richard H. Wessman, Acting Assistant Director for Region I Reactors Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 13, 1990 P

A 1-2/PH n

tghadani

/p 90

'f/lJ /90 OGC PDI-2/D WButler I

(0

/) ~90

/

/90

)

REGION I

. ADRI:ACTING RWessman 9/

/90 '/)+90

ATTACHMENT TO LICENSE AMENDMENT NO.

67 FACILITY OPERATING LICENSE NO. NPF-22 DOCKET NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

The overleaf page

.is provided to maintain document completeness.*

REMOVE 3/4 8-1 3/4 8-2 INSERT 3/4 8-1 3/4 8-2*

3/4.8 ELECTRICAL POWER SYSTEMS 3/4. 8. 1 A. C.

SOURCES A. C.

SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a.

Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and b.

Four of the five separate and independent diesel generators",

each with:

l.

Separate engine mounted day fuel tanks containing a minimum of 325 gallons of fuel, 2.

A separate fuel storage system containing a minimum of 47,570 gallons of fuel for diesel generator A, B, C and D; and 60,480 gallons for diesel generator E, and 3.

A separate fuel transfer pump.

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a.

With one offsite'circuit of the above

3. 8. 1. l. a required A. C.

electrical power source inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8. 1. 1. 1. a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and Surveillance Requirement

4. 8. 1. l. 2. a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> sequentially on four diesel generators; restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next l2 hours and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With one diesel generator of 3.8. l. 1.b inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1. l.l.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

'hereafter; and Surveillance Requirement 4.8. 1. 1. 2. a.4 within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s++++; restore the diesel generator to OPERABLE status within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s+++ or be in at least HOT, SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

" Shared with Unit 2.

An OPERABLE diesel generator may be removed from service for a period of eight hours when aligning diesel generator E to the Class lE distribution system.

If alignment of diesel generator E is not comp'feted within eight hours, the appropriate ACTION will be followed.

The specified time limits in the ACTION will be measured from the time alignment of diesel generator E

began.

+++ 'On a one-time basis, this time may be extended to 15 days.

This applies to the entry into this action which occurred on 8/30/90, and will expire when the LCO is restored, but no later than 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on 9/14/90.

++++ For the duration of the one-time extension specified in footnote +++,

this action shall read, "Perform Surveillance Requirement 4.8. 1. 1.2.a.4 sequentially on each diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter."

SUSQUEHANNA - UNIT 2 3/4 8-1 Effective Date September 6

1990 Amendment No.

67

LIMITING CONDITION FOR OPERATION Continued ACTION (Continued) c.

With one offsite circuit and one diesel generator of the above required A.C. hlectrical power sources inoperable, demonstrate the OPERABILITY of the remaning A.C. sources by performing Surveillance Requirement 4.8.l.l.l.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, restore one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at lease HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore the other A.C. power source (offsite circuitor diesel generator) to OPERABLE status in accordance with the provisions of Section 3.8.1 Action Statement a or b, as appropriate, with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable A.C.

,power source.

d.

e.

With one diesel generator of the above required A.C. electrical power sources inoperable, in addition to ACTION b or c, above, verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all required systems, subsystems,

trains, components and devices that depend on the remaining diesel generators as a source of emergency power are also OPERABLE; otherwise, be in-at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With two of the above required offsite circuits inoperable, demonstrate the OPERABILITY of four diesel generators by performing Surveillance

'Requirement 4.8.1.1.2.a.4, for one diesel generator at a time, within eight hours, unless the die'sel generators are already operating; restore at least one of the inoperable offsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

With only one offsite circuit restored to OPERABLE status, restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, With two or more of the above required diesel generators inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8. 1. l.l.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and 4.8.1.1.2.a.4, for one diesel generator at a time, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and at least. once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least three of the diesel generators to OPER-

'ABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore four diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from. time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SUS)VEHANNA - UNIT 2 3/4 8-2 Amendment No 30