ML17157A300
| ML17157A300 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/22/1990 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17157A301 | List: |
| References | |
| NUDOCS 9009050203 | |
| Download: ML17157A300 (4) | |
See also: IR 05000387/1990012
Text
AUG 22 tggg
Oocket Nos.
50-387
50-388
Power
& Light Company
ATTN:
Nr.
H.
W. Keiser
Senior Vice President - Nuclear
2 North Ninth Street
Allentown, Pennsyl vania
18101
Gentlemen:
Subject:
NRC Region I Combined Inspection
50-387/90-12;
50-388/90-12
The enclosed
report documents
a routine safety inspection
conducted
by inspec-
tors of this office o'n June
10
July 21,
1990, at the Susquehanna
Steam Elec-
tric Station
(SSES),
Salem Township,
The inspection
covered plant
operations,
surveillance,
engineering
and maintenance .for both units.
At the
conclusion of the inspection,
Nr.
G.
S.
Barber
summarized
the inspection findings
to Hr.
H.
G. Stanley
and other members of your staff.
The
NRC is concerned
that several
recent
events
indicate that your organization
may not have
been aggressively
pursuing engineering
issues
that involvI conditions
potentially outside the plant design basis.
The
NRC expects its licensee's
to
perform prompt operability and reportability evaluations
on such issues.
Followup
efforts to justify the conclusions
and resolve the issues
must
be aggressively
pursued.
The time required to complete
these
determinations
should
be com-
mensurate
with their potential
safety significance.
We understand
that you
have
convened
a task group to review your treatment of engineering
issues
and
propose
appropriate
improvements
to assure
that operability, reportability,
and
corrective action determinations
are promptly completed
and expeditiously
justified.
Your corrective actions will be reviewed during
a future
NRC
inspection of your licensed activities.
Your cooperation with us in this matter is appreciated.
Sincerely,
4'EQ ey.
, ORIGlNpt gG~,
I'.
Randolph Blough, Chief
Reactor Projects
Branch
No.
2
Enclosure:
Combined
NRC Inspection
Report 50-387/90-12;
50-388/90-12
'VOOV050203 900822
ADOCK 05000387
G
PNU
OFFICIAL RECORD
COPY
CIR
SUSQ 90-12
0001.0.0
I
11/29/80
~l
4
Power 5 Light Company
2
AUG g g )ggO
cc w/encl:
R.
G.
Byram, Vice President,
Nuclear Operations
H.
G. Stanley,
Superintendent
of Plant - SSES
A.
R. Sabol,
Manager,
Nuclear Quality Assurance
J.
M. Kenny, Licensing Group Supervisor
S.
B. Ungerer,
Manager, Joint Generation
Projects
Department, Atlantic Electric
J.
S. Decker,
Services
Project Manager,
General
Electric Company
B. A. Snapp,
Esquire, Assistant
Corporate
Counsel
H.
D. Woodeshick,
Special Office of the President
J.
C. Tilton III, Allegheny Electric Cooperative,
Inc.
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
P.
Swetland,
P.
Kaufman,
T. Johnson,
Senior Resident
Inspector,
Salem/Hope
Creek
R. Bellamy,
DRSS
R. Kiessel,
E.'onner,
M. Thadani,
NRR Project Manager
,R. Nimitz,
DRSS
J. Caldwell,
J. Trapp,
bcc w/Executive
Summary Only:
W. Hehl,
J. Wiggins,
W. Hodges,
J. Durr,
R. Gallo,
M. Knapp,
DRSS
W. Butler,
ar er/meo/mjd
8/Q/90
R ~RP
PSwetland,
8/PI /90
I:DRP
RBlough
8/<(/90
OFFICIAL RECORD
COPY
CIR SUSQ 90-12 - 0002.0.0
11/29/80