Forwards Requalification Program Evaluation Repts 50-387/90-01OL & 50-388/90-01OL Administered on 900122.Util Expected to Complete Remedial Training for Two Reactor Operators That Failed Exam
ML17157A067
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/13/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157A068 List:
References
NUDOCS 9003200436
Download: ML17157A067 (2)


See also: IR 05000387/1990001

Text

Docket Nos.

50-387

50-388

IR 13 590

Pennsylvania

Power 5 Light Company

ATTN:

Mr. Harold M. Keiser

Senior Vice President - Nuclear

2 North Ninth Street

Al 1 entown,

Pennsyl vania

18101

Gentlemen:

Subject:

REQUALIFICATION PROGRAM EVALUATION, COMBINED REPORT

NOS.

50-387/90-01

(OL) and 50-388/90-01

(OL)

During the week of January

22,

1990,

the

NRC conducted

a requalification pro-

gram evaluation at the Susquehanna

Steam Electric Station.

The evaluation

was

conducted

in accordance

with NUREG-1021,

Operator Licensing

Examiner Standards,"

Revision 5, section

ES-601,

"Administration of NRC Requalification

Program

Evaluations."

The evaluation

had two purposes:

(1) to evaluate

individual li-

censed

operator

competency;

and (2) to evaluate

the effectiveness

of the licensed

operator

training program.

At the conclusion of the evaluation,

findings related

to the preparation

and administration of the requalification examinations

were

discussed

with those

members of your staff identified in the enclosed

report.

As

a result of this evaluation,

the Susquehanna

requalification program

has

been determined

to be satisfactory.

The five crews that participated

in the

examinations

performed satisfactorily

on the simulator portion of the examina-

tion.

Based

on

NRC grading, all

10 senior reactor operators

examined

passed

all portions of the examination.

Two reactor operators failed the simulator

portion.

The remaining eight reactor operators

that were examined

passed all

portions of the examination.

You are expected

to complete

remedial training

for the two reactor operators

that did not pass

the examination.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

report will be placed in the

NRC Public Document

Room.

Should you have

any questions,

please

contact

Mr.

R. Conte, Chief,

BMR

Section,

at (215) 337-5210.

Sincerely,

Oz iginsl Signed Sy!

ROBERT Q. GALLO

Robert

M. Gallo, Chief

Operations

Branch

Division of Reactor Safety

Enclosure:

Requalification

Program Evaluation,

Combined Report

Nos.

50-387/90-01

(OL) and 50-388/90-01

(OL) with Attachment

500=-:2004

6 5'<30='i"

f-DR

ADOCK 0'; 000"'87

PDC

OFFICIAL RECORD

COPY

OL CIR

SUS 90-01 - 0001.0.0

03/05/90

o

g"~ ~o.

S

Pennsylvania

Power 5 Light Company

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

J.

M. Kenny, Licensing Group Supervisor

R.

G. Bryam, Superintendent

of Plant-SSES

S.

B. Ungerer,

Manager, Joint Generation

Projects

Department

J.

D. Decker,

Nuclear Services

Manager,

General Electric Co.

B. A. Snapp,

Esquire, Assistant

Corporate

Counsel

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

P. Swetland,

DRP

R. Conte,

DRS

S. Pullani, Chief Examiner,

DRS

T. Walker,

DRS

D. Draper,

Examiner,

PNL

M. Riches,

Examiner,

PNL

M. Thadani,

NRR

J.

Dyer,

EDO

DRS Files (5)

RI: DRS

Pul

i/ajk

03/o /90

RI: DRS

Co

e

03/od/90

g.933k

4y'6~3

pcale~P

RI:

Gal l o

03P790

OFFICIAL RECORD

COPY

OL CIR SUS 90-01

0002.0.0

03/05/90