Forwards Final SALP Repts 50-387/88-99 & 50-388/88-99 for Feb 1988 - Jul 1989.Performance in Engineering Support Improved & Continued Strong Performance Noted in Area of Security/Safeguards
ML17156B610
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/31/1990
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17156B611 List:
References
NUDOCS 9002090064
Download: ML17156B610 (3)


See also: IR 05000387/1988099

Text

81 JAN 1990

Docket Nos.

50-387/NPF-22

50"388/NPF-14

Pennsylvania

Power

8 Light Company

ATTN:

Mr. Harry Keiser

Senior Vice President

Nuclear

2 North Ninth Street

Al 1 entown,

Pennsylvania

18101

Gentlemen:

Subject:

Systematic

Assessment

of Licensee

Performance

(SALP) Report

Nos.

50-387/88-99;

50-388/88-99

A Systematic

Assessment

of Licensee

Performance for the Susquehanna

Steam

Electric Station,

operated

by Pennsylvania

Power

and Light (PPLL), was con-

ducted

by the

NRC staff on September

26,

1989.

The results of this evaluation

were described

in SALP Report 50-387/88-99

and 50-388/88-99.

This report was

forwarded to you on October, 13,

1989,

and was discussed

with you in a manage-

ment meeting held

on October 31,

1989 in the

NRC Region

I office in King of

Prussia,

PA.

The operation, of the Susquehanna

facility was characterized

by a strong safety

culture.

Internal

and external

communications

were noteworthy strengths.

Performance

in individual functional areas

varied

somewhat but generally remained

very strong.

Performance

in Engineering

Support

improved, while, performance

in Emergency

Preparedness

declined.

An improving trend was noted in Radiological

Controls and

a declining trend was noted in Safety Assessment/guality

Verification.

Continued strong performance

was observed

in the Security/Safeguards

area.

Your SALP response

of November 20,

1989,

has

been

reviewed

and your concerns

expressed

about our report during the October

31 meeting were addressed.

The initial SALP report was changed

to clarify the Maintenance

and Safety

Assessment/guality

Verification sections

regarding

the training of maintenance

personnel.

The Final

SALP Report is attached

as Enclosure

1.

Our letter of October

13,

1989 (Enclosure

2) forwarded the Initial SALP Report

and solicited your comments

within twenty days of the October

31 meeting.

Your letter of November 20,

1989,

in response

to the

SALP Report is attached

as Enclosure

3.

The list of

attendees

at the October 31,

1989 meeting is attached

as Enclosure

4.

The

errata

sheets listing the changes

made to the

SALP report are attached

as

Enclosure

5.

OFFICIAL RECORD

COPY

SALP/SUSCOVER

0001.0.0

9002090064

'~001."i

PGR

AGOCK Ob000387

9

PQC

01/25/90

qo'

Pennsylvania

Power

8 Light Co.

8 1 JAR 535

We believe that our meeting

and interchange

of information was beneficial

and

encourage

future meetings

between

NRC Region I and

PP&L management

to discuss

matters of mutual interest.

No reply to this letter is required.

Your actions

in response

to the

SALP

will be reviewed

as part of our ongoing inspection

program at the

Susquehanna

Steam Electric Station..

.Your cooperation

is appreciated.

Sincerely,

Wi 1 1 i am" T

RU's&l+

Regional Administrator

Enclosure:

1.

Final

SALP Report

No. 50-387/88-99;

50-388/88-99

2.

NRC Letter to PPLL, dated October

13,

1989

3.

PP8L Letter to NRC, dated

November 20,

1989

4.

List of Attendees

5.

Errata Sheets

cc w/encls:

H.

W. Keiser,

Senior Vice President

Nuclear

R.

G.

Byram, Vice President,

Nuclear Operations

H.

G. Stanley,

Plant Superintendent,

Susquehanna

A.

R. Sabol,

Manager,

Nuclear guality Assurance

J.

M. Kenny, Licensing Group Supervisor

H.

W. Hirst, Manager, Joint Generation

Projects

Department

R. J. Benich, Services

Project Manager,

General

Electric Company

Bryan A. Snapp,

Esquire Assistant

Corporate

Counsel

Herbert

D. Woodeshick;

Special Office of the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

K. Abraham,

PAO (21)

Commonwealth of Pennsylvania

(2)

Chairman Carr

Commissioner

Rogers

Commissioner Curtiss

Commissioner

Roberts

Commissioner

Remick

OFFICIAL RECORD

COPY

SALP/SUSCOVER

0001.1.0

01/24/90

Pennsylvania

Power 5 Light Co.

$ 1 JAN l9S0

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o enclosures)

J. Taylor,

EDO

J.

Lieberman,

OE

W. Russell,

RI

M. Knapp,

DRSS

W. Hodges

DRS

W. Kane,

DRP

J. Wiggins,

DRP

J. Linville, DRP

R. Blough,

DRP

P. Swetland,

DRP

E. Conner,

DRP

D. Holody,

ES

Meeting Attendees

RI:DRP4+ Q

Barber/rhl

01/g4/90

Swetland

01/+/90

RI: DRP

Wiggins

0 1/Qadi /90

0 1/

/90

r~

RI

RA

M rCin

01/2j/90

RI: RA

Russell

01/gg /90

OFFICIAL RECORD

COPY

SALP/SUSCOVER

0002.0.0

01/24/90