ML17156B339

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 89-135 W/Util on 890906 in King of Prussia,Pa to Discuss Use of IPE in Maint Program & Corrective Actions Taken in Response to Main Steam Line Tunnel Differential Temp Monitor Malfunctions
ML17156B339
Person / Time
Site: Susquehanna  
Issue date: 09/06/1989
From: Swetland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8909120439
Download: ML17156B339 (2)


Text

No.89-135 U.S.

NUCLEAR REGULATORY COMMISSION REGION I Licensee:

Facility:

Docket No:

NOTICE OF SIGNIFICANT LICENSEE MEETING Pennsylvania Power and Light Company Susquehanna Steam Electric Station, Units 1 and 2

50-387; 50-388 Time and Date:

Location:

1:00 p.m.,

September 6,

1989 NRC Region I, DRP Conference Room King of Prussia, PA

Purpose:

To Discuss Licensee Use of IPE in the Maintenance Program and Licensee Corrective Actions Taken in Response to Main Steam Line Tunnel Differential Temperature Monitor Mal'functions NRC Attendees:

"Licensee Attendees:

B.

S.

P.

J.

C.

W.

S.

C.

M.

R.

V.

E.

R.

D.

Boger, Acting 'Director, Division of Reactor Safety (DRS)

Collins, Deputy Director, Division of Reactor Projects (DRP)

Swetland, Chief, Reactor Projects Section 2A, DRP Durr, Chief,'ngineering
Branch, DRS
Anderson, Chief, Plant Systems
Section, DRS Butler, Project Director, Project Directorate I-2, NRR
Thadani, Project Manager, NRR
Barber, Senior Resident Inspector, DRP Coddington, Senior Project Engineer
Detamore, Supervising Engineer
Hoopes, Senior Nuclear Maintenance Engineer Kelly, Nuclear Maintenance Engineer Figard, Supervisor, Maintenance Kickline, Project Licensing Specialist Cardinale, Supervising Engineer Note: Attendance by NRC personnel at this meeting should be made known. by September 1,

1989, via telephone call to P.

D. Swetland, Region I, at FTS 8-346-5114 or Commercial (215)337-5114.

Prepared by:

Paul D. Swetland,

Chief, RPS ZA

Distribution:

J.

M. Taylor, Acting Executive Director for Operations Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B.

K. Grimes, Acting Director, Division of Reactor Inspection and Safeguards, NRR J.

Lieberman, Director, Office of Enforcement T.

E. Murley, Director, Office of Nuclear Reacto'r Regulation F. J. Miraglia, Associate Director for Inspection and Technical Assessment, NRR B. Boger, Assistant Director for Region I Reactors, NRR J.

Dyer, Regional Coordinator, EDO S.

Varga, Director, Division of Reactor Projects - I/II, NRR W. Butler, Director, Project Directorate I-2, NRR M. Thadani, -Licensing Project Manager, PD I-2, NRR Public Document Room (PDR)

Local Public Document Room (LPDR)

Commonwealth of Pennsylvania bcc:

Regional Administrator Deputv Pegional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)

J.

McGrath, RI M. Nil1er, RI Region I Receptionist, DRMA Files DRP Files Bulletin Board M. J.- DiDonato, DRP Swetland/rhl 8/Z9/89 Linvi1 le 8/g3/89