ML17156B298
| ML17156B298 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/17/1989 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17156B299 | List: |
| References | |
| NUDOCS 8908240309 | |
| Download: ML17156B298 (4) | |
See also: IR 05000387/1989023
Text
gc Cp?ZRATED
D3SXKBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:8908240309
DOC.DATE: 89/08/17
NOTARIZED: NO
DOCKET
CIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388 Susquehanna
Steam Electric Station', Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATION
BELLAMY,R.R.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
KEISER,H.W.
Power
& Light Co.
SUBJECT:
Forwards Safety Insp Repts
50-387/89-23
& 50-388/89-21
on
I
890717-20.No violate.ons noted.
D
DISTRIBUTION CODE:
IE35D
COPIES
RECEIVED:LTR g ENCL (
SIZE: P ~ /~
TITLE: Emergency Preparedness-Appraisal/Confirmatory
Action Ltr/Exercise
Rep g
NOTES:LPDR
1
cy Transcripts.
LPDR 1 cy
Transcripts.
05000387
05000388
h
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: AEOD/DOA/IRB
NRR/DREP/EPB
10
N~U QCS~STRACT
RE~LE
02
GH27DRS'S/EPRPB
RNAL: LPDR
NOTES:
COPIES
LTTR ENCL
1
1
1
1
1
1
1,
1
1
'
1
1
1
1
1
1
2
.2
RECIPIENT
ID CODE/NAME
THADANI,M
LOIS, ERASMIA
NRR/PMAS/ILRB12
OC/LFMB
RGN1
FILE
01
NRC PDR
COPIES
LTTR ENCL
,1
1
1
1
1
1
1
0
1
1
1'
D
S
h
D
TOTAL NUMBER,OF COPIES
REQUIRED:
LTTR
16
ENCL
15
Ave 17 )gag,
Docket Nos.'0-387
50-388
Power
8 Light Company
ATTN:
Nr. Harold
W. Keiser
Senior Vice President
- Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
Subject:
Inspection
Nos.
50-387/89-23
and 50-388/89-21
A routine safety inspection of your emergency
preparedness
program was conducted
by Nr. C. Gordon of this office on July 17- 20,
1989, at your Susquehanna
Steam
Electric Station,
Units
1
& 2,
Berwick,
Discussions
of our
findings were held by Hr. Gordon with Hr. Byram and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspection are described in the
NRC Region I Inspection
Report
which is
enclosed.
Within these
areas,
the
inspection
consisted
of
selective examination of procedures
and representative
records,
interviews with
personnel,
and observations
made
by the inspectors.
Within the
scope of this inspection,
no violations were identified.
No reply
to this letter is required.
Your cooperation with us in this matter is appreciated.
Sincerely,
6;c.":,nial Sgned BF
p~>~id R. Bellamy
Ronald
R. Bellamy, Chief
Facilities Radiological
Safety
and
Safeguards
Branch
Division of Radiation Safety
and Safeguards
Enclosure:
Region I Inspection
Report
Nos. 50-387/89-23
and 50-388/89-21
Power
and
Light Company
AUG
1 7
)gag
cc w/encl:
A. R. Sabol,
Hanager,
Nuclear guality Assurance
E. A. Heckman,
Licensing Group Supervisor
R.
G.
Byram, Superintendent
of Plant -
S.
B. Ungerer,
Hanager,
Joint Generation
Projects
Department
J.
D. Decker,
Nuclear Services
Hanager,
General Electric Company
B. A. Snapp,
Esquire,
Assistant
Corporate
Counsel
H.
D. Woodeshick,
Special Office of the President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Public Docket
Room
(PDR)
Local Public Docket
Room
(LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encl;
Region I Docket
Room (with concurrences)
Hanagement Assistant,
DRHA (w/o encl)
P. Swetland,
J.
Lyash,
J..Wiggins,
H. Thadani,
J. Wiggins,
H. Kohl,
Cs
gordon
8/(+89
Conkl in
Lazarus
8/Is /89
8/ 14/89
Official Record
Copy
Bellamy
8/~q /89