ML17156B141

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-387/89-05 & 50-388/89-05 on 890205-0311.No Violations Noted.Rept Describes Review & Evaluation of Electrical Fault Associated W/Main Condensate Pump a Which Led to Manual Scram on 890207
ML17156B141
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/28/1989
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17156B142 List:
References
NUDOCS 8905100154
Download: ML17156B141 (4)


See also: IR 05000387/1989005

Text

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR ENCL ~~ SIZE

TITLE: General

(50 Dkt)-Insp Rept/Notice of VioTation Response

S

05000387

05000388j

NOTES:LPDR

1

cy Transcripts.

LPDR 1 cy

Transcripts.

A.C CELE PATED

D1STKB t '~ O~

DE M04 iTRXT104

SYSTEM

j

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I

"ESSION NBR:8905100154

DOC.DATE: 89/04/28

NOTARIZED: NO

DOCKET

ACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

05000387

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

AUTH.NAME

AUTHOR AFFILIATION

WIGGINS,J.T.

Region 1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

KEISER,H.W.

Pennsylvania

Power

& Light Co.

SUBJECT:

Forwards Safety Insp Repts 50-387/89-05

& 50-388/89-05

on

890205-0311.No violations noted.

I

gP/I

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/DEIIB

DEDRO

NRR/DEST DIR

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS2

RGN1

FILE

01

EXTERNAL:, LPDR

""NSIC

NOTES:

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1"

1

1

1

1

1

1

2

2

RECIPIENT

ID CODE/NAME

THADANI,M

AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DLPQ/PEB 11

NRR/DOEA DIR ll

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE

'

,J

G FIL

02

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

NOrE lO ALL RIDE

RECIPZZVIS.

PLEASE HELP US 'IO REZXJCE WASTE.'XNI'ACI'IHE DOQ3MEÃZ CONTROL DESK,

ROCK Pl-37

(EXT. 20079)

KO ELIZA!PE YOUR NME PBCH DISTIGBUTION

LXSTS FOR DOCUMENTS YOU DQNiT NEZDt

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

28

ENCL

28

APR 2 8 t989

Docket Nos.

50-387

50-388

Pennsylvania

Power

and Light Company

ATTN:

Mr. Harold W. Keiser

Senior Vice President

Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

NRC Region I Combined Inspection

Inspection

Report

Nos.

50-387/89-05

and 50-388/89-05

This refers

to the

routine safety

inspection

conducted

by inspectors

of this

office on February

5,

1989 - March 11,

1989,

at the Susquehanna

Steam Electric

Station,

Salem

Township,

Pennsylvania.

The

results

are

documented

in

the

enclosed

inspection

report.

The inspection

covered

plant operations,

surveil-

-lance

and

maintenance

activities for both units.

At the

conclusion

of

the

inspection,

Mr. J. Stair

summarized

the inspection

findings to Mr. G. Stanley

and other members of your staff.

The enclosed

report also describes

the review and evaluation of the electrical

fault associated

with the 'A'ain condensate

pump which led to a manual scram

of Unit

1

on

February

7.

Although

no adverse

safety

impact resulted,

we con-

sidered

the

event to

be operationally significant.

Our inspection

determined

that

operating

personnel

were

responsive

in that

they properly

assessed

the

unique circumstances

and took the appropriate

corrective actions.

Involvement

of your engineering staff to aid in troubleshooting

and development of a repair

program

was

notable.

We

also

noted

a

strong

involvement

by

management

to

ensure

that

a

comprehensive

evaluation

of the

event

was

performed

prior

to

returning the unit to service.

Your cooperation with us is appreciated.

Sincerely,

Mgbat Signed Rv

James

T. Wiggins, Chief

Reactor Projects

Branch

No.

3

OFFICIAL RECORD

COPY CIR SUS 89-05

0001.0.0

04/15/89

8905100154

85'0428

PDR

ADOCK 050003S7

9

PDC

Pennsylvania

Power and Light Company

2

~~R ~ S ~use

Enclosures:

1.

Combined

NRC Region

I Inspection

Report

Nos 50-387/89-05

and 50-388/89-05

2.

Attachment

1, Simple

One Line Electrical

Diagram

3.

Attachment 2,

Common Engineering

Problem List

4.

Attachment 3,

Licensee

Presentation

Slides for NRC/PPEL Meeting of

February 9,

1989

cc w/encls:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

E. A. Heckman,

Licensing Group Supervisor

R.

G. Byram, Superintendent

of Plant -

SSES

S.

B. Ungerer,

Manager, Joint Generation

Projects

Department, Atlantic Electric

J.

S. Decker, Services

Project Manager,

General Electric

Company

'.

A. Snapp,

Esquire, Assistant

Corporate

Counsel

H;

D. Woodeshick,

Special Office of the President

J.

C. Tilton III, Allegheny Electric Cooperative,

Inc.

Public Document

Room (PDR)

Local Pub'~c

Document

Room (LPDR)

Nuclear S'::ety In "ormation Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encls:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

J, Wiggins,

DRP

R. Blough,

DRP

J

~

Lyash,

DRP

M, Kohl,

DRP

S. Barber,

RI

Millstone

R. Bores,

DRSS

C. Anderson,

DRS (See

Paragraphs

4.2 and 5)

R. Mathew,

DRS

A. Della Greca,

DRS

RI: DRP

FYoung/mjd

04/~~/89

RI: DRP

RBlough

04/~89

gQ

RS

CA

rson

0487/8

I:DRP

Wiggins

osxgise

OFFICIAL RECORD

COPY CIR SUS 89-05 - 0002.0.0

04/15/89