Documents Results of 890215 Mgt Meeting Re Current Self Assessment of Company Functions for Planning Into 1990s.List of Attendees Encl
ML17156B104
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/28/1989
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 8904140403
Download: ML17156B104 (4)


Text

ACCELE PATED D1~Bt 'TALON DKMOYSTP0'.i SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8904140403 DOC.DATE: 89/03/28 NOTARIZED: NO FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva AUTH.NAME AUTHOR AFFILIATION GALLO,R.M.

Region 1, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION KEISER,H.W.

Pennsylvania Power

& Light Co.

SUBJECT:

Documents results of 890215 mgt meeting re current self assessment of company functions for planning into 1990s.

DISTRIBUTION CODE:

IE45D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Summary of Significant Meeting with Licensee (P rt 50)

NOTES:LPDR 1

cy Transcripts.

LPDR 1 cy Transcripts.

DOCKET 05000387 05000388 S

05000387 05000388/

RECIPIENT ID CODE/NAME PDl-2 LA INTERNAL: AEOD/DOA DEDRO NRR/DREP/EPB 10 NUDOCS-ABSTRACT G F 02 R

1 FILE 01 EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 RECIPIENT ID CODE/NAME THADANI,M AEOD/DSP/TPAB NRR/DLPQ/QAB 10 NRR/PMAS/ILRB12 OGC/ROED RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 R

D S/

NazE K) ALL aIDs REczpIENzs.

PLEASE HELP US TO REDUCE WASTE!

CGNZACZ 'IHE DOCUMENT'Z CONZROL DESK, BOCA Pl-37 (EXT. 20079)

TO EZiQQ2iATE KXJR NAME PBCH DISTRZK2ZIGN LISTS FOR DOCUMENIS YOU DON'T NEED.'

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL 17

~pR RECII~

io Cy I

~O

+%*44 UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALEROAD KING OF PRUSSIA, PENNSYLVANIA19406 March 28, 1989 Docket Hos. 50-387 50-388 Pennsylvania Power 5 Light Company-ATTN:

Hr. Harold W. Keiser Senior Yice President - Nuclear 2 North Ninth Street Al1 entown, Pennsyl vani a 18101 Gentlemen:

Subject:

(management meeting Requested By Pennsylvania Power and Light Company This letter documents the results of the subject meeting between ter.

A. Sabol and other members of your staff and Nr.

R. Gallo and other members of the NRC staff at our Region I office, King of Prussia, PA on February 15, 1989.

The

-meeting was held at the request of your staff and public notice for the meeting was given January 31, 1989.

Attendees are listed in Enclosure 1.

The purpose of the meeting was to discuss your current self assessment of company functions for planning into the 1990s and for your staff to discern future initiatives and expectations from the NRC.

No commitments were sought or made by either staff.

Your staff presented the current status of a self assessment program which is being performed by your Nuclear guality Assurance Department (NgA).

This self assessment consisted of interviews with PP8L N(A personnel and other staff to get their opinions on company good and bad points,

trends, process improve-
ments, new initiatives, and motivational and demotivational activities.

This self assessment was an initiative directed by company management to improve company competitiveness and plant safety.

We understand that these interviews have been completed and the results are being analyzed.

A. report on the survey results and recommendations for. changes is expected to be completed by mid April 1989.

In addition, we understand that l1r.

C.

Heyers is planning a

similar self assessment of the entire PP8L Nuclear Department which is expected to be completed by April 1990.

Our staff presented a synopsis of current policy and planned future initiatives in the areas of nuclear power plant maintenance, engineering

support, gA and gC oversight, use of commercial grade materials in safety related
systems, and NRC inspection activities.

The information was presented to you in order to improve plant safety.

All information discussed by our staff is currently available in the public docket.

We believe that this meeting was beneficial to both PP8L and the HRC.

3904140403 890328 PDR ADOCK 05000387 P

PDC OFFICIAL RECORD COPY

Pennsylvania Power 8 Light Co.

Your self assessment program shows initiative and we would be interested in knowing the final results.

The interchange of ideas between our staffs should contribute to overall plant safety.

Sincerely, RQBEAT f~'L GALLQ Robert M. Gallo, Chief Operations Branch Division of Reactor Safety

Enclosure:

Meeting Attendees cc w/enclosure:

A. R. Sabol,

Manager, Nuclear guality Assurance E. A. Heckman, Licensing Group Supervisor R.

G. Bryam, Superintendent of Plant-SSES S.

B. Ungerer, Manager, Joint Generation Projects Department J.

D. Decker, Nuclear Services

Manager, General Electric Co.

B. A. Snapp,

Esquire, Assistant Corporate Counsel H. D. Woodeshick, Special Office of the President J.

C. Tilton, III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bcc w/enclosure:

Region I Docket Room (with concurrences)

Management Assistant, DRMA DRP Section Chief R. Bores, DRSS W. Kane, DPP R.

B lough, DRP J. Wiggins, DRP F.

Young DRP S. Barber, DRP N. Blumberg, DRS A. Finkel, DRS G. Napuda, DRS R. Winters, DRS Y. Hsii, DRS J. Durr, DRS R. Gallo, DRS M. Thadani, NRR

DRS Blumberg/djh G~

3/q /89 3ygy89 OFFICIAL RECORD COPY

ENCLOSURE l ATTENDEES Pennsylvania Power and Li ht Com any W. Barberich, Supervisor, Nuclear Planning and Licensing Services C. Meyers,

Manager, Nuclear Projects T. Oldenhage, Senior Project Engineer-NgA A. Sabol,
Manager, Nuclear guality Assurance U. S. Nuclear Re ulatory Commission R. Gallo, Chief, Operations
Branch, DRS N. Blumberg, Chief, Operational Programs Section, Operations
Branch, DRS A. Finkel, Senior Reactor Engineer,
OPS, OB, DRS G. Napuda, Senior Reactor Engineer,
OPS, OB, DRS Y. Hsii, Acting Chief, Special Test Programs
Section, DRS R. Winters, Senior Reactor Engineer, Materials and Processes
Section, Engineering
Branch, DRS A.

Blough.

Chief, Reactor Projects Section 3B, Division of Reactor Projects