Responds to Proposing Alternate Method of Control Room Indication of Substitution of Fifth (E) Diesel Generator for Any Other Diesel Generator (A,B,C or D).Use of Alternate Method Acceptable
ML17156B006
Person / Time
Site: Susquehanna  
Issue date: 01/31/1989
From: Thadani M
Office of Nuclear Reactor Regulation
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
References
TAC-60923, TAC-60924, NUDOCS 8902030206
Download: ML17156B006 (4)


Text

January 31, 1989 Docket Nos. 50-387/388 Mr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsyl vania 18101 DISTRIBUTION Local PDR GLainas WButler MThadani OGC BGrimes NRC PDR PDI-2 Rdg.

BBoger MO'Brien JStone EJordan ACRS (10)

Dear Mr. Keiser:

SUBJECT:

FIFTH DIESEL GENERATOR (TAC NOS. 60923 AND 60924)

RE:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 This is in response to your letter dated March 24, 1988.

In that letter you proposed an alternate method of control room indication of substitution of the fifth (E) diesel generator for any other diesel generator (A, B, C, or D).

Your alternate method will consist of administrative procedures including the use of magnetic tags indicating E diesel generator substitution.

You indicated that your commitment to modify the design of the control room annunciators to provide separate indications would cost

$530,000.

You considered such a cost to be excessive, and would therefore prefer to use the administrative method of providing control room indication of E diesel generator substitution.

Our primary objective in requiring a control room indication was to assure that the control room operators will have the information needed to dispatch personnel to the proper diesel generator, in the event of a,trouble.

Since your administrative procedures were previously approved by the staff and will adequately achieve the staff's objectives, we have no objection to the revision proposed in your March 24, 1988 letter.

I Sincerely,

/S/,

I Mohan C. Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects I/II

'ffice of Nuclear Reactor Regulation CC:

See next page LHWKEISER1 48M MThadani:mr

~ /g(/89 PDI-2/D WButler

/g(/8

-oi 8902030206 890l3l PDR ADOCK 05000387 P

PDC

~,

~

~

~

t Hj.

444*44 $

~

'fe WI ef IH 4'

fe

~ ft I 4, H

He ft I

F gl 4 IW I

H 4 lj 4 ~

.h 4>> ~

4 H FFH>>4 Hh r

4 h

~

FII 44 4

4 4'I I ah 4

4

~

4th I' flail f

I, la te I'

,WY

, 4',

ihjt att p

~ Njr'

~ 4

',tjt,jl I

'4 Fll>>

I 'I Wl 4

WHFNI 4

II I

r ~ N I

4 4

ti Il't I Nt 4 It F

)HI t tr Hatt Itt Tif I

~ ~

f hl H

i all f

~ F 4 fl 4 I lt II FF 4

II

,Ia att t.

4 F-

~ Nt 4

4'4'Ijt f i

l N

II IN ',

ll I 4

, ati ff a>>

lt

~

'4 4

4

>>la.',

+all J

4 f 4

It'l Qg,'t N. ~

Fl I a

4 iw,'g, I

Fh 4

T

+

H Ft

,ef, l.

4 4

~ Ftt lt 4

4

~g REoy P0 Cy ClO X

o Cp

/P o~

+a*++

t UNITED STATES t NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 31, 1989 Docket Nos. 50-387/388 Mr. Harold M. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101

Dear Mr. Keiser:

SUBJECT:

FIFTH DIESEL GENERATOR (TAC NOS.

60923 AND 60924)

RE:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 This is in response to your letter dated March 24, 1988.

In that letter you proposed an alternate method of control room indication of substitution of the fifth (E) diesel generator for any other diesel generator (A, B, C, or D).

Your alternate method will consist of administrative procedures including the use of magnetic taas indicating E diesel generator substitution.

You indicated that your commitment to modify the design of the control room annunciators to provide separate indications would cost

$530,MO.

You considered such a cost to be excessive, and would therefore prefer to use the administrative method of providing control room indication of E diesel generator substitution.

Our primary objective in requiring a control room indication was to assure that the control room operators will have the information needed to dispatch personnel to the proper diesel generator in the event of a trouble.

Since your administrative procedures were previously approved by the staff and will adequately achieve the staff's,objectives, we have no objection to the revision proposed in your March 24, 1988 letter.

Sincerely, Mohan C. Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation CC:

See next page

Mr. Harold W. Keiser.

Pennsylvania Power 5 Light Company Susquehanna Steam Electric Station Units 1 5 2

CC:

Jay Silberg, Esq.

Shaw, Pittman, Potts 5 Trowbridge 2300 N Street N.W.

Washington, D.C.

20037 Bryan A. Snapp, Esq.

Assistant Corporate Counsel Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. E. A. Heckman Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. F. I. Young Resident Inspector P.O.

Box 35 Berwick, Pennsylvania 18603-0035 Mr. R. J.

Benich Services Project Manager General Electric Company 1000 First Avenue King of Prussia, Pennsylvania 19406 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Coorperative, Inc.

212 Locust Street P.O.

Box 1266 Harrisburg, Pennsylvania 17108-1266 Mr. W. H. Hirst, Manager Joint Generation Projects Department Atlantic Electric P.O.

Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406