MONTHYEARLR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report – Cycle 272023-04-26026 April 2023 Core Operating Limits Report – Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 2024-07-24
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARLR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments LR-N21-0024, Response to Request for Additional Information for Proposed Alternative for Examination of ASME Section XI, Examination Category 8-8, Item Number 82.11 and 82.122021-04-12012 April 2021 Response to Request for Additional Information for Proposed Alternative for Examination of ASME Section XI, Examination Category 8-8, Item Number 82.11 and 82.12 LR-N21-0031, Response to Request for Additional Information, Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report2021-04-0101 April 2021 Response to Request for Additional Information, Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N21-0019, Response to Request for Additional Information (Rai), Steam Generator Tube Inspection Report (ML20261 H589)2021-02-25025 February 2021 Response to Request for Additional Information (Rai), Steam Generator Tube Inspection Report (ML20261 H589) LR-N20-0058, Response to Request for Additional Information License Amendment Request Re Application of Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection and Pressurizer Surge Lines2020-09-16016 September 2020 Response to Request for Additional Information License Amendment Request Re Application of Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection and Pressurizer Surge Lines ML19308A5952019-11-0404 November 2019 Response to Request for Additional Information, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) LR-N19-0066, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-06-11011 June 2019 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-30030 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0112, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-20020 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0108, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-18018 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0070, Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ..2018-07-17017 July 2018 Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ... RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) LR-N17-0140, Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications (CACs MF8859 and MF8860)2017-10-18018 October 2017 Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications (CACs MF8859 and MF8860) LR-N17-0263, Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request2017-09-14014 September 2017 Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request LR-N17-0125, Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2017-08-11011 August 2017 Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors LR-N17-0115, Response to RAI Re Steam Generator Tube Inspection Report2017-08-0707 August 2017 Response to RAI Re Steam Generator Tube Inspection Report LR-N17-0118, Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications2017-08-0707 August 2017 Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications LR-N17-0102, Response to Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-12017-06-0505 June 2017 Response to Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-1 LR-N17-0091, Supplemental Information Needed for Acceptance of Requested Licensing Action Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension2017-05-0404 May 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension LR-N17-0079, Supplemental Information for Response to Request for Additional Information, Aging Management Program Plan for Reactor Vessel Internals2017-05-0303 May 2017 Supplemental Information for Response to Request for Additional Information, Aging Management Program Plan for Reactor Vessel Internals LR-N17-0001, Supplemental Information for Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals2017-01-13013 January 2017 Supplemental Information for Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals LR-N16-0226, Response to Request for Additional Information, Regarding Removing Certain Training Requirements2016-12-19019 December 2016 Response to Request for Additional Information, Regarding Removing Certain Training Requirements LR-N16-0094, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-12-0606 December 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML16305A2412016-10-31031 October 2016 Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. LR-N16-0127, Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals2016-10-0505 October 2016 Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals LR-N16-0159, Response to Request for Additional Information Regarding Chilled Water System Modifications2016-08-30030 August 2016 Response to Request for Additional Information Regarding Chilled Water System Modifications LR-N16-0153, Response to Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-0012016-08-18018 August 2016 Response to Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001 LR-N16-0134, Response to Request for Additional Information Regarding Chilled Water System Modifications2016-08-12012 August 2016 Response to Request for Additional Information Regarding Chilled Water System Modifications LR-N16-0130, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations2016-08-0202 August 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations LR-N16-0109, and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 172016-06-15015 June 2016 and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 17 LR-N16-0055, Response to Request for Additional Information Regarding Chilled Water System Modifications2016-03-31031 March 2016 Response to Request for Additional Information Regarding Chilled Water System Modifications ML16083A1942016-03-23023 March 2016 Transmittal of Response to Request for Additional Information, RAI-4, Aging Management Program Plan for Reactor Vessel Internals LR-N16-0012, Supplemental Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2016-02-10010 February 2016 Supplemental Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N15-0239, Compliance with March 12, 2012 NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Responses to Requests for Additional Information2016-01-25025 January 2016 Compliance with March 12, 2012 NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Responses to Requests for Additional Information LR-N15-0255, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..2015-12-23023 December 2015 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.. LR-N15-0235, Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (CAC Nos. MF6065 and MF6066)2015-11-27027 November 2015 Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (CAC Nos. MF6065 and MF6066) LR-N15-0224, Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)2015-11-25025 November 2015 Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) ML19031A6581997-03-30030 March 1997 03/30/1997 Letter Response to Request for Evaluation Re Refueling Accident Inside Containment ML19031A5031979-03-23023 March 1979 Generation Station, Unit 2 - Responses to Requests for Additional Information. Provides 60 Copies of Additional Seismic Qualification Information as Identified During 02/26-28/1979 Meeting ML19031A3811979-01-18018 January 1979 Response to Request for Additional Information on Quality Assurance & Subcompartment Analysis, Which Will Be Incorporated Into Fasr in Amendment to Application ML19030A6551978-08-22022 August 1978 08/22/1978 Response to Request for Additional Information Increased Capacity Spent Fuel Racks ML19031C3721978-08-0707 August 1978 08/07/1978 Letter Response to IE Bulletin No. 78-08 on Radiation Levels from Fuel Element Transfer Tubes ML19030A6651978-08-0202 August 1978 08/02/1978 Response to Request for Additional Information Diesel Generators 2024-04-26
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New ,J!lmey 08038-0236 PSECI NudearLJl:
10 CFR 50.55a LR-N17-0102 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311
Subject:
Response to Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-1
Reference:
- 1. PSEG Letter to NRC, "Request for Use of American Society of Mechanical Engineers (ASME) Code Cases N-695-1 and N-696-1,"
dated March 1, 2017 (ADAMS Accession No. ML17060A477)
- 2. NRC Letter to PSEG, "Salem Generating Station, Unit Nos. 1 and 2-Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-1 (CAC Nos. MF9348 and MF9349)," dated May 8, 2107 (ADAMS Accession No. ML17115A403)
In the Reference 1 letter, PSEG Nuclear LLC (PSEG) requested relief in accordance with 10 CFR 50.55a, "Codes and standards." In the Reference 2 letter, the U.S.
Nuclear Regulatory Commission (NRC) staff provided PSEG a Request for Additional
_Information (RAI)Jo support the NRC staff's review oUbe proposed relief request.-
The requested information is provided in Attachment 1. Attachment 2 provides a revision to the Reference 1 relief request with changes marked by revision bars.
There are no regulatory commitments contained in this letter.
JUN Qli 2017
\
LR-N17-0102 10 CFR 50.55a Page 2 Should you have any questions concerning this matter, please contact Mr. Brian Thomas at 856-339-2022.
Sincerely, Da eff!:;-
Senior Director, Regulatory Operations PSEG Nuclear LLC Attachments:
- 1. Response to Request for Additional Information
- 2. 10 CFR 50.55a Relief Request SC-14R-171 - Revised cc: Administrator, Region I, NRC NRC Senior Resident Inspector, Salem R. Ennis, Project Manager, Salem, USNRC P. Mulligan, Chief, NJBNE L. Marabella, Corporate Commitment Tracking Coordinator T. Cachaza, Salem Commitment Tracking Coordinator
LR-N17-01 02 Attachment 1 Response to Request for Additional Information
LRN17-0102 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST SC-14R-171 USE OF CODE CASES N-695-1 AND N-696-1 SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 By letter dated March 1, 2017, PSEG Nuclear LLC (PSEG or the licensee) submitted Relief Request SC-14R-171 for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. The request would authorize the use of alternatives to the depth sizing requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, Appendix VIII, Supplements 2 and 10, as modified by Code Case N-695, "Qualification Requirements for Dissimilar Metal Piping Welds," and Code Case N-696, "Qualification Requirements for Mandatory Appendix V III Piping Examinations Conducted From the Inside Surface." Specifically, the licensee proposed to use the alternative inner diameter flaw depth sizing root mean square error criteria in ASME Code Cases N-695-1, "Qualification Requirements for Dissimilar Metal Piping Welds," and N-696-1, "Qualification Requirements for Mandatory Appendix VIII Piping Examinations Conducted from the Inside Surface," for performance demonstration of the ultrasonic testing at Salem, Unit Nos. 1 and 2.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the application and, based upon this review, determined that the following additional information is needed to complete the review:
- 1. The March 1, 2017, submittal proposes to use the procedures in ASME Code Cases N-695-1 and 696-1 as an alternative to the root mean square error criteria of Code Cases N-695 and N-696. The NRC staff notes that in the 2015 ASME Code, "Code Cases, Nuclear Components," the Applicability Index for Section XI Cases has limited the use of Code Cases N-695 and N-696 to the 2003 Addenda, or earlier editions and addenda of the Code.
Given that Code Cases N-695 and N-696 are not applicable -for Salem's current code ofrecord (2004 Edition wlfh no addenda), it is not clear to the NRG staff 1
that regulatory authority exists under Title 10 of the Code of Federal Regulations 50.55a(z) to authorize the proposed alternative. However, the NRC staff notes that Code Cases N-695 and N-696 provide alternatives to ASME Code,Section XI, Appendix VIII, Supplements 2, 10, and/or 14, and that regulatory authority does exist to authorize the use of N-695-1 and N-696-1 as an alternative to the ASME Code,Section XI, Appendix VIII, requirements.
Please revise the request to reflect this issue or provide justification as to why modifying the request is not required.
Page 1 of 2
LR-N17-0102 PSEG Response:
Attachment 2 contains a revised request for relief stating that PSEG is requesting relief from ASME Section XI, Appendix VIII, Supplements 2 and 10. Changes to the original relief request are identified by revision bars in Attachment 2.
- 2. The NRC staff notes that the tables in Section 1 of the March 1, 2017, submittal list all eight (four hot leg and four cold leg ) reactor pressure vessel nozzle to safe end dissimilar metal welds for each unit, and four reactor pressure vessel safe end to pipe austenitic welds for each unit.
In addition to the dissimilar metal welds, does this relief request also include all eight ( four hot leg and four cold leg ) reactor pressure vessel safe end to pipe austenitic welds for each unit? Please explain.
PSEG Response:
The eight cold leg safe end austenitic welds ( four on each Salem unit) are not included in the request for relief. The eight cold leg safe end welds contain austenitic stainless steel safe ends which are welded to cast austenitic stainless steel ( CASS ) elbows. These eight welds have limited examination coverage due to the CASS elbow ultrasonic properties; therefore, these eight welds are not currently scheduled for examination during the fourth lnservice Inspection 10 year intervals.
Page 2 of 2
LR-N17-0102 Attachment 2 10 CFR 50.55a Relief Request SC-14R-171 - Revised LR-N17-0102 Salem Generating Station Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311 10 CFR 50.55a Request SC-14R-171 Hardship in Accordance with 10 CFR 50.55a(z)(2)
Hardship without a Compensating Increase in Quality and Safety
- 1. ASME Code Component(s) Affected Code Class: 1 Examination Category: Code Case N-770-1 and R-A Item Number: Inspection Items B, D, E and R1.20
Description:
Reactor Pressure Vessel (RPV)
Nozzle to Safe End Alloy 600 Welds and Safe End to Stainless Steel Pipe welds:
Unit 1 Welds ASME ASME Nominal Component ID Category Item Description Thickness 27.5-RC-1110-5 N-770-1 D NOZZLE TO SAFE-END (RPV-CL) 2.5in 27.5-RC-1120-5 N-770-1 D NOZZLE TO SAFE-END (RPV-CL) 2.5in 27.5-RC-1130-5 N-770-1 D NOZZLE TO SAFE-END (RPV-CL) 2.5in 27.5-RC-1140-5 N-770-1 D NOZZLE TO SAFE-END (RPV-CL) 2.5in 29-RC-1110-1 N-770-1 D NOZZLE TO SAFE-END (RPV-HL) 2.5in 29-RC-1120-1 N-770-1 D NOZZLE TO SAFE-END (RPV-HL) 2.5in 29-RC-1130-1 N-770-1 D NOZZLE TO SAFE-END (RPV-HL) 2.5in 29-RC-1140-1 N-770-1 E NOZZLE TO SAFE-END (RPV-HL) 2.5in 29-RC-1110-2 R-A R1.20 SAFE-END TO PIPE 2.5in 29-RC-1120-2 R-A R1.20 SAFE-END TO PIPE 2.5in 29-RC-1130-2 R-A R1.20 SAFE-END TO PIPE 2.5in 29-RC-1140-2 R-A R1.20 SAFE-END TO PIPE 2.5in Page 1 of 7 LR-N17-0102 Unit 2 Welds*
ASME ASME Nominal Component ID Category Item Description Thickness 27.5-RC-1210-5 N-770-1 B NOZZLE TO SAFE-END (RPV-CL) 2.5in 27.5-RC-1220-5 N-770-1 B NOZZLE TO SAFE-END (RPV-CL) 2.5in 27.5-RC-1 230-5 N-770-1 B NOZZLE TO SAFE-END (RPV-CL) 2.5in 27.5-RC-1240-5 N-770-1 B NOZZLE TO SAFE-END (RPV-CL) 2.5in 29-RC-1 21 0-1 N-770-1 D NOZZLE TO SAFE-END (RPV-HL) 2.5in 29-RC-1220-1 N-770-1 D NOZZLE TO SAFE-END (RPV-HL) 2.5in 29-RC-1 230-1 N-770-1 D NOZZLE TO SAFE-END (RPV-HL) 2.5in 29-RC-1 240-1 N-770-1 D NOZZLE TO SAFE-END (RPV-HL) 2.5in 29-RC-121 0-2 R-A R1.20 SAFE-END TO PIPE 2.5in 29-RC-1220-2 R-A R1.20 SAFE-END TO PIPE 2.5in 29-RC-1230-2 R-A R1 .20 *SAFE-END TO PIPE 2.5in 29-RC-1 240-2 R-A R1 .20 SAFE-END TO PIPE 2.5in
2. Applicable Code Edition and Addenda
The American Society for Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI, "Rules for lnservice Inspection and Testing of Components of Light-Water Cooled Plants," Code* of record for Salem Units 1 and 2 lnservice Inspection (lSI) Fourth Intervals is the 2004 Edition with no Addenda.
The Salem Unit 1 Fourth lSI Interval began on May 20, 2011, and is scheduled to end on December 31, 2020, and the Salem Unit 2 Fourth lSI Interval began on November 27, 2013, and is scheduled to end on December 31, 2021.
3. Applicable Code Requirement
Code Case N-770-1 as referenced in 10 CFR 50.55a (g)(6)(ii)(F) stipulates ultrasonic examination of dissimilar metal welds fabricated fromAIIoy-82/182-material. These requirements apply to the Salem Unit 1 and Unit 2 reactor pressure vessel (RPV) nozzle to safe-end welds and Risk-Informed Examination Category R-A, Item R1.20 (formerly Code Category 8-J, 89.11) for the associated RPV safe-end to piping welds that are fabricated with stainless steel weld material.
All of the specified ultrasonic examinations (UT) are to be conducted per Appendix VIII Supplements 2 (wrought austenitic welds) and 10 (dissimilar metal welds). Supplement 2 paragraph 3.2(b) states, "The RMS error of the flaw depths estimated by ultrasonics, as compared with the true depths, shall Page 2 of 7 LR-N17-0102 not exceed 0.125 in. (3 mm)," Supplement 10 paragraph 3.3(c) states, "Examination procedures, equipment, and personnel are qualified for depth sizing when the RMS error of the flaw depth measurements, as compared to the true flaw depths, do not exceed 0.125 in. (3 mm)."
- 4. Reason for Request PSEG is requesting to utilize Code Cases N-695-1 and N-696-1 which requires a 0.250 in. root mean square error (RMSE) depth sizing accuracy whereas the requirements in Supplements 2 and 10 require a 0.125 in. RMSE depth sizing accuracy. To date, although examination vendors have qualified for detection and length sizing in accordance with the ASME Section XI Appendix V III requirements for examinations from the inside diameter (10),
the vendors have not met the established RMSE of 0.125 in. for depth sizing despite numerous attempts. Consequently, relief from the Supplement 2 and 10 specified 0.125 in. RMSE depth sizing accuracy requirements is necessary to support evaluation of findings from examinations when conducted from the inside surface. This relief is being requested in accordance with 10 CFR 50.55a(z)(2) as a hardship without a compensating increase in quality and safety.
Most recent UT examinations of the RPV nozzle to safe-end dissimilar metal and safe-end to pipe welds have been performed from the outside surface (OD) of the piping at Salem Unit 1 and Unit 2. Access to the 00 of these welds is inside a "sandbox" which was installed during original plant construction after all welding was completed. Although these examinations can be performed from the OD of the RPV nozzles, these inspection activities would result in the unnecessary personnel radiation exposure for the personnel performing these examinations without a compensating increase in quality or safety as discussed below as compared to performing these examinations from the inside surface (10) of the piping. Therefore Salem station has changed the examination for the welds identified in this relief request from performing the inspection from the 00 to performing them from the ID to minimize personnel radiation exposure.
Based upon a review of dose records for similar RPV Cold leg nozzle to safe-end weld volumetric UT examinations (Code Case N-770-1 item B welds) performed from the OD for the most recent lnservice inspections at Salem Unit 2, the dose exposure to personnel performing the NDE of 4 RPV Cold Leg weld UT examinations was approximately 3.5 REM. This is a conservative estimate of the personnel exposure since it does include any additional dose received by supporting organizations (i.e., maintenance, radiation protection). Performing the examinations from the ID during refueling outages also reduces the overall exposure of the weld examinations since this examination technique is performed remotely and does not require personnel to access the exterior 'sandbox' area of the RPV.
Page 3 of 7 LR-N17-0102 PSEG believes that volumetric UT examination of all noted 24 welds (12 per unit) from the OD surface would create a hardship in that personnel would unnecessarily receive additional radiation exposure, in the order of over 21 REM without an increase in quality or safety as discussed above.
- 5. Proposed Alternative and Basis for Use 10 CFR 50.55a(z)states:
Alternatives to codes and standards requirements. Alternatives to the requirements of paragraphs (b) through (h) of this section or portions thereof may be used when authorized by the Director, Office of Nuclear Reactor Regulation, or Director, Office of New Reactors, as appropriate. A proposed alternative must be submitted and authorized prior to implementation. The applicant or licensee must demonstrate that:
(1) Acceptable level of quality and safety. The proposed alternative would provide an acceptable level of quality and safety; or (2) 1-/ardship without a compensating increase in quality and safety.
Compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
This relief is being requested in accordance with 10 CFR 50.55a(z)(2) as a hardship without a compensating increase in quality and safety .
As discussed in section 4, Salem station has changed the examination for the welds identified in this relief request from performing the examinations from the OD to performing them from the ID to minimize personnel radiation exposure.
To date, although examination vendors have qualified for detection and length sizing in accordance with the ASME Section_ XI AppendixYIILrequirere n nts for examinations from the ID, the vendors have not met the established RMSE of 0.125 in. for depth sizing despite numerous attempts. Consequently, relief from the Supplement 2 and 10 specified 0 .125 in. RMSE depth sizing accuracy requirements is necessary to support evaluation of findings from examinations when conducted from the ID.
PSEG is requesting to utilize Code Cases N-695-1 and N-696-1. Paragraph 3.3(d) of Code Case N-695-1 states:
Page 4 of 7 LR-N17-0102 For qualifications from the inside-surface, examination procedures, equipment, and personnel are qualified for depth sizing if the RMS error of the flaw depth measurements, as compared to the true flaw depths, does not exceed 0.125 in (3mm) for piping less than 2.1 in. (54 mm) in thickness, or 0.250 in. (6mm) for piping 2.1 in. (54 mm) or greater in thickness.
Paragraph 3.3(c) of Code Case N-695-1 states:
Supplement 2 examination procedures, equipment, and personnel are qualified for depth-sizing if the RMS error of the flaw depth measurements as compared to the true flaw depths, does not exceed 0.125 in. (3mm) for piping less than 2.1 in (54 mm) in thickness, or 0.250 in. (6mm) for piping 2.1 in. (54 mm) or greater in thickness, when they are combined with a successful Supplement 10 qualification.
All welds included in this request were most recently UT examined from the OD with an Appendix VIII qualified detection process and length sizing in the previous refueling outages. Greater than 90 percent coverage of the required examination areas was achieved in all cases. Prior examination history when examinations were performed from ID confirms that the inside surface profiles of the welds included in this request are suitable for ultrasonic examination.
The Salem Unit 1 and Unit 2 RPV nozzle to safe-end and safe-end to piping welds will be examined from the ID using personnel, procedures and equipment qualified by demonstration in all aspects. PSEG proposes to use a vendor qualified for ID detection and length sizing per Appendix VIII as applicable to the welds included in this request. Depth sizing qualification will meet the requirements of ASME Code Cases N-695-1 and N-696-1.
In the approval of the precedent relief requests listed in Section 7 of this attachment, the NRC safety evaluations identified the need for special treatment of flaws connected to the inside surface and are measured to be more than 50 percent through the wall thickness.
_ lf a reportable flaw is detectedan _ jned tp be ID surtace_con_necied
_ d determ _ _
during examination of the welds in accordance with this relief request, PSEG will provide a flaw evaluation including the measured flaw size as determined by ultrasonic examination for NRC review. Eddy current testing will be used to determine if flaws are surface connected. Additional data including details of the impracticable surrounding ID surface contour in the region of the flaw and percentage of the examination area where ultrasonic testing (UT) probe lift-off is evident, if any, will be included.
Indications requiring depth sizing during examination of welds in accordance with this relief request will be treated as discussed below:
Page 5 of 7 LR-N17-0102
- Flaws detected and measured as less than 50 percent through-wall will be sized in accordance the personnel, procedures and equipment qualified to meet the requirements of ASME Code Cases N-695-1 and N-696-1
- For flaws detected and measured as 50 percent through-wall depth or greater and to remain in service without mitigation or repair, PSEG will submit flaw evaluation(s) for review and approval prior to reactor startup. The flaw evaluation will include:
- 1. Information concerning the mechanism that caused the flaw.
- 2. Information concerning the inside surface roughness and/or profile of the region surrounding the flaw in the examined piping weld.
- 3. Information concerning areas where UT probe lift-off is observed, if any.
All other ASME Code,Section XI requirements for which relief was not specifically requested apply including the third party review by the Authorized Nuclear lnservice Inspector.
- 6. Duration of Proposed Alternative The duration of the request for proposed alternative for Salem Unit 1 is through the end of the fourth interval currently scheduled to end on 12/31/2020; and for Salem Unit 2, the duration is through the end of the fourth interval currently scheduled to end on 12/31/2021.
- 7. Precedents Similar relief requests have been previously approved for relief from the 0.125 RMSE requirement for the following plants:
(1) NRC letter to Entergy letter, "Arkansas Nuclear One, Unit 1 -Relief Request No. AN01-ISI-025, Relief from Amerian Society of Mechanical EngineersSection XI Table IWB-2500-1 Requirements (CAC No.
MF7625)," dated August 29, 2016 (ADAMS Accession No. ML16237A082)
(2) NRC Letter to Pacific Gas and Electric Company, "Diablo Canyon Power Plant, Unit No. 2 - lnservice Inspection Program Relief Request NDE RCS-SE-2R19, Associated with the Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer (CAC No. MF5348)," dated November 4, 2015 (ADAMS Accession No. ML15299A034)
Page 6 of 7 LR-N17-0102 (3) NRC Letter to Duke Energy Carolinas, "Catawba Nuclear Station, Unit 1:
Proposed Relief Request 14-CN-003, American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code), Code Case N-695 (CAC NO. MF5447)," dated October 26, 2015 (ADAMS Accession No. ML15286A326)
- 8. Reference
- 1) Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 17 dated August 2014.
- 2) Code Case N-770-1, "Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities,Section XI, Division 1" .
3 ) Code Case N-695-1, "Qualification Requirements for Dissimilar Metal Welds,Section XI, Division 1," approved December 31, 2014
- 4) Code Case N-696-1, "Qualification Requirements for Mandatory Appendix VIII Piping Examinations Conducted From the Inside Surface,Section XI, Division 1 ," approved May 7, 2014.
Page 7 of 7