ML17156A720

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-387/88-11 & 50-388/88-14 on 880605-0702
ML17156A720
Person / Time
Site: Susquehanna  
Issue date: 08/03/1988
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17156A721 List:
References
NUDOCS 8808150332
Download: ML17156A720 (3)


See also: IR 05000387/1988011

Text

ACCELERATED

DISTRIBUTION

DEMONSTR~~ON

gySTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8808150332

DOC. DATE: 88/08/03

NOTARIZED: NO

FACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

AUTH.NAME

AUTHOR AFFILIATION

WIGGINS,J.T.

Region 1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

KEISER,H.W.

Pennsylvania

Power

& Light Co.

DOCKET

05000387

05000388

D

05000387

05000388

S

A

NOTES:LPDR

2 cys Transcripts.

LPDR 2 cys Transcripts.

RECIPIENT

ID CODE/NAME

PD1-2

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

THADANI,M

COPIES

LTTR ENCL

2

2

SUBJECT:

Forwards Safety Insp Repts 50-387/88-11

& 50-388/88-14

on

880605-0702.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

(

ENCL /

SIZE: 3 + I

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

- Rc:HEBE, J

REG WL

02

DSR

DEPY'XTERNAL:

LPDR

NSIC

NOTES:

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

2

2

1

1

2

2

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS2

RES/DSIR

DEPY

RGNl

FILE

Ol

NRC PDR

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

D

A

P

D

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

29

ENCL

29

~"~ 08 1988

Docket Nos.

50-387

50-388

Pennsylvania

Power 4 Light Company

ATTN:

Mr. H.

W. Keiser

Senior Vice President

Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

50-387/88-11;

50-388/88-14

This refers

to

the

routine safety

inspection

conducted

by inspectors

of this

office

on

June

5,

1988

- July 2,

1988,

at

the

Susquehanna

Steam

Electric

Station,

Salem

Township,

Pennsylvania.

The

results

are

documented

in

the

enclosed

inspection

report.

The inspection

covered plant operations

for both

units,

survei llance,

maintenance,

startup

and

licensee

events.

At the

con-

clusion

of the inspection,

Mr. F.

Young

summarized

the inspection

findings to

Mr. R.

Byram and other members of your staff.

Your cooperation with us is appreciated.

Sincerely,

~,g~ Qf@584 DÃe

James

T. Wiggins, Chief

Reactor Projects

Branch

No.

3

Enclosure:

Combined

NRC Inspection

Report 50-387/88-11;

50-388/88-14

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

E. A. Heckman,

Licensing Group Supervisor

R.

G. Byram, Superintendent

of Plant - SSES

W.

H. Hirst, Manager, Joint Generation

Projects

Department, Atlantic Electric

R. J. Benich, Services Project Manager,

General Electric Company

B. A. Snapp,

Esquire, Assistant Corporate

Counsel

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton III, Allegheny Electric Cooperative,

Inc.

Public Document

Room (PDR)

Local Public Document'oom

(LPDR)

Nuclear. Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

8808l50332

880803

PDR

ADOCK 05000387

PDC

OFFICIAL RECORD

COPY

IR SUS 88-11 - 0001.0.0

08/02/88

Pennsylvania

Power 5 Light Company

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

J. Wiggins,

DRP

R. Blough,

DRP

L. Doerflein,

DRP

M. Kohl,

DRP

R. Bores,

DRSS

M. Thadani,

NRR

E. Baker,

NRR:RUIB (See

Paragraph

2.3)

<"~ ~3 tSSg

~-,G

RI:DRP

SYoung/mdd

8/3 /88

RI: DRP

RBlough

8/QI88

OFFICIAL RECORD

COPY

I:DRP

JWiggins

8/Q/88

IR SUS 88-11 - 0002.0.0

08/02/88