ML17156A691
| ML17156A691 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/15/1988 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| References | |
| NUDOCS 8808010165 | |
| Download: ML17156A691 (5) | |
See also: IR 05000387/1987019
Text
, ACCEIZRATED
DIP?'RIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8808010165
DOC.DATE: 88/07/15
NOTARIZED: NO
DOCKET ¹
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
UTH.NAME
AUTHOR AFFILIATION
ELLAMY,R.R.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT. AFFILIATION
KEISER,H.W.
Power
& Light Co.
SUBJECT:
Ack receipt of 880615 ltr informing NRC of steps
taken to
R
correct violations noted
on listed insp repts.
I
DISTRIBUTION CODE:
IE06D
COPIES
RECEIVED:LTR i
ENCL Q
SIZE:
cled
TITLE: Environ
& Radiological
(50 DKT)-Insp Rept/Notice of Violation Response
NOTES:LPDR
2 cys Transcripts.
05000387 8
LPDR
2 cys Transcripts.
05000388
RECIPIENT
ID CODE/NAME
PD1-2
LA
THADANIiM
INTERNAL: ACRS
AEOD/DSP
NMSS/SGOB
4E4
NRR/DOEA/EAB 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
C=FTBQ
0 2
RES/DSIR
DEPY
RGN2/DRSS/EPRPB
EXTERNAL: LPDR
NOTES:
COPIES
LTTR ENCL
1
0
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
2
2
RECIPIENT
ID CODE/NAME
PD1-2
AEOD/DOA
NMSS/LLOB
5E4
NRR/DLPQ/PEB
11
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OGC 15-B-18
RGN1
FILE
01
RGN4 MURRAY,B
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
.1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
29
ENCL
28
~ULNAS
mSs
Docket Nos.
50-387
50-388
Power
8 Light Company
ATTN: Hr. Harold
W. Keiser
Senior Vice President
- Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
Subject:
Combined Inspection
Report
Nos. 50-387/87-19
and 50-388/87-19
We are in receipt of your June
15, 1988 revised reply to the November 30, 1987
letter and Notice of Violation. The Notice of Violation involved assignment
of
an individual to the position of Radiological
Operations
Supervisor
who did not
meet the minimum qualification requirements
specified in your Technical
Specifications.
The corrective actions
and control measures
detailed in your revised
response
are adequate
to permit the current individual to continue in the position
until fully qualified. Adherence to these corrective actions
and control
measures will be examined during
a future inspection.
As to the proposed
date
when the individual will meet full qualification requirements,
we understand
that you will provide us with a detailed evaluation
assuring that the
individual will meet Technical Specification requirements
in this area.
Your cooperation with us is appreciated.
Sincerely,
0 l;,nal Slpned By:
}'<onald R. gellaNy
Ronald
R. Bellamy, Chief
Facilities Radiological Safety
and Safeguards
Branch
Division of Radiation Safety
and Safeguards
cc w/encl:
A.
R. Sabol,
Hanager,
Nuclear equality Assurance
E. A. Heckman,
Licensing Group Supervisor
R.
G.
Byram, Superintendent
of Plant-SSES
H.
W. Hirst, Manager, Joint Generation
Projects
Department
R. J. Benich, Services
Project Manager,
General Electric Company
B. A. Snapp,
Esquire, Assistant
Corporate
Counsel
~
~
~
~
H. D. Woodeshick,
Special Office of the President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Public Document
Room
(PDR)
Local Public Document
Room
(LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
88080iOih5 8807i5
ADOCK 05000387
PNU
Power
8 Light Company
JUL
1 g
Ig88
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
R. Blough,
L. Doerflein,
R. Bores,
DRSS
RI:DRSS
Markley
7/l'I/88
RI: DRSS
RI:
Shanbaky
Bellamy
7/~5 /88
7/]4/88
OFFICIAL RECORD
COPY