ML17156A318

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-387/85-12 & 50-388/85-12 on 850323-0505 & Notice of Violation.W/O Notice of Violation
ML17156A318
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/03/1985
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kenyon B
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17156A319 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8506100688
Download: ML17156A318 (2)


See also: IR 05000323/2005005

Text

e

Docket Nos.

50-387

50-388

Pennsylvania

Power 5 Light Company

ATTN:

Mr. Bruce

D.

Kenyon

Vice-President

Nuclear Operations

2 North Ninth Street

Al 1 entown,

Penn syl vani a

18101

Gentlemen:

JUN

3 >g85

'ubject:

Resident

Inspection

50-387/85-12;

50-388/85-12

(3/23/85

5/05/'5)

I'his

routine inspection of the

Susquehanna

Steam Electric Station covered

plant operations,

surveillance,

maintenance,

Unit

1 refueling outage,

Informa-

tion Notice Followup,

GE SIL Followup,

open

items

end licensee

events.

IThis

inspection identified that fire dampers

in the Standby

Gas Treatment

System

(SGTS) were not included in the applicable surveillance

procedure

as required.

Malfunction of these

dampers

could affect the operability of the

SGTS.

This letter also acknowledges

your January

15,

1985,

and March 27,

1985,'eplies

to the Notices of Violation forwarded, respectively,

by

NRC Region I

letters dated

December

18,

1984,

and February 21,

1985.

The correctiveIactions

described

in your reply will be evaluated

during routine

NRC

Inspection!'our

cooperation with us is appreciated.

Sincerely,

Harry B.

Kister,

Chief

Project Branch

No.

1

Division of Reactor Projects

Enclosures:

l. Appendix A, Notice of Violation

2.

Combined

NRC Inspection

Report 50-387/85-12;

50-388/85-12

pQR 'QO

P

850bioo

el% 0500o9R

b88 850b g87

8

OFFICIAL RECORD

COPY

CIR SUSQUEHANNA 85-12

-'.

11/29/80

0001.0.0

Pennsylvania

Power 5

Light Company

cc w/encls:

Norman

W. Curtis, Vice President,

Engineering

and Construction-

A.

R. Sabol,

Manager,

Nuclear Quality Assurance

W.

E. Barberich,

Manager,

Nuclear Licensing

H.

W. Keiser,

Superintendent

of Plant

William Matson, Allegheny Electric Cooperative

Anthony J. Pietrofitta, Atlantic Electric

R. J.

Benich, Services

Project Manager,

General

Electric Company

Public Document

Room

(PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

Nuclear'cc

w/encls:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

DRP Section Chief

Director,

DRS

Director,

DRSS

RI: DRP

<Jacobs

5I>> /85

Strosnider

5/go /85

Kister

5g]/85

OFFICIAL RECORD

COPY

RI: DRP

.

RP

CIR SUSQUEHANNA 85-12 -

i 0001.1.0

11/29/80