ML17156A312

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-388/85-10 on 850318-21 & 28.No Violation Noted
ML17156A312
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 05/30/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kenyon B
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17156A313 List:
References
NUDOCS 8506070283
Download: ML17156A312 (4)


See also: IR 05000388/1985010

Text

4

I

Docket No. 50-388

MAY 3 0 1983

Pennsylvania

Power 5 Light Company

ATTN:

Mr. Bruce

D. Kenyon

Vice President

Nuclear Operations

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

Report

No. 50-388/85-10

This refers to the routine safety inspection

conducted

by Mr.

D. Florek of this

offi'ce on March 18-21,

1985, at the Susquehanna

Steam Electric Station,

Unit 2,

Berwick, Pennsylvania,

of activities authorized

by

NRC License

No.

NPF-22

and

to the discussions

of our findings held by Mr. Florek with Mr. D. Thompson

and

other members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the

NRC Region I Inspec-

tion Report which is enclosed with this letter.

Within these

areas,

the inspec-

tion consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Our inspector also verified the steps

you have taken to correct the violations

and deviations

brought to your attention in letters

and enclosures

dated

December

18,

1984,

February 7,

1985

and March 4,

1985.

We have

no further ques-

tions regarding

the steps

you took to correct items 388/84-34-29

and 388/84-42-01.

With regard to item 388/84-34-03,

your interim solution was found to be accept-

able.

The long term solutions

are in process

and will be assessed

later.

With

regard to item 388/85-02-01,

your corrective actions

completed to date were

found to be acceptable.

Within the

scope of this inspection,

no violations were observed.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincer ely,

~jpilQlgil~od I

Wk.

~ Stewart

D. Ebneter,

Director

Division of Reactor Safety

Enclosure:

NRC Region I Inspection

Report

Number 50-388/85-10

8506070283

850530

~

~

r

Pennsylvania

Power

and Light Company,2

cc w/encl:

Norman

W. Curtis, Vice President,

Engineering

and Construction

Nuclear

A.

R. Sabol,

Manager,

Nuclear Quality Assurance

W.

E. Barberich,

Licensing Engineer

H.

W. Keiser,

Superintendent

of Plant

William Matson

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

a

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

J. Grant,

DRP

J. Strosnider,

Chief, Section ¹1B,

DRP

RI:DRS)YfiP

RBDD

RS

Florek/slf

ettenhausen

neter

4/gP/85

f7+/85

/9+/85

OFFICIAL RECORD

COPY

IRSUSQUEHANNA85-10 - 0002.0.0

04/02/85

l

0