Forwards IE Insp Rept 50-389/79-12 on 790813-17.No Noncompliance Noted
ML17146B288
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/28/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Urig R
FLORIDA POWER & LIGHT CO.
Shared Package
ML17146B289 List:
References
NUDOCS 7910180523
Download: ML17146B288 (4)


See also: IR 05000389/1979012

Text

':

++*++

In Reply Refer To:

RII:TEB

50-389/79-12

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,G EORG IA30303

gut; 28 1979

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by T. E. Burdette of this office

on August 13-17,

1979 of activities authorized by NRC Construction

Permit No.

CPPR-114 for the St. Iucie Nuclear Plant facility, Unit

No. 2,

and to the discussion of our findings held with B. J.

Escue at

the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector,

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

We have

examined actions

you have taken with regard to previously identi-

fied enforcement matters.

These

are discussed

in the enclosed

inspection

report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title l0,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include

a full statement of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear from you in this

regard within the specified period,

the report will be placed in the

Public Document

Room.

~ )

Florida Power and

Light Company

AUG 28 1979

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

C. E. Murphy,

Ch ef

Reactor Constructio

and

Engineering Support Branch

Enclosure:

Inspection Report No. 50-389/79-12

cc w/enclosure:

C.

M. Wethy, Plant Manager

Post Office Box 128

Ft. Pierce, Florida

33450

Nat Weems, Assistant

(}A Manager

Post Office Box 128

Ft. Pierce, Florida

33450