ML17146B186

From kanterella
Jump to navigation Jump to search
Amends 185 & 159 to Licenses NPF-14 & NPF-22,respectively, Modifying Licensee TS Surveillance Requirement 3.8.1.4 to Allow Increases in Minimum Fuel Oil Required to Be Stored in Day Tanks for Emergency DG
ML17146B186
Person / Time
Site: Susquehanna  
(NPF-14-A-185)
Issue date: 08/23/1999
From: Bajwa S
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17146B187 List:
References
NFP-22-A-159, NUDOCS 9908260209
Download: ML17146B186 (9)


Text

R R50C C~

+

0 Cy Y/

~O

++*++

UNITED STATE~

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PPRL INC.

ALLEGHENYELECTRIC COOPERATIVE INC.

DOCKET NO. 50-387 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 1 AMENDMENTTO FACILITYOPERATING LICENSE Amendment No. 185 License No. NPF-14 The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by PP&L, Inc., dated November 20, 1998, as supplemented by letter dated June 25, 1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facilitywilloperate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

'I1908260209 990823 PDR ADOCK 05000387

')','i P

PDR 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:

(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No]85and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PP8 L shall operate the facilityin accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days after its date of issuance.

FOR THE NUCLEAR REGULATORYCOMMISSION S. Singh Bajwa, Chief,Section I

Project Directorate I

Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

pugus$

23 f 999

ATTACHMENTTO LICENSE AMENDMENTNO.

1 5

FACILITYOPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages.

The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE 3.8-6 INSERT 3.8-6

SURVEILLENCE REQUIREMENTS (continued)

SURVEILLANCE AC Sources-Cperating 3.8.1 FREQUENCY SR 3.8.1.4

. Verify each engine mounted day tank fuel oil level is z 420 gallons for DG A-D and > 425 gallons for DG E.

31 days SR 3.8.1.5 Check for and remove accumulated water from each engine mounted day tank.

31 days SR 3.8. 1.6 Verify the fuel oil transfer system operates to automatically transfer fuel oil from the storage tanks to each engine mounted tank.

31 days

. 'SR 3.8.1.7

--NOTES-1.

All DG starts may be preceded by an engine prelube period.

2.

A single test at the specified Frequency will satisfy this Surveillance for both units.

Verify each DG starts from standby condition and achieves, in s 10 seconds, voltage a 3793 V and frequency a 58.8, and after steady state conditions are reached, maintains voltage a 3793 V and s 4400 V and frequency

> 58.8 Hz and c 61.2 Hz.

31 days SR 3.8.1.8


NOTE------------------------

The automatic transfer. of the unit power supply shall not be performed in MODE 1 or 2.

Verify automatic and manual transfer of unit power supply from the normal offsite circuit to the alternate offsite circuit.

24 months (continued)

SUSQUEHANNA - UNIT 1 TS / 3.8-6 Amendment No.

185

gAR REGG (I

Cg

~p

~o 4

fr)

+**++

UNITEC STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 PP&L INC.

ALLEGHENYELECTRIC COOPERATIVE INC.

DOCKET NO. 50-388 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENTTO FACILITYOPERATING LICENSE Amendment No. 15g License No. NPF-22 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the PP&L, Inc., dated November 20, 1998, as supplemented by letter dated June 25, 1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facilitywilloperate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment willnot be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.159 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days after its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 23, 1999 S. Singh Bajwa, Chief,Section I

Project Directorate I

Division of Licensing Project Management Office of Nuclear Reactor Regulation

ATTACHMENTTO LICENSE AMENDMENTNO.

9 FACILITYOPERATING LICENSE NO. NPF-22 DOCKET NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with attached revised pages.

The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE 3.8-8 INSERT 3.8-8

V

SURVEILLANCE REQUIREMENTS SURVEILLANCE AC Sources-Operating 3.8.1 FREQUENCY SR 3.8. 1.4 Verify each engine mounted day tank fuel oil level is z 420 gallons for DG A-D and a 425 gallons for DG E.

31 days SR 3.8. 1.5 Check for and remove accumulated water from each engine mounted day tank.

31 days SR 3.8.1.6 Verify the fuel oil transfer system operates to automatically transfer fuel oil from the storage tanks to each engine mounted tank.

31 days SR 3 8 1 7


------NOTES 1.

All DG starts may be preceded by an engine prelube period.

2.

A single test at the specified Frequency will satisfy this Surveillance for both units.

Verify each DG starts from standby condition and achieves, in s 10 seconds, voltage a 3793 V and frequency a 58.8, and after steady state conditions are reached, maintains voltage > 3793 V and s 4400 V and frequency > 58.8 Hz and s 61.2 Hz.

31 days SR 3.8.1.8


-----------NOTE---------------------

The automatic transfer of unit power supply shall not be performed in NODE 1 or 2.

Verify automatic and manual transfer of unit power. supply from the normal offsite circuit to the alternate offsite circuit.

24 months (continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-8 Amendment No.

159