ML17146B060
| ML17146B060 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/09/1987 |
| From: | Lazarus W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| References | |
| NUDOCS 8712140296 | |
| Download: ML17146B060 (5) | |
Text
REGUL*
,Y INFORM*TION DISTRIBUTIO SYSTEM (RIDS)
ACCESSION NHR: 8712140296 DOC. DATE: 87/12/O'P NOTARIZED:
NO FACIL: 50-387 Susquehanna Steam Electric Stations Unit 1>
Pennsg lva 50-388 Susquehanna Steam Electric Stations Unit 2i Pennsglva AUTH. NAME AUTHOR AFFILIATION LAZARUSI W. J.
Region ii Ofc of the Director RECIP. NAME
'ECIPIENT AFFILIATION KEISERi H. W.
Pennsylvania Poujer 5 Light Co.
DOCKET 05000387 05000388
SUBJECT:
Submits guidelines to be used for submittal 8c review of obJectives 5 scenario packages prior to partial scale emergency exercise scheduled for 880215. Schedule revised to reflect milestones established in FEMA 870716 draft memo.
DISTRIBUTION CODE:
IESSD COPIES RECEIVED: LTR j ENCL 0 SIZE:
TITLE: Emergency Pr eparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES: icy NMSB/FC*F/PM.
LPDP. 2cgs Transcripts.
icy NMBB/FCAF/PM.
LPDR 2cgs Transcripts.
I 05000387 05000388 RECIPIENT ID CODE/NAME PDi-2 PD CO< IES LTTR ENCL RECIPIENT ID CODE/N*ME THADANIiM COP IEB.
LTTR ENCL INTERNAL: ARM/DAF/LFMB NRR/PMAS/ILRB RGN1 F ILE 01 EXTERNAL:
LPDR NBIC NRR/DREP/EPB RGN2/DRSS/EPRPB NRC PDR 1
1 NOTES:
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL
DEC 0 9
$987 Docket No.
50-387 50-388 Pennsylvania Power
- 8) Light Company ATTN:
Nr. H.
W. Keiser Vice President Nuclear Operations 2 North Ninth Street Allentown, PA 18101 Gentlemen:
In order for the Region to fully support the Susquehanna partial-scale emergency exercise scheduled for the week of February 15, 198I, an adequate review of the exercise objectives and scenario is essential.
The guidelines identified below will be used for the submittal and review of the objectives and scenario packages prior to the exercise.
You will note that the schedule has been revised to reflect milestones established in FERA's draft memorandum EX-3 dated July 16, 1987 which we anticipate will be issued in final.
Region I has found that licensees generally comply with these guidelines,
- however, we recognize the need to stress the importance of both completeness and timeliness.
The following schedule should be used for all exercises:
Days in Advance 100 80 65 87 i2i40296 872209 PDR ADOCK 05000387 F
PDR Information to be Submitted Description and scope of exercise, and the objectives to be fulfilled should be received in the Region I office.
The objectives should include specific objectives to demonstrate, where appropriate, the effectiveness of corrective actions taken in regard to problem areas which have been previously identified during NRC inspections, emergency exercises and drills and your internal evaluation process.
NRC will provide comments, in writing, based on our review of your submittal.
Complete exercise scenario package with modified objectives, schedules, exercise rules, all controller, contingency and simulation information, all data, including plant data, radiation level and release rate date, and samples of the data to be presented should be received in the Region I office.
DRS Gau
[;")=',")IPN OI!molNAL DRSS RSS DRS Gorgon kfin Lazarus ~
/TIl 0
'IjFFiI,";),I KMMjMPP
)~O
Pennsylvania Power and Light Company DEc 0 9
$987 50 NRC will provide comments, in writing, based on our (and our contractor's) review of your submittal.
In order to protect the scenario from disclosure to participants, please send two copies to the Chief, Emergency Preparedness Section at the letterhead
- address, marked, "EMERGENCY EXERCISE SCENARIO/OBJECTIVES."
In addition, please send two copies directly to Battelle Pacific Northwest Laboratory, Attn:
Mr.
James
- Jamison, Emergency Preparedness Group, Health Physics Department, 2955 George Washington Way, Richland, WA 99352, in order to expedite the review process.
If you anticipate that the deadline will not be met, we recommend you use overnight mail.
The NRC emergency preparedness specialist responsible for evaluation of your exercise is Mr. Craig Z. Gordon.
Please identify the name, address and phone number of the individual on your staff with whom we should interface.
Your continued cooperation in this matter is greatly appreciated.
If you have any concerns or questions, please contact Mr. Gordon at 215-337-5372.
Sincerely, Original Signed Bp:
William J. Lazarus William J.
- Lazarus, Chief Emergency Preparedness Section Division of Radiation Safety and Safeguards CC:
A. R. Sabol,
- Manager, Nuclear guality Assurance E. A. Heckman, Licensing Group Supervisor R.
G.
Byram, Superintendent of Plant-SSES H.
W. Hirst, Manager, Joint Generation Projects Department R. J. Benich, Services Project Manager, General Electric Company B.
D. Kenyon, Senior Vice President-Nuclear Bryan A. Snapp, Esquire, Assistant Corporate Counsel Herbert D. Woodeshick, Special Office of the President S. Laser, Drill & Exercise Coordinator J.
C. Tilton, III Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania
Pennsylvania Power and Light Company DEc 0 g 1887 bcc:
Region I Docket Room (with concurrences)
DRP Section Chief Management Assistant DRMA Emergency
Response
Assistant Craig Z. Gordon Craig Conklin Ronald Bellamy