ML17146A887
| ML17146A887 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/24/1987 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17146A888 | List: |
| References | |
| NUDOCS 8707310025 | |
| Download: ML17146A887 (3) | |
See also: IR 05000387/1987011
Text
E
P
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
- ACCESSION NBR
- 8707310025
DOC. DATE: 87/07/24
NOTARIZED:
NO
DOCKET 8
FACIL: 50-387 Susquehanna
Steam Electric Station>
Unit
1>
Pennsg lva
05000387
50-388 Susquehanna
Steam Electric Station>
Unit
2>
Pennsg lva
05000388
~
~
~
UTH. NAME
AUTHOR AFFILI ATION
LLINS> S. J.
Region
1> Office of Director
RECIP. NAME
RECIPIENT AFFILIATION
KEISER> H. W.
Penn sg lvania Poujer
& Light Co.
SUBJECT:
Foreards
Safety
Insp Repts
50-387/87-11
& 50-388/87-if
on
870519-0630.
No violations noted.
DISTRIBUTION CODE:
IEOID
COPIEB RECEIVED: LTR
I
ENCL
(
SIZE: 4
TITLE: General
(50 Dkt)-Insp Rept/Notice
of. Violation Response
NOTES: icy NMSS/FCAF/PM.
LPDR 2cg s Transcri p ts.
icy NMSS/FCAF/PM.
LPDR, 2cgs Transcripts.
05000387
05000388
REC IP lENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
DEDRO
NRR/DOEA DIR
NRR/DREP/RPB
'NRR/PMAS/ILRB
OGC/HDS2
DEPY QI
RNAL:
LPDR
NOTES:
COPIES
LTTR ENCL
1
1
2
2
1
1
1
2
2
1
1
1
1
1
1
2
2
1
1
REC IP IENT
ID CODE/NAME
THADANI> M
MORISSEAU> D
NRR/DREP/EPB
NRR/DRIS DIR
ERM
N> J
EQ SZL
RGN1
FILE
01
NRC
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
24 JUL 1987
Docket Nos.
50-387
50"388
Power
8 Light Company
ATTN:
Mr. H.
W. Kei ser
Vice President
Nuclear Operations
Z North Ninth Street
Allentown, Pennsyl vania
18101
Gentlemen:
'ubject:Routine Resident
Inspection 50-387/87-11;
50-388/87-11
This refers to the routine resident safety inspection
conducted
by
Mr. L.
R. Plisco
and Mr. J.
R. Stair of this office on May 19,
1987 - June
30,
1987, at the Susquehanna
Steam Electric Station,
Salem Township,
The inspection consisted of observation of activities, interviews with
personnel
and document
reviews.
The results of the inspection
are described
in
the
NRC Region I Inspection
Report enclosed with this letter.
No violations
were identified.
Your cooperation with us is appreciated.
Sincerely,
Samuel J. Collins, Deputy Director
Division of Reactor Projects
Enclosure:
Combined
NRC Inspection
Report 50-387/87-11;
50-388/87-11
cc w/encl:
A.
R. Sabol,
Manager,
Nuclear guality Assurance
E. A.'Heckman,
Licensing Group Supervisor
R.
G.
Byram, Superintendent
of Plant - SSES
W.
H. Hirst,- Manager, Joint Generation
Projects
Department, Alantic Electric
R. J.
Benich, Services
Project Manager,
General Electric Company
B.
D. Kenyon, Senior Vice President - Nuclear
Bryan A. Snapp,
Esquire, Assistant Corporate
Counsel
Herbert
D. Woodeshick,
Special Office of the President
J.
C. Tilton III, Allegheny Electric Cooperative,
Inc.
Public Document
Room
(PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
87073k 0025 870724
ADOCK 05000387
8
OFFICIAL RECORD
COPY
CIR SUS 87-11
0001. 0. 0
07715/87
Power
8 Light Company
2
QQ JUf ~gg
bcc w/enc1:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
DRP Section Chief
Robert J.
DRSS
I:DRP
Plisco/gcb/mjd
7/(V87
RI: DRP
lgglns
7/
87
OFFICIAL RECORD
COPY
ins
7/g-/87
CIR SUS 87-11
0002.0.0
07/15/87