ML17146A578

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-387/86-17 & 50-388/86-18 on 860908-12.No Violation Noted.Results of Independent Measurements Will Be Reported in Subsequent Insp Rept
ML17146A578
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/16/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17146A579 List:
References
NUDOCS 8610210428
Download: ML17146A578 (2)


See also: IR 05000387/1986017

Text

OCT 3.6%86

Docket Nos.

50-387

50-388

Pennsylvania

Power

& Light Company

ATTN:

Mr. H.

W. Keiser

Vice President

Nuclear Operations

2 North Ninth Street

Allentown, Pennsyl vania

18101

Gentlemen:

Subject:

Combined Inspection

Report Nos.

50-387/86-17

and 50-388/86-18

This refers to the routine safety inspection

conducted

by Mr. B.

S.

Davidson

of this office on September

8-12,

1986 at the Susquehanna

Steam Electric

Station,

Units

1 and 2, Berwick, Pennsylvania.

The findings of our inspection

were discussed

with Mr. Blakeslee of your staff at the conclusion of the

inspection.

Areas examined during this inspection of your Chemistry

Program consisted of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

Our Mobile Laboratory

was also brought to your site

and used

by the inspector

to make certain

independent

measurements.

The purpose of these

independent

measurements

is to verify your capability for analyzing radioactive effluents,

and to achieve

and maintain comparable

methods of analyses

between your

~ facility and the

NRC.

The complete data

from these

measurements

will be

'unreported

in a subsequent

Inspection

Report.

ithin the

scope of this inspection,

no violations were observed.

In

(accordance

with 10 CFR 2.790(a),

a copy of this letter

and the enclosure will

be placed in the

NRC Public Document

Room.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

8610210428

86101b

PDR

ADOCK

05000387'incerely,

!0>181oal Sf greg py:

Tho as T. Martin, Director

>vision of Radiation Safety

and Safeguards

OFFICIAL RECORD

COPY

CIR SUS 86-17/18

0001.0.0

10/06/86

Penn syl vani a Power

8 Light Company

Enclosure:

Combined

NRC Region I Inspection

Report

Number 50-387/86-17;

50-388/86-18

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

W.

E. Barberich,

Manager,

Nuclear

Licensing

T.

M. Crimmins, Superintendent

of Plant-SSES

H.

W. Hirst, Manager, Joint Generation

Projects

Department

R. J. Benich, Services

Project Manager,

General

Electric Company

B.

D. Kenyon, Senior Vice President-Nuclear

Bryan A. Snapp,

Esquire, Assistant Corporate

Counsel

William Matson, Allegheny Electric Cooperative

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

DRP Section Chief

Robert J.

Bores,

DRSS

RI:DRSS

RI:DRSS/+

R '

RI.DRSS

peak

Davidson/gcb

Struckmeyer

Pas

ak

Bel 1 amy

(g (j'g

<%el<>'FFICIAL

R

CORD

COPY

CIR SUS 86-17/18 " 0002.0.0

10/06/86