|
---|
Category:Letter type:L
MONTHYEARL-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-014, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-025, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-02-22022 February 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-008, Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2024-02-0909 February 2024 Supplement to License Amendment Request 278. Incorporate Advanced Fuel Products. Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owners Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report 2024-09-25
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23151A4372023-05-24024 May 2023 Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database ML23151A4362023-05-24024 May 2023 License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5 ML23095A0082023-04-0404 April 2023 Attachment 2 - Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information2022-03-29029 March 2022 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information L-2021-213, Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology2021-11-19019 November 2021 Response to Request for Additional Information Regarding License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology L-2021-207, Response to Request for Additional Information for ISI Relief Request No. 102021-10-25025 October 2021 Response to Request for Additional Information for ISI Relief Request No. 10 L-2021-197, Response to Request for Additional Information for ISI Relief Request No. 102021-10-15015 October 2021 Response to Request for Additional Information for ISI Relief Request No. 10 ML21258A3792021-09-14014 September 2021 Response to Request for Additional Information, Relief Requests 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Extension of Inspection Interval for Turkey Point Unit 3 and Unit 4 Reactor. L-2020-111, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report2020-06-24024 June 2020 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor2020-06-0808 June 2020 Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor L-2020-083, Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re2020-05-21021 May 2020 Supplemental Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Re L-2020-071, Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements2020-04-16016 April 2020 Response to Request for Additional Information Regarding License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information2020-04-0909 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-135, Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications2019-07-22022 July 2019 Response to Request for Additional Information Regarding License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications ML19158A5032019-06-0707 June 2019 NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Turkey Point ESA Section 7 Consultation L-2019-114, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response2019-06-0404 June 2019 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 10, RAI No. B.2.3.28-1b Updated Response L-2019-048, Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 82019-03-15015 March 2019 Response to Request for Additional Information (Rai), Subsequent License Renewal Application Safety Review Revision 1, Second Submittal Set 8 L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses2019-03-0606 March 2019 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses L-2019-033, Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses2019-03-0101 March 2019 Response to Requests for Additional Information Subsequent License Renewal Application Safety Review Revision 1, Set 8 First Submittal Responses ML19056A1252019-02-25025 February 2019 Turky Point SLRA RAIs 1 2 3 4 5 6 7 8 9 11 - Set 8 Rev 1 Irradiated Concrete-Steel Responses L-2019-012, Response to Follow-on NRC RAI No. B.2.3.9-1 a2019-02-13013 February 2019 Response to Follow-on NRC RAI No. B.2.3.9-1 a L-2019-023, Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals2019-01-31031 January 2019 Response to Request for Additional Information Regarding License Amendment Request 265, Revise NFPA-805 License Condition for Reactor Coolant Pump Seals L-2018-234, Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision2018-12-21021 December 2018 Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision L-2018-223, Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses2018-12-14014 December 2018 Subsequent License Renewal Application Safety Review - November 15, 2018 Public Meeting Action Item Responses L-2018-222, Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses2018-12-12012 December 2018 Subsequent License Renewal Application Safety Review - November 13, 2018 Public Meeting Discussion Topic Responses L-2018-191, Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review2018-11-28028 November 2018 Supplemental Responses Requests for Additional Information (RAI) Set 7 Subsequent License Renewal Application Safety Review L-2018-218, Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review2018-11-28028 November 2018 Supplemental Response to Request for Additional Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review L-2018-193, Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review2018-11-0202 November 2018 Set 6 Responses to Request for Additional Information (RAI) on Subsequent License Renewal Application Safety Review L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings.2018-10-31031 October 2018 WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. ML18299A1142018-10-24024 October 2018 Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 4 Responses L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items ML18296A0242018-10-16016 October 2018 Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal ML18299A1172018-10-12012 October 2018 Framatome Calculation No. 32-9280712, Rev. 002, Tp CRDM Lower Joint Environmentally Assisted Fatigue Dated October 12, 2018 (Non-Proprietary) 2024-09-24
[Table view] |
Text
10 CFR 50.90 L-2017-098 May 24, 2017 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 RE: Turkey Point Nuclear Plant, Units 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating Licenses DPR-31 and DPR-41 Supplement to Florida Power & Light Company letter L-2017-049, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS)
References:
- 1. Florida Power & Light Company letter L-2016-246, License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS),
August 3, 2016 (ADAMS Accession No. ML16230A003)
- 2. Florida Power & Light Company letter L-2017-013, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS), January 27, 2017 (ADAMS Accession No. ML17032A345)
- 3. Florida Power & Light Company letter L-2017-049, Response to Request for Additional Information Regarding License Amendment Request 246, Changes to Technical Specifications 3/4.7.5, Control Room Emergency Ventilation System (CREVS), March 31, 2017 (ADAMS Accession No. ML17090A331)
In Reference 1, Florida Power & Light Company (FPL) submitted license amendment request (LAR) 246 for Turkey Point Units 3 and 4, which modifies Technical Specification (TS) 3.7.5, Control Room Emergency Ventilation System, by revising the Limiting Conditions for Operation, Required Actions and Surveillance Requirements to reflect the current system design and to align the Turkey Point TS more closely with NUREG-1431, Standard Technical Specifications -
Westinghouse Plants, Revision 4.0, (ADAMS Accession No. ML12100A222).
In References 2 and 3, FPL submitted additional information that the NRC determined is necessary to complete its review. Additionally in Reference 3, FPL modified a proposed change previously submitted in References 1 and 2 and provided a marked up version of the affected TS page and a retyped (clean copy) version with revision bars to identify the change.
Florida Power & Light Company 9760 SW 344 St., Homestead, FL 33035
Turkey Point Nuclear Plant L-2017-098 Docket Nos. 50-250 and 50-251 Page 2of2 FPL was subsequently made aware of inconsistencies in the TS marked up and clean copy versions of the affected TS page provided in Reference 3. One such inconsistency was the TS 3/4.7.5, ACTION b, requirement to immediately suspend the movement of irradiated fuel assemblies during MODES 1, 2, 3 and 4, which is redundant with the paragraph applicable to MODES 5, 6, or (anytime) during the movement of irradiated fuel assemblies. During discussion with NRC staff, it was agreed that a supplement to Reference 3 providing corrected marked up and clean copy versions of the affected TS page would be appropriate. to this letter provides the corrected marked up copy of the affected TS page. provides the corrected retyped (clean copy) version of the affected TS page with revision bars to identify the proposed changes. Attachment 3 provides the affected TS Bases pages marked up to show the proposed changes. The TS marked up page, retyped (clean copy) TS page and TS Bases marked up pages supersede the corresponding pages provided in Reference 3. The TS Bases changes are provided for information only and will be incorporated in accordance with the TS Bases Control Program upon implementation of the approved amendment.
The supplements included in this response provide additional information that clarifies the application, does not expand the scope of the application as originally noticed, and should not change the NRC staff's original proposed no significant hazards consideration determination as published in the Federal Register.
This letter contains no new or revised regulatory commitments.
Should you have any questions regarding this submission, please contact Mr. Mitch Guth, Turkey Point Licensing Manager, at 305-246-6698.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 24th day of May 2017.
Sincerely, 7-\L___
Thomas Summers Regional Vice President - Southern Region Florida Power & Light Company Attachments cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health
Turkey Point Nuclear Plant L-2017-098 Docket Nos. 50-250 and 50-251 Attachment 1 ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION PAGE (MARK-UP)
(1 page follows)
PLANT SYSTEMS 3/4.7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION (continued) during MODES 1, 2, 3 or 4 . Within
- b. With the Control Room Emergency Ventilation System inoperable due to an inoperable CRE boundary, immediately suspend all movement of irradiated fuel in the spent fuel pool, and immediately initiate action to implement mitigating actions, and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, verify mitigating actions ensure CRE occupant radiological and chemical hazards will not exceed limits, and CRE occupants are protected from smoke hazards, and restore CRE boundary to OPERABLE status within 90 days., or:
With the above requirements not met, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for one Unit, or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for both Units, and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With the Control Room Emergency Ventilation System inoperable due to an inoperable CRE boundary during MODES 5, 6 or during the movement of irradiated fuel assemblies, immediately suspend all movement of irradiated fuel.
- 1) With the requirements not met, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- 2) If this ACTION applies to both units simultaneously, be in HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
MODES 5 and 6:
- c. With the Control Room Emergency Ventilation System inoperable++, immediately suspend all operations involving CORE ALTERATIONS, movement of irradiated fuel in the spent fuel pool, or positive reactivity changes. This ACTION shall apply to both units simultaneously.
SURVEILLANCE REQUIREMENTS 4.7.5 The Control Room Emergency Ventilation System shall be demonstrated OPERABLE:
- a. In accordance with the Surveillance Frequency Control Program by verifying that the control room air temperature is less than or equal to 120°F;
- b. In accordance with the Surveillance Frequency Control Program by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the system operates for at least 15 minutes***;
- c. In accordance with the Surveillance Frequency Control Program or (1) after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of system operation, or (2) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (3) following exposure of the filters to effluents from painting, fire, or chemical release in any Remove ventilation zone communicating with the system that may have an adverse effect on the functional asterisk capability of the system, or (4) after complete or partial replacement of a filter bank by:
++ If action per ACTIONS a.4, a.6, a.7, a.8, or a.9 is taken that permits indefinite operation and the system is placed in recirculation mode, then CORE ALTERATIONS, movement of irradiated fuel in the spent fuel pool, and positive reactivity changes may resume.
- As the mitigation actions of TS 3.7.5 Action a.5 include the use of the compensatory filtration unit, the unit shall meet the surveillance requirements of TS 4.7.5.b, by manual initiation from outside the control room and TS 4.7.5.c, d and f g.
TURKEY POINT - UNITS 3 & 4 3/4 7-20 AMENDMENT NOS. 263 AND 258
Turkey Point Nuclear Plant L-2017-098 Docket Nos. 50-250 and 50-251 Attachment 2 ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION PAGE (CLEAN COPY)
(1 page follows)
PLANT SYSTEMS 3/4.7.5 CONTROL ROOM EMERGENCY VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION (continued)
- b. With the Control Room Emergency Ventilation System inoperable due to an inoperable CRE boundary during MODES 1, 2, 3 or 4, immediately initiate action to implement mitigating actions. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, verify mitigating actions ensure CRE occupant radiological and chemical hazards will not exceed limits and CRE occupants are protected from smoke hazards, and restore CRE boundary to OPERABLE status within 90 days.
With the above requirements not met, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for one Unit, or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for both Units, and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With the Control Room Emergency Ventilation System inoperable due to an inoperable CRE boundary during MODES 5, 6 or during the movement of irradiated fuel assemblies, immediately suspend all movement of irradiated fuel.
SURVEILLANCE REQUIREMENTS 4.7.5 The Control Room Emergency Ventilation System shall be demonstrated OPERABLE:
- a. In accordance with the Surveillance Frequency Control Program by verifying that the control room air temperature is less than or equal to 120°F;
- b. In accordance with the Surveillance Frequency Control Program by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the system operates for at least 15 minutes**;
- c. In accordance with the Surveillance Frequency Control Program or (1) after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of system operation, or (2) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (3) following exposure of the filters to effluents from painting, fire, or chemical release in any ventilation zone communicating with the system that may have an adverse effect on the functional capability of the system, or (4) after complete or partial replacement of a filter bank by:
- As the mitigation actions of TS 3.7.5 Action a.5 include the use of the compensatory filtration unit, the unit shall meet the surveillance requirements of TS 4.7.5.b, by manual initiation from outside the control room and TS 4.7.5.c, d and f.
TURKEY POINT - UNITS 3 & 4 3/4 7-20 AMENDMENT NOS. AND
Turkey Point Nuclear Plant L-2017-098 Docket Nos. 50-250 and 50-251 Attachment 3 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATION BASES PAGES (MARK-UP)
(3 pages follow)
REVISION NO.: PROCEDURE TITLE: PAGE:
22 TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 174 of 211 PROCEDURE NO.:
0-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 157 of 194) 3/4.7.5 (Continued)
If the unfiltered inleakage of potentially contaminated air past the CRE Boundary and into the CRE can result in CRE occupant radiological dose greater than that calculated in the dose analyses or in inadequate protection of CRE occupants from hazardous chemicals or smoke, the CRE boundary is inoperable. Actions must be taken to restore an Upon determination OPERABLE CRE Boundary within 90 days when in MODES 1, 2, 3, or 4.
During the period that the CRE boundary is considered inoperable in MODES 1, 2, 3, or 4, the operators are required to immediately initiate action to implement mitigating actions to lessen the effect on CRE occupants from the potential hazards of a radiological or chemical event or a challenge from smoke. Actions must be taken within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to verify that in the event of a DBA, the mitigating actions will ensure that during CRE occupant radiological exposures will NOT exceed the calculated MODES dose in the radiological dose consequence analyses, and that CRE 1, 2, 3 occupants are protected from hazardous chemicals and smoke.
and 4 Previous surveys of offsite and onsite chemicals identified that NO hazardous chemicals present a hazard to Control Room habitability.
Thus, the mitigating action for chemical hazards may verify that the chemical hazards analyses are current and require NO toxic gas protection for the CRE occupants. These mitigating actions (i.e.,
actions that are taken to offset the consequences of the inoperable CRE boundary) should be preplanned for implementation upon entry into the condition, regardless of whether entry is intentional or unintentional. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowable outage time (AOT) is reasonable based on the low probability of a DBA occurring during this time period and the use of mitigating actions. The 90 day AOT is reasonable based on the determination that the mitigating actions will ensure protection of CRE occupants within analyzed limits while limiting the probability that CRE occupants will have to implement protective measures that may adversely affect their ability to control the reactors and maintain them in a safe shutdown condition in the event of a DBA. The 90 day AOT is a reasonable time to diagnose, plan and possibly repair, and test most problems with the CRE boundary.
Once the effectiveness of the mitigating actions have been verified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of CRE boundary inoperability, actions must be taken to restore the CRE boundary to OPERABLE within 90 days.
REVISION NO.: PROCEDURE TITLE: PAGE:
22 TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 175 of 211 PROCEDURE NO.:
0-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 158 of 194) 3/4.7.5 (Continued)
In MODES 1, 2, 3, or 4, if the inoperable CREVS or the CRE Boundary cannot be restored to OPERABLE status within the associated required the AOT, the unit must be placed in a MODE that minimizes the accident following risk. To achieve this status, the unit must be placed in at least MODE 3 30 (HOT STANDBY) within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 (COLD SHUTDOWN) within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. If the inoperability applies to both units simultaneously, be in MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and in MODE 5 within 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br />. The AOTs are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
In MODE 5 or 6, with the CREVS inoperable for an inoperable CRE Boundary or for other reasons, action must be taken immediately to suspend all operations that could result in a release of radioactivity that might require isolation of the CRE, such as movement of irradiated fuel.
This places the unit in a condition that minimizes the accident risk. This does NOT preclude the movement of fuel to a safe position. These ACTION requirements apply to both units simultaneously.
Operations that, in the absence of a compensation adjustment, add positive reactivity are acceptable when, combined with other concurrent actions that add negative reactivity, the overall net reactivity addition is zero or negative. For example, a positive reactivity addition caused by temperature increases or decreases is acceptable if it is concurrent with a negative reactivity addition (i.e., boration and/or rod movement, if authorized) such that the overall, net reactivity addition is zero or negative.
Upon determination that the CRE boundary is inoperable in MODES 5, 6, or during the movement of irradiated fuel, all movement of irradiated fuel must be immediately suspended and must remain suspended for the duration of inoperability. Suspending irradiated fuel movement during these operational modes suspends activities that could result in a release of radioactivity that might require isolation of the CRE.
REVISION NO.: PROCEDURE TITLE: PAGE:
22 TECHNICAL SPECIFICATION BASES CONTROL PROGRAM 176 of 211 PROCEDURE NO.:
0-ADM-536 TURKEY POINT PLANT ATTACHMENT 2 Technical Specification Bases (Page 159 of 194) 3/4.7.5 (Continued) f Surveillance Requirement (SR) 4.7.5.g verifies the OPERABILITY of the CRE Boundary by testing for unfiltered air inleakage past the For CRE boundary and into the CRE. It verifies that the unfiltered air MODES 1, inleakage into the CRE is NO greater than the flow rate assumed in 2, 3 or 4, the dose analyses. When unfiltered air inleakage is greater than the assumed flow rate, ACTION b must be entered when a unit is in MODES 1-4 and ACTION c must also be entered when a unit is in MODE 5 or 6). ACTION b allows time to restore the CRE boundary to OPERABLE status provided mitigating actions are taken while in MODES 1-4, that ensures that the CRE remains within the licensing basis habitability limits for the occupants following an accident. The details of the testing are specified in the Control Room Envelope Habitability Program.
90 days immediate action is initiated to implement mitigating actions, and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the mitigating actions are verified to ensure For MODES 5, 6 or during the movement of irradiated fuel, ACTION b requires the immediate suspension of all irradiated fuel movement and the suspension remains in effect for the duration of CRE boundary inoperability.