the Independent Spent Fuel Storage Installation, Revision 3 to the Permanently Defueled Emergency Plan and Revisions to the Permanently Defueled Emergency Plan Implementing Procedures
ML17143A008
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/18/2017
From: Morgan M
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML17143A008 (2)


Text

Mark Morgan Regulatory Affairs An EDISON INTERNATIONAL Company May 18, 2017 10 CFR 50.54(q)

U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362, and 72-41 Revision 3 to the Permanently Defueled Emergency Plan and Revisions to the Permanently Defueled Emergency Plan Implementing Procedures San Onofre Nuclear Generating Station (SONGS), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation

Dear Sir or Madam:

Pursuant to 10 CFR 50.54(q), Southern California Edison (SCE) has revised the Permanently Defueled Emergency Plan for the San Onofre Nuclear Generating Station (SONGS), and two Permanently Defueled Emergency Plan Implementing Procedures.

The changes to the Permanently Defueled Emergency Plan were to add the requirement of On-Shift personnel to be trained as Radiation Workers and to perform limited RP duties and to remove the letters of agreement and only reference the letters.

SCE has determined that the changes do not reduce the effectiveness of the Permanently Defueled Emergency Plan or Permanently Defueled Emergency Plan Implementing Procedures, and the Permanently Defueled Emergency Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50 Appendix E. This letter serves as the report required by 10 CFR 50.54(q)(iv)(5).

Attachment 1 of this letter transmits Revision 3 of the SONGS Permanently Defueled Emergency Plan effective April 18, 2017.

  • Attachment 2 provides a report and analysis summary of the Permanently Defueled Emergency Plan changes.

Attachment 3 of this letter provides a copy of the following revised Permanently Defueled Emergency Plan Implementing Procedures:

!fX45 A)JV1SSD1 f\)tJi 5 S -Z~

P. 0. Box 128 San Clemente, CA 92672 ~If fJJ../55

Document Control Desk May 18, 2017 Procedure Rev. Effective Date S0123-Vlll-ADMIN-1, EMERGENCY PREPAREDNESS PROGRAM 3 04/25/2017 MAINTENANCE S0123-Vlll-ADMIN-2, EMERGENCY PREPAREDNESS PROGRAM 2 04/25/2017 TRAINING provides a report and analysis summary of the Permanently Defueled Emergency Plan Implementing Procedures changes.

There are no commitments contained in this letter or its attachments.

If you have any questions or require additional information please contact me at (949) 368-6745.

Sincerely, di.

Attachments: 1. SONGS Permanently Defueled Emergency Plan - Revision 3

2. Report and Analysis Summary of Permanently Defueled Emergency Plan Changes
3. Revised Permanently Defueled Emergency Plan Implementing Procedures
4. Report and Analysis Summary of Permanently Defueled Emergency Plan Implementing Procedures Changes cc: Emergency Response Coordinator, NRC Region IV (2 copies of Attachment 3)

K. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, San Onofre ISFSI