ML17139D201

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-387/85-26 & 50-388/85-21 on 850729-0825.No Violation Noted
ML17139D201
Person / Time
Site: Susquehanna  
Issue date: 09/19/1985
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139D202 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8510020073
Download: ML17139D201 (3)


See also: IR 05000387/1985026

Text

Docket Nos.

50-387

50-388

Gentlemen:

Ox'igin81 Signed gy;

Enclosures:

1.

Combined

NRC Inspection

Report 50-387/85-26;

388/85-21

2.

Attachment

1

TMI Action Item Status

I

SEf f 91985

Pennsylvania'Power

5 Light Company

Attn:

Mr. H.

W. Keiser

Vice President

Nuclear Operations

2 North Ninth Street

Allentown, Pennsylvania

18601

Subject:

Routine Resident

Inspection

50-387/85-'26;

50-388 85-21

7/29/85

8-25-85)

This routine inspection of the Susquehanna

Steam Electric Station covered

plant operations,

surveillance,

maintenance,

open items,

IE Bulletins, Unit

1

License Conditions,

and licensee

events.

The report focused

upon the status

of TMI Action Plan Requirements

(NUREG-0737).

The review found that the

majority of action items

have

been resolved,

and the remainder

are

on schedule

to be completed

by previously committed dates.

No violations were identified

in this inspection.

t,

This letter acknowledges

your August 15,

1985 reply to the Notice of

Violation/Notice of Deviation forwarded by

NRC Region I letter dated July 16,

1985.

Your response will be evaluated

during routine

NRC inspection.

In accordance

with 10

CFR 2.790(a),

a copy of this letter and the enclos

res

will be placed in the

NRC Public Document

Room.

Your cooperation with us is appreciated.

I

Sincerely,

!

Harry B. Kister, Chief

Project Branch

No.

1

Divison of Reactor ProjectsII

==--. FFICIAL RECORD

COPY

8510020073

850909387

CIR SUS 85-26/21 - 0001.0.0

09/11/85

'Ol

~ g

s

\\ ~

II

"t

I'

Pennsylvania

Power 5 Light Company

2

cc w/encls:

'orman

W. Curtis, Vice President,

Engineering

and Construction - Nuclear

A.

R. Sabol,

Manager,

Nuclear guality Assurance

-

W.

E. Barberich,

Manager,

Nuclear Licensing

.

T.

M. Crimmins, Superintendent

of Plant

SSES

~ A. J. Pietrofitta,

General

Manager,

Power Production

Engineering

and

Construction, Atlantic Electric

R. J. Benich, Services

Project Manager,

General Electric Company

B.

D. Kenyon, Senior Vice President - Nuclear

William Matson

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

~ Commonwealth of Pennsylvania

bcc w/encls:

'egion I Docket

Room (with concurrences)

'enior Operations Officer (w/o encls)

DRP Section Chief

DRP:RI

< RJacobs/ba

9/i3/85

DRP:RI

JStrosnider

9/1) /85

9$

/85

~SS

OFFICIAL RECORD

COPY

CIR SUS 85-26/21 - 0001.1.0

09/11/85