Text
AUG 1
6 1S85
Docket .Nos.
50-387
50-388
Power
8 Light Company
ATTN:
Mr. H.
W. Keiser
Vice-President
Nuclear Operations
2 North Ninth Street
Al 1 entown,
Penn syl vani a
18101
Gentlemen:
Subject:
Resident
Inspection
50-387/8 -21;
0-388/85-17
(6/24/85
7/28/85)
This
routine
inspection
of
the
Susquehanna
Steam
Electric
Station
lcovered
plant operations,
surveillance,
maintenance,
follow-up of open
items,
licensee
events,
IE Bulletins
and
Information Notices,
and
System
Walkdowp.
The
inspector
identified
one
violation
in
which
a
manual
containment
isolation
valve in the Unit 2
RCIC System
was closed,
but not locked closed
as required.
Please
reply to this matter in accordance
with enclosed
Appendix A.
Section
1. 17 addresses
the
issue
of reliable
power to the
RCIC Topaz Inverter
and although
a great deal of effort has
been
expanded, little correctivel action
appears
to
have
resulted.
You are
requested
to reply to this
concern,
and
provide your corrective
action
schedule
along with the
response
to
the~
above
violation.
Please
note that attached
to this inspection report, is
a copy of an
anonymous
allegation regarding plant drawings which was received
by Region I.
TheII allega-
tion
reemphasizes
a previously identified
concern
related
to this issue.
We
request that you investigate this allegation
and inform us within thirty days
what impact, if any, this has
on your letter dated
June
24,
1985 that addressed
this issue.
This letter also acknowledges'our
July 3,
1985 reply to the Notice ofI Viola-
tion
forwarded
by
NRC
Region
I letter
dated
June
3,
1985.
The co'rrective
actions
described
in
your
reply will
be
evaluated
during
routirie
NRC
Inspection.
i
The
responses
requested
by this
letter
are
not
subject
to
the
clearance
procedures
of the Office of Management
and Budget
as
required
by the
Paperwork
Reduction Act of 1980,
PL96-511.
I
li
8508220162
8508i6
I,1
ADOCK 05000387, 'I
G
.'
'PDR Q',
OFFICIAL RECORD
COPY
CIR SUS 85-21/17
0001'.0.0
08/15/85
~ E.p i
~~
~ ~ ~
7/i I
'll,
0
I{
Power & Light Company
Your cooperation with us is appreciated.
Sincerely,
Qriginal Signed By.
Harry B. Kister, Chief
Project Branch
No.
1
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined
NRC Inspection
Report 50-387/85-21;
50-388/85-17
3.
Anonymous Allegation
bcc w/encls:
Region I Docket
Room (with concurrences)
Senior Operations Officer (w/o encls)
DRP Section Chief
Allegation File RI-85-A-28
I:DRP
Strysnider
8/l~/85
8/ g/88
cc w/encls:
Norman
W. Curtis, Vice President,
Engineering
and Construction
Nuclear
A.
R. Sabol,
Manager,
Nuclear Quality Assurance
W.
E. Barberich,
Manager,
Nuclear Licensing
T.
M. Crimmins, Superintendent
of Plant
A. J. Pietrofitta,
General
Manager,
Power Production
Engineering
&
Construction, Atlantic Electric
William Matson, Allegheny Electric Cooperative
R. J.
Benich,
Services
Project Manager,
General Electric Company
Public Document
Room,(PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
Kisser
!
OFFICIAL RECORD
COPY
CIR SUS 85-21/17 - 0001.1.0
08/15/85
iI
1
~