Forwards Resident Insp Repts 50-387/85-21 & 50-388/85-17 on 850624-0728 & Notice of Violation.Requests Info Re Plant Drawings Per Encl Anonymous Allegation.Ack 850703 Reply to 850603 Notice of Violation
ML17139D112
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/16/1985
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139D113 List:
References
NUDOCS 8508220162
Download: ML17139D112 (4)


See also: IR 05000387/1985021

Text

AUG 1

6 1S85

Docket .Nos.

50-387

50-388

Pennsylvania

Power

8 Light Company

ATTN:

Mr. H.

W. Keiser

Vice-President

Nuclear Operations

2 North Ninth Street

Al 1 entown,

Penn syl vani a

18101

Gentlemen:

Subject:

Resident

Inspection

50-387/8 -21;

0-388/85-17

(6/24/85

7/28/85)

This

routine

inspection

of

the

Susquehanna

Steam

Electric

Station

lcovered

plant operations,

surveillance,

maintenance,

follow-up of open

items,

licensee

events,

IE Bulletins

and

Information Notices,

and

ESF

System

Walkdowp.

The

inspector

identified

one

violation

in

which

a

manual

containment

isolation

valve in the Unit 2

RCIC System

was closed,

but not locked closed

as required.

Please

reply to this matter in accordance

with enclosed

Appendix A.

Section

1. 17 addresses

the

issue

of reliable

power to the

RCIC Topaz Inverter

and although

a great deal of effort has

been

expanded, little correctivel action

appears

to

have

resulted.

You are

requested

to reply to this

concern,

and

provide your corrective

action

schedule

along with the

response

to

the~

above

violation.

Please

note that attached

to this inspection report, is

a copy of an

anonymous

allegation regarding plant drawings which was received

by Region I.

TheII allega-

tion

reemphasizes

a previously identified

concern

related

to this issue.

We

request that you investigate this allegation

and inform us within thirty days

what impact, if any, this has

on your letter dated

June

24,

1985 that addressed

this issue.

This letter also acknowledges'our

July 3,

1985 reply to the Notice ofI Viola-

tion

forwarded

by

NRC

Region

I letter

dated

June

3,

1985.

The co'rrective

actions

described

in

your

reply will

be

evaluated

during

routirie

NRC

Inspection.

i

The

responses

requested

by this

letter

are

not

subject

to

the

clearance

procedures

of the Office of Management

and Budget

as

required

by the

Paperwork

Reduction Act of 1980,

PL96-511.

I

li

8508220162

8508i6

I,1

PDR

ADOCK 05000387, 'I

G

.'

'PDR Q',

OFFICIAL RECORD

COPY

CIR SUS 85-21/17

0001'.0.0

08/15/85

~ E.p i

~~

~ ~ ~

7/i I

'll,

0

I{

Pennsylvania

Power & Light Company

Your cooperation with us is appreciated.

Sincerely,

Qriginal Signed By.

Harry B. Kister, Chief

Project Branch

No.

1

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined

NRC Inspection

Report 50-387/85-21;

50-388/85-17

3.

Anonymous Allegation

bcc w/encls:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

DRP Section Chief

Allegation File RI-85-A-28

I:DRP

Strysnider

8/l~/85

8/ g/88

cc w/encls:

Norman

W. Curtis, Vice President,

Engineering

and Construction

Nuclear

A.

R. Sabol,

Manager,

Nuclear Quality Assurance

W.

E. Barberich,

Manager,

Nuclear Licensing

T.

M. Crimmins, Superintendent

of Plant

A. J. Pietrofitta,

General

Manager,

Power Production

Engineering

&

Construction, Atlantic Electric

William Matson, Allegheny Electric Cooperative

R. J.

Benich,

Services

Project Manager,

General Electric Company

Public Document

Room,(PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

Kisser

!

OFFICIAL RECORD

COPY

CIR SUS 85-21/17 - 0001.1.0

08/15/85

iI

1

~