Forwards Insp Rept 50-387/85-02 on 850111-16.Response to Unresolved Issues Re Configuration Control Problems in Wiring Diagrams for Internal Cabinet Terminations Requested within 30 Days
ML17139D029
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/27/1985
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kenyon B
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139D030 List:
References
NUDOCS 8504020349
Download: ML17139D029 (2)


See also: IR 05000387/1985002

Text

Docket Nos.

50-387

NR3Y PGg

Pennsylvania

Power

8 Light Company

ATTN:

Mr . Bruce

D.

Kenyon

Vice President

Nuclear Operations

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

No. 50-387/85-02

This letter transmits

the report of the January

11-16,

1985 inspection of the

Susquehanna

Steam Electric Station

by Mr. E.

M. Kelly.

The findings from the

inspection

have

been discussed

with Mr.

R.

Byram of your staff.

The inspection

covered Unit

1 design

changes

intended for installation during

the upcoming refueling outage,

as well as modifications

made or planned for the

Safety Parameter

Display and Transient Monitoring Systems.

Plant

Change

Notices

(PCNs)

and Drawing Change

Notices

(DCNs) issued against

the above

modifications were reviewed with emphasis

on examples

of discrepancies

between

the as-built plant and design drawings.

Evidence

'was found of configuration

control problems,

of which you were previously aware, with Class

2 connecton

and wiring diagrams

for internal cabinet terminations.

Although no correlation

has

been

made to any operational

problems,

we believe that the potential extent

and significance of such discrepancies

as they relate to both the design

process

and plant opera tion should

be fully understood.

You are therefore

requested

to address

the unresolved

item described

in this report,

in writing,

within 30 days.

Your cooperation with us is appreciated.

Sincerely,~ gf~?94 5/4

Harry B.

Kister,

Chief

Projects

Branch

No.

1

Division of Reactor Projects

Enclosure:

NRC Inspection

Report 50-387/85-02

S5040a0349

85

0~87

l

PDR

ADO'50003

P

OFFICIAL RECORD

COPY

DL50-387/85-02 - 0001.0.0

01/29/85

0J'

I

Pennsylvania

Power

& Light Co.

cc w/encl:

Norman

W. Curtis, Vice President,

Engineering

and Construction

Nuclear

A.

R. Sabol,

Manager,

Nuclear guality Assurance

W.

E. Barberich,

Licensing Engineer

H.

W. Keiser, Superintendent

of Plant

William Matson

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encl)

Director,

DRS

Director,

DRSS

J. Strosnider,

DRP Section Chief

E. Kelly, DRP

A. Shropshire

P

I:DRP

DRP

Kelly/slf/jm

Strosnider

Kister

3/21/85

g~~~/g

OFFICIAL RECORD

COPY

DL50-387/85-02 - 0001.1.0

01/29/85