ML17139C883

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-387/84-39 & 50-388/84-49 on 841210-14.No Violation Noted
ML17139C883
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/06/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kenyon B
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139C884 List:
References
NUDOCS 8502110326
Download: ML17139C883 (4)


See also: IR 05000387/1984039

Text

~g5i

.FEB Po

IgBg

Docket Nos.

50-387

50-388

Pennsylvania

Power

& Light Company

ATTN:

Mr. Bruce

D.

Kenyon

Vice President

Nuclear Operations

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

No. 50-387/84-39

and 50-388/84-49

This refers to the routine safety inspection

conducted

by Messers

R.

L. Nimitz

and J. J.

Kottan of this office on December

10

14,

1984 at the Susquehanna

Steam Electric Station,

Units

1 and 2, Berwick, Pennsylvania.

The findings of

our inspection

were discussed

with Mr.

H. Keiser of your staff at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter.

Within these

areas,

the

inspection of your Radiological Controls

and Chemistry

Program consisted of

selective

examinations of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

Our Mobile Laboratory was also brought to your site

and

used

by the inspector

to make certain

independent

measurements.

The purpose of these

independent

measurements

is to verify your capability for analyzing radioactive effluents,

and to achieve

and maintain comparable

methods of analyses

between your

facility and the

NRC.

The complete data

from, these

measurements

will be

reported in a subsequent

Inspection

R'eport.

Within the

scope of this inspection,

no violations were observed.

In

accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

8502j.i032b 85020b

PDR

ADQCK 05000387

8

PDR

OFFICIAL RECORD

COPY

DL50-387/84-39

0001.0.0

01/24/85

I

ti

fpg

Pennsylvania

Power

& Light Company

FEB OG 1985

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

Thomas'T.

Martin, Director

Division of Radiation Safety

and

Safeguards

Enclosure:

Combined

NRC Region I Inspection

Report

Number

50-387/84-39;

50-388/84-49

cc w/encl:

Norman

W. Curtis, Vice President,

Engineering

and Construction - Nuclear

A.

R. Sabol,

Manager,

Nuclear guality Assurance

W.

E. Barberich,

Licensing Engineer

H.

W. Keiser, Superintendent

of Plant

William Matson

Public Document

Room (PDR)

Local Public Document

Room

(LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

DPRP Section Chief

-J. Grant,

DPRP

RI:DRSS

Ni'mi'gz/mlb

Ol/)+/85

RI:DRSS

Bellamy

01/yi/85

RI:DRSS

S true kmeyer

Ol/z,s/85

RI'. DRSS

RI: DRSS

RI

S

Carson

Ko'ttan,

Pasciak

Ol/28/85

01 Z8/85

01.

/85

~pt.6

OFFICIAL RECORD

COPY

DL50-387/84-39 - 0002.0.0

01/24/85

t go

4~1

W'