ML17139C829
| ML17139C829 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 01/10/1985 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kenyon B PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17139C830 | List: |
| References | |
| NUDOCS 8501240465 | |
| Download: ML17139C829 (3) | |
See also: IR 05000387/1984035
Text
Docket Nos.
50-387
50-388
JAN 1 0.>885
License
Nos.
NPF-22
/
Power
& Light Company
ATTN:
Mr. Bruce
D.
Kenyon
Vice President
Nuclear Operations
2 North Ninth Street
Allentown, Pennsylvania
18101
tE Fii.E COeV
Gentlemen:
Subject:
Enforcement
Conference
for Inspection
50-387/84-35
This letter refers to the enforcement
conference
held
on November 30,
1984, in
the Region I office to discuss
the findings of Susquehanna
Special
Inspection
50-387/84-35,
related to the control
rod array which exceeded
a scram insertion
time Technical Specification limit during
a Unit
1 trip on June
13,
1984.
At th'is meeting,
we also discussed
the status of your actions associated
with
Confirmato~y Action Letter 84-18, addressing
problems with T-ASCO scram pilot
the results of which were outlined in your letters to Region I
dated
November
19,
1984.
Conference details are described
in the report enclosed with this letter.
Also
enclosed is
a copy of your presentation
which was distributed at this meeting.
Based
on our discussions
at this meeting,
and the results of your evaluation of
the failure mechanism of the
scram pilot solenoids,
we feel that the increased
frequency of rod surveillance testing
should
be continued
as committed to in
CAL 84-18 and your November 19,
1984 letter, until your final evaluation
and
a
written application for relief to the
NRC have
been
completed.
You will be notified of our evaluation of appropriate
enforcement
action by
separate
letter.
Your cooperation with us in this matter is appreciated.
Sincerely,
Ol.igimlfvi~ibg ~
Enclosures:
1.
Enforcement
Conference
Report
2.
.
PP&L Presentation
Richard
W. Starostecki,
Director
Division of Project
and Resident
Programs
OFFICIAL RECORD
COPY
8SosaeoeaS
850>i,o
ADOCK 05000387
8
ENFCONFSUSQ12/10/84 - 0001.0.0
12/13/84
h
I
~.,
fi .j
Power & Light Company
cc w/encls:
Norman
W. Curtis, Vice Pres'ident,
Engineering
and Construction
Nuclear
A.
R. Sabol,
Manager,
Nuclear Quality Assurance
W.
E. Barberich,
Licensing Engineer
H.
W. Keiser, Superintendent
of Plant
William Matson
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encls:
Region I Docket
Room (with concurrences)
Senior Operations Officer (w/o encls)
T. Murley
D. Holody
T. Martin
J. Durr
M. Campognone,
J.
T. Beard,
G. Holahan,
RI: DPRP
Strosnider/gcb
~0/84
1s
PRP
RI: DPRP
er~
St~r st
OFFICIAL RECOR
cki
ENFCONFSUSQ12/10/84 - 0002.0.0
01/03/85