ML17139C070
| ML17139C070 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/12/1983 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17139C071 | List: |
| References | |
| NUDOCS 8312280078 | |
| Download: ML17139C070 (7) | |
Text
a a
~S IIEOOD 0
A C
O I
+~
~O
+**++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 PENNSYLVANIA POWER AND LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE, INC.
0 CKET N
- 87 SUSQUEHANNA S C
GL NS Amendment No. 19 License No. NPF-14 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for amendment filed by the Pennsylvania Power and Light Company, dated October 20,
- 1983, as amended by PP8L letter dated November 7, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) th'at such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and secur'ity or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.
NPF-14 is hereby amended to read as follows:
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 19
, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PP8L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
83i2280078 83i2i2 PDR ADOCK 05000387
'p PDR
~
~
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technica1 Specifications
~gimg gfg@gy yp<
A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing Date of Issuance:
December 12, 1983 DL:LB RLPerch:pt lz./ &83 DL:LB E
on ig/P /83 DL.L P2/BC ASchwencer P /y/83 l
OELD~
ge,gJ ~T ovak 12/( r/83 12flZI/8
h I
fi P,
f 7
C~
i
'elf,g 1 I,
~
l1
'I /II h
I l
ATTACHMENT TO LICENSE AMENDMENT NO. 19 N.NP-1 CK N
-3 Replace the following pages of the Appendix "A" Technical Specifications with enclosed pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
REMOVE 3/4 8-7 3/4 8-8 INSERT 3/4 8-7 3/4 8-8
TABLE 4. 8. 1. 1. 2-1 DIESEL GENERATOR TEST SCHEDULE Number of Failures in Last 100 Valid Tests~
> 4 At least once per 31 days At least once per 14 days At least once per 7 days At least once per 3 days "Cr iteria for determining number of failures and number of valid tests shall be in accordance with Regulatory Position C.2.e of Regulatory Guide 1.108, Revision 1, August 1977, where the last 100 tests are determined on a per nuclear unit basis.
For the purposes of this test schedule, only valid tests conducted after the OL issuance date shall be included in the computation of the "last 100 valid tests."
Entry into this test schedule shall be made at the 31 day test frequency.
SUS(UEHANNA - UNIT 1 3/4 8-7
TABLE 4.8.1.1. 2-2 UNIT 1 AND COMMON DIESEL GENERATOR LOADING TIMERS DEVICE TAG NO.
K116A K116B K125A K125B 62X-20104 62X-20204 62X1-20304 62X1-20404 62X2-20304 62X2-20404 62X3-20304 62X3-20404 62X2-2C'310 62XZ-20410 62AX2-20108 62AXZ-20208 62AX2-20303 62AX2-20403 62X-516 62X-526 62X-536 62X-546 62A-20102 62A-20202 62A-20302 62A-20402 SUSQUEHANNA - UNIT 1 SYSTEM CS pp 1A CS pp 1B CS pp 1C CS pp 1D Emerg Switchgear Rm cooler A &
RHR SN pp H&V fan A
Emerg Switchgear Rm cooler B &
RHR SN pp H&V fan B
Control Structure Chillwater System Control Structure Chi llwater System Control Structure Chillwater System Control Structure Chillwater System Control Structure Chi llwater System Control Structure Chi llwater System Control Structure Chi llwater System Control Structure Chillwater System Emerg SW Emerg SW Emerg SW Emerg SW DG Rm Exh Fan A
DG Rm Exh Fan B
DG Rm Exh Fan C
DG Rm Exh Fan D
RHR Pump 1A RHR Pump 1B RHR Pump 1C RHR Pump 1D 3/4 8-8 LOCATION 1C626 1C62/
1C626 1C627 OC877A OC8778 OC877A OC8778 OC877A OC8778 OC877A OC8778 OC876A OC876B 1A201 1A202 1A203 1A204 OB516 08526 08536 OB546 1A201 1A202 1A203 lA204 TIME SETTING 10.5 sec 10.5 sec 10.5 sec 10 '
sec 60 sec 60 sec 3 ml n 3 min 3.5 min 3.5 min 60 sec 60 sec 3 min 3 min 40 sec 40 sec 44 sec 4" sec 2 min 2 min 2 ml n 2 min 3 sec 3 sec 3 sec 3 sec Amendment No.l9 I 16 I 16